Proposed Furnishing Work of our Bank Branch at SBBJ Gurgaon

Company

State Bank of Bikaner and Jaipur

Tender Date

02/04/2010

Published Date

Submission Date

4/23/2010 3:00:00 PM

Open Date

4/23/2010 3:30:00 PM

Work Name

Proposed Furnishing Work of our Bank Branch at SBBJ Gurgaon

Work Location

Delhi

Address

SBBJ

Description

Proposed Furnishing Work of our Bank Branch at SBBJ Gurgaon

a

FURNISHING WORK OF THE BANK BRANCH FOR SBBJ

AT GURGAON

TENDER DOCUMENTS

STATE BANK OF BIKANER & JAIPUR

REGIONAL OFFICE,

SECTOR- 17D, CHANDIGARH

b

PROPOSED FURNISHING WORK OF THE BANK BRANCH AT SBBJ

GURGAON

INDEX

S.No. PARTICULARS PAGE NO. NO. OF PAGES

1. Notice of Invitation of Tender 1 1

2. General Rules & Instructions 2 – 44 43

3. Approved makes 45 1

4. G Schedule 46-56 11

TOTAL 56

1

( SBBJ , REGIONAL- IV , CHANDIGARH)

M/s---------------

Dear sir,

PROPOSED FURNISHING WORK OF BANK’S BRANCH AT

GURGAON

NOTICE FOR INVITATION OF TENDER

Sealed tenders on item rate basis are invited from the competent enlisted Furnishing

contractors who are in the panel of SBBJ Zonal office Delhi or in the panel of SBP whose office

is located in the states of Haryana / Punjab/Chandigarh (UT), having sound technical and

financial capacity for the aforesaid work. Tender documents may be down loaded from the

Bank's web - site (http://www. sbbjbank. com) as well as Govt’s web-site

(http://www.tendergovt.in) can also be obtained from the office of the undersigned.. While

submitting tender, a crossed Demand Draft for Rs. 500/- ( Five hundred only) ( Non -

refundable) is to be enclosed against cost of the tender, payable at New Delhi and drawn in

favour of State Bank of Bikaner and Jaipur.

Estimated cost of the work RS. 4.70 Lakh

Earnest Money; RS. 5000/- (Five Thousand only) by

crossed Demand Draft payable at

Chandigarh and drawn in favour of SBBJ.

Place where tenders to be submitted IN THE TENDER BOX KEPT AT 3RD

FLOOR MARKED AS CHANDIGARH

REGION, SBBJ, ZONAL OFFICE,

SHANKAR ROAD, NEW RAJINDER

NAGAR, NEW DELHI-110060

Time and date of submission of Tender ; Upto 3.00 p.m. on 23.04.2010

Time and date of opening of tenders : 3.30 PM. on 23.04.2010

ASSTT. GENERAL MANAGER –IV

CHANDIGARH

2

GENERAL RULES AND INSTRUCTIONS FOR THE GUIDANCE OF

THE TENDERS

PROPOSED FURNISHING WORK OF THE BANK BRANCH AT SBBJ GURGAON

1. Tenders are hereby invited on behalf of State Bank of Bikaner and Jaipur for the

PROPOSED FURNISHING WORK OF THE BANK BRANCH AT

GURGAON

2. Contract documents consisting of agreement and the set of conditions of contract

to be complied with by the person whose tenders may be accepted, Schedule of

quantities of various classes of work to be done and drawings which will also be

found in the form of tenders, Tender documents may be down loaded from the

Bank's web - site (http://www. sbbj bank. com) as well as Govt’s web-site (

http://www.tendergovt.in) Or can also be obtained from the office of the

undersigned. While submitting tender, a crossed Demand Draft for

Rs. 500/- ( Five Hudred only) ( Non - refundable) is to be enclosed against

cost of the tender, payable at Chandigarh and drawn in favour of SBBJ

during the office hours on working days. Therefore, contractors are advised to

visit the site before quoting the rates.

3. Tenders, which should always be placed in sealed cover, with the name of the

project written on the envelopes may be submitted /Dropped IN THE TENDER

BOX KEPT IN THE DGM SECTT., SBBJ, ZONAL OFFICE, SHANKAR

ROAD, NEW RAJINDER NAGAR, NEW DELHI-110 060

4. The time allowed for carrying out of the work will be 30- days form the 10th day

after the date of written order to commence work.

5. The contractors should quote in figures as well as in words, the rate and amount

tendered by them. The amount for each item should be worked out and the

requisite totals given.

6. When a contractor signs a tender in an Indian language the percentage above or

below and the tendered amount and the total amount tendered should also be

3

written in the same language. In the case of illiterate contractors, the rates or the

amounts tendered should be attested by a witness.

7. Issue of tender form will be stopped one day before the date fixed for the opening

of tenders.

8. Earnest money amounting to Rs.5000/- ( Rupees Five Thousand only) in the

form of Bank draft drawn in favour of the AGM-IV, State Bank of Bikaner

& Jaipur, Regional office, Chandigarh, must accompany with each tender

and each tender is to be in a sealed cover super scribed " TENDER FOR

PROPOSED FURNISHING WORK OF THE BANK BRANCH AT

GURGAON

9. The Contractor, whose tender is accepted, will be required to furnish by way of

security deposit for the due fulfillment of his contract, such sum as will amount to

10.00% of the estimated cost of work. The S.D. shall be collected as detailed in

the general conditions of the contract.

The EMD of the contractor, whose tender is accepted, shall be forfeited in full in

case he does not remit the Initial Security Deposit within the stipulated period or

start the work by the stipulated date mentioned in the award letter.

10. The acceptance of tender will rest with the State Bank of Bikaner & Jaipur which

does not bind itself to accept the lowest tender, and reserves to itself the

authority to reject any or all of the tenders received without the assignment of a

reason. All tenders in whom any of the prescribed, conditions are not fulfilled or

are incomplete in any respect are liable to be rejected.

The Bank reserves the right to accept the tender in full or in part and the tenderer

shall have no claim for revision of rates or other conditions, if his tender is

accepted in parts.

11. Canvassing in connection with tenders is strictly prohibited and the tenders

submitted by the contractors who resort to canvassing will be liable to rejection.

4

12. All rates shall be quoted on the proper form of the tender alone.

13. An item rate tender containing percentage below/ above will be summarily

rejected. However, where a tenderer voluntarily offers a rebate for payment

within a stipulated period, this may be considered.

14. On acceptance of the tender, the name of the accredited representatives(s) of

the contract or who would be responsible for taking instructions from the

Employer/ shall be communicated to the Employer.

15. Special care should be taken to write the rates in figures as well as in words and

the amounts in figures only, in such a way that interpolation is not possible. The

total amount should be written both in figures and in words. In case of figures,

the words "RS." should be written before the figures, e.g. Rs.2.15 'P' and in case

of word 'Rupees' should precede and the worked 'Paise' should be written at the

end, unless the rate is in whole rupees and followed by the words 'only' it should

invariably be up to two decimal places. While quoting the rate is in schedule of

quantities, the word ‘only’ it should invariable be up to two decimal places. While

quoting the rate is in schedule of quantities the word 'only' should be written

closely following the amount and it should not be written in the next line.

16. The bank does not bind itself to accept the lowest or any tender and reserves to

itself the right of accepting the whole or any part of the tender and the tenderer

shall be bound to perform the same at the rate quoted.

17. Sales Tax or any other tax on material or on finished works like work's contract

tax, Turn - over etc. in respect of this contract shall be payable by the contractor

and the Bank will not entertain any claim whatsoever in this respect . This

particular aspect should be mentioned in the tender notice.

18. The contractor shall give a list of his relatives working with the Bank along with

their designations and addresses.

19. No employee of the bank is allowed to work as a contractor for a period of two

years of his retirement from Bank service, without the previous permission of the

bank. This contract is liable to be cancelled if either the contractor or any of his

5

employees is found at any time to be such a person who has not obtained the

permission of the Bank as aforesaid before submission of the tender or

engagement in the contractor's service.

20. The tender for works shall remain open for acceptance for a period of 90 (ninety)

days from the date of opening of tenders. If any tenderer withdraws his tender

before the said period, then the bank shall be at liberty to forfeit Earnest Money

paid along with the tender.

21. The tender for the work shall not witness by a contractor or contractors who

himself/themselves have/have tendered or who may and had/have tendered for the

same work. Failure to observe this condition would render tenders of the

contractors tendering as well as witnessing the tender liable to summary rejection.

22. It will be obligatory on the party of the tenderer to tender and sign the tender

documents for all the component parts and that, after the work is awarded, he will

have to enter into an agreement for each component with the competent authority

in the bank.

23. The tender, apart from being a competent contractor must associate himself with

agencies of the appropriate class who are eligible to tender for (i) electrical (ii)

Air-conditioning work

Signature

AGM- IV,

SBBJ,

CHANDIGARH

6

A G R E E M E N T

1. THIS AGREEMENT made on the ---------------------------------------day of----------

-------------------2010 between --------------------------------------------------------------

----(herein referred to as "the Contractor" which expression shall, unless

repugnant to the context of meaning thereof be deemed to include its/his legal

heirs, executors, administrators and assigns of the one part and the state Bank of

Bikaner & Jaipur, a corporation constituted under the State Bank of India

( Subsidiary Banks) Act, 1959, and having its Head Office at Tilak Marg, CScheme,

Jaipur hereinafter referred to as "the Employer", which expression shall

unless repugnant to the context or meaning thereof be deemed to include its

successors and assigns of the other part.

2. WHEREAS the said employer requires execution of certain works to be

carried out for the “PROPOSED FURNISHING WORK OF THE BANK

BRANCH AT SBBJ GURGAON

(hereinafter the aforesaid works are collectively referred to as "the works").

3. WHEREAS the said works are more particularly described in contract documents

consisting of agreement, the set of conditions of contract to be complied with by

the contractor, schedule of Quantities and drawings are annexed herewith as part

and partial of this agreement. The parties to the contract agree to abide by the

same.

4. WHEREAS, the employer has invited the tenders from the contractor already prequalified

by the Bank. The contractor has also given his tender which was opened

on ----------------------------- and it has been accepted by the Bank vide letter No. --

-----------------------Dated--------------------------.

7

Now it is hereby agreed as follows:

5. WHEREAS in consideration of the payments to be made to the contractors as

hereinafter provided, the contractor shall upon and subject to the set of said

conditions described in the contractual documents, execute and complete the works

as shown in the said plans, drawings, complete , specifications, schedule of

quantities of the various classes of works to be done and such further detailed

drawings plans and specification as may be furnished /provided to him by the said

employer and described in the said specifications and on the said price of schedule

of quantities.

6. The AGM IV of the employer shall exercise powers on behalf of the said employer

for the purpose of the Contract Agreement.

7. WHEREAS both the parties agree to sign the following annexure annexed to this

agreement in token of their acceptance :-

i) Agreement

ii) General conditions of contract

iii) Safety Code

iv) Priced Bill of Quantities and

v) Drawings

8. The Bank shall pay the contractor such sum as shall become payable hereunder at the

times and in the manner specified in the said conditions mentioned in the General

Conditions of contract.

9. WHEREAS the contractor hereby undertakes and agrees to carry out and complete

the works within 90- days form the 10th day after the date of written orders to

commence the works are given to the contractor. The contractor agrees and has

deposited the sum of RS. -------------------------- By way of initial security deposit for

due fulfillment of this contract for the works. It is agreed that the security deposit shall

8

be deducted from each running bills as per clause - 11 and refunded to the contractor

as per clause - 13 of the General Conditions of the contract annexed herewith.

10. WHEREAS it is agreed that the earnest money amounting to RS. -------- deposited by

the contractor in the form of demand draft along with the tender shall be forfeited in

full. In case contractor does not remit the initial security deposit within the stipulated

period of start the works by the stipulated date mentioned in the award letter

11. WHEREAS Shri ----------------------------------------------------- in the accredited

representative(s) of the contractor who would be responsible for taking instructions

from the employer in relation to the works. The contractor agrees to pay sales tax, or

any other tax on material or finished works like works contract tax, turnover tax etc.

including Income Tax in respect of this contract of the works and the employer will

not entertain any claim whatsoever in this report, nor the employer will not entertain

any claim whatsoever in this report, nor the employer shall responsible to pay any

tax as mentioned above. If due to non- payment of any of the aforesaid tax or other

taxes connected with the works, the contractor suffers any loss or damages or

delays in completing the works, the employer will not be responsible for such loss

or damages occurred to the contractor, and the employer will be entitled to claim

damages from the contractor for non-completion of the work within 45 days as

stipulated in Para -9 above.

12. WHEREAS the contractor hereby declares the list of all the relative working with

the employer which is annexed herewith and marked C-1.

OR

WHEREAS as contractor declares that none of his relative is working with the

employers.

13. WHEREAS the contractor declares that he has associated himself with the agencies

of the appropriate classes of person for (i) electrical (ii) sanitary and water supply

installation etc. or any other specialized job to complete the works.

14. The plans, drawings, specifications, contract documents and the documents above

mentioned shall form basis of this contract and the decision of Asstt General

Manager, Chandigarh for the time being as mentioned in the conditions of contract

in reference to all matters of dispute as to material, workmanship or account and as

9

to the intended interpretation of the clauses of the agreement or any of the document

attached hereto shall be final and binding on both parties and may be made rule of

the court.

15 The works comprises PROPOSED FURNISHING WORK OF THE BANK

BRANCH AT SBBJ GURGAON

above mentioned and all subsidiary and other works connected therewith on the

same site as may be ordered to be done from time to time by the said Asstt General

Manager, Chandigarh for the time being even though such works may not have been

shown on the drawings plans or described in the said specifications or schedule of

quantities of various classes of work to be done.

16 The employer through the Asstt. General Manager -1V, Delhi Zone reserves himself

the right of altering the plans, drawings , and nature of work and of adding to or

omitting any items of work or having portions of the same carried out

departmentally or otherwise and such alterations or variations shall be carried out

without prejudice to this contract.

17. All disputes arising out of or in any way connected with this agreement shall be

deemed to have arisen in Jaipur and only the courts of Jaipur shall have jurisdiction

to determine the same.

18. The several parts of this contract have been read to us and fully understood by us.

IN WITNESS whereof the parties above-named have executed these presents today

and year first hereinabove written.

Signed, sealed and delivered by:

Authorised representative Authorised representatives

of Employer of Contractor

10

GENERAL CONDITIONS OF CONTRACT

Except where provided for in the description of the individual items in the

schedule of quantities and in the specifications and conditions laid down

hereinafter and in the drawings, the work shall be carried out as per standard

specifications described in the tender documents and under the directions of

Employer/Architects/Engineer.

1. INTERPRETATION :

In construing these conditions, the specifications, the schedule of quantities,

tender and Agreement, the following words shall have the meaning herein

assigned to them except where the subject or context otherwise requires ;

(i) Employer ; The terms Employer shall denote state Bank of Bikaner and Jaipur

with their head office at Tilak Marg, Jaipur and any of its employees

representatives authorised on their behalf.

(ii) Architects ; The term Architects shall mean “ Bank’s Civil Engineer “ in the

event of his/ their ceasing to be Architects for the purpose of this contract such

other person/s as the Employer shall nominate for the purpose.

(iii) Contractor : The term Contractor shall mean --------------------------------------------

--------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------

---- and his/their heirs, legal representatives, assigns and successors.

(iv) Site : The site shall mean the site where the works are to be executed as shown

within boundary in red border on the site plan including any building and

erections thereon allotted by the employer for the contractor's use.

(v) Site Engineer : The Site Engineer shall be appointed by the Bank. The bank may

also determine the number of Site Engineer and the supporting staff at site office

11

to assist them and also whether the Site Engineer shall be temporary or

permanent. As far as possible, the Site Engineer should assume charge of his post

before the contractor report on site of work. When more than the Site Engineer is

appointed, one of them shall be designated as Senior Site Engineer by the Estate

Department and the other Site Engineer shall be reporting to the Senior Site

Engineer.

(vi) Drawings: The work is to be carried out in accordance with drawings,

specifications, the schedule of quantities and any further drawings which may be

supplied or any other instructions, which may be given by the Employer during

the execution of the work.

All drawings relating to work given to the contractor together with a copy of

schedule of quantities are to be kept at site and the Employer/Architects shall be

given access to such drawings or schedule of quantities whenever necessary.

In case any detailed Drawings are necessary contractor shall prepare such detailed

drawings and/or dimensional sketches therefore and have it confirmed by the

Employer/Architects prior to taking up such work.

The contractor shall ask in writing for all clarifications on matters occurring

anywhere in drawings, specifications and schedule of quantities or to additional

instructions at least 7- days ahead from the time when it is required for

implementation so that the Employer may be able to give decision thereon.

(vii) "The works” shall mean the work or works to be executed or done under this

contract.

12

(viii) "Act of Insolvency” shall mean any act as such as defined by the Presidency

Towns Insolvency act or in Provincial Insolvency act or any amending statues.

(ix) "The schedule of Quantities” shall mean the schedule of quantities as specified

and forming part of this contract".

(x) "Priced schedule of Quantities” shall mean the schedule of quantities duly priced

with the accepted quoted rates of the contractor.

2. SCOPE :

The work consists of Constructions of Employer's PROPOSED

FURNISHING WORK OF THE BANK BRANCH AT SBBJ GURGAON

in accordance with the "Drawing” and “Schedule of Quantities". It includes

furnishing all materials, labour tools, and equipment and management necessary

for and incidental to the construction and completion of the work. All work,

during its progress and upon completion, shall conform to the lines, elevations

and grades as shown on the drawings furnished by the Employer/Architects.

Should any details essential for efficient completion of the work be omitted from

the drawings and specifications it shall be the responsibility of the contractor to

inform the Employer/Architects and to furnish and install such detail with

Employer's /Architects and to furnish and install such detail with Employer's

/Architects concurrence, so that upon completion of work proposed work the

same will be acceptable and ready for use.

Employer/Architects may in their absolute discretion issue further drawings and

or/written instructions, details, directions and explanations, which are, hereafter

collectively referred to as "The Employer's / Architect's instructions" in regard to

:

(a) The variation or modification of the design quantity or quantity of works or the

additional or omission or substitution of any work.

13

(b) Any discrepancy in the drawing or between the schedule of quantities and/or

drawings and /or specifications.

© The removal from the site of any defective material brought thereon by the

contractor and the substitution of any other material thereof.

(d) The demolition removal and/or re-executed of any work executed by the

contractor/s.

(e) The dismissal from the work of any persons employed thereupon.

(f) The rectification and making good if any defects under clauses hereinafter

mentioned and those arising during the maintenance period (retention period).

The Contractor shall forthwith comply with and duly execute any work

comprised in such Employer's /Architects' instructions provided always that

verbal instructions , directions and explanations given to the contractor's or his

representative upon the works by the Employer/Architects shall if involving a

variation be confirmed in writing to the contractor/s within seven days. No

works, for which rates are not specifically mentioned in the priced schedule of

quantities, shall be taken up without written permission of the

Employer/Architects. Rates of items not mentioned in the priced schedule of

quantities shall be fixed by the employer in consultation with the

Architects/Employer. As provided in the clause 'variation'.

The contractor shall set up a field laboratory with necessary equipments for a day

to day testing of materials like grading of coarse and fine aggregates, silt content

and bulk age of sand etc.

Regarding all factory made products for which ISI marked products are available

only products bearing ISI marking shall be used in the work.

14

3. TENDERER SHALL VISIT THE SITE :

Intending tenderer shall visit the site and make him thoroughly acquainted with

the local site condition, nature and requirements of the works facilities of

transport condition, effective labour and materials, access and storage for

materials and removal of rubbish. The tenderer shall provide in their tender for

cost of carriage, freight and other charges as also for any special difficulties and

including police restriction for transport etc. for proper execution of work as

indicated in the drawings. The successful tenderer will not be entitled to any

claim on account of any site conditions which in the opinion reasonably been

inferred to be so existing before commencement of work.

4. TENDERS :

The entire set of tender paper issued to the tenderer should be submitted fully

priced and also signed on the last page together with initials on every page;

Initial/ signature will indicate the acceptance of the tender papers by the tender.

(Also see Para 15 of General Rules and Instructions for guidance of tenderer).

(i) The ‘Rate’ column to be legible filled in ink in both English figures and English

words.

(ii) Amount column to be filled in for each item and the amount for each subhead as

detailed in the "Schedule of Quantities.”

(iii) All corrections are to be initialed.

(iv) The 'Rate Column’ for alternative items shall be filled up.

(v) The 'Amount' column for alternative items of which the quantities are not

mentioned shall not be filled up.

15

No modifications, writings or corrections can be made in the tender papers by the

tender, but may at his option offer his comments or modifications in a separate

sheet of paper attached to the original tender papers.

The Employer reserves the right to reject the lowest or any tender and also to

discharge any or all the tenders for each section or to split up and distribute any

items of work to any specialist firm or firms, without assigning any reason.

The tenderer should note that the tender is strictly on the item rate basis and their

attention is drawn to the fact that the rates for each and every item should be

correct, workable and self-supporting. If called upon by the Employer/Architects

detailed analysis of any or all the rates shall be submitted. The

Employer/Architects shall not be bound to recognize the contractor’s analysis.

The works will be paid for as "measured work” on the basis of actual work done

and not as "lump sum” contract.

All items of work described in the schedule of quantities are to be deemed and

paid as complete works in all respects and details including preparatory and

finishing works involved, directly related to and reasonably detectable from the

drawings, specifications and schedule of quantities and no further extra sum

charges in the tender in respect of any item of works, the payment of such items

of work will be made for the actual work done on the basis of lump-sum charges

as will be assessed to be payable by the Employer/Architects.

The employer has power to ad, or omit from any work as shown in drawings or

described in specifications or included in scheduled of quantities and intimate

the same in writing but no addition, omission or variation shall be made by the

contractor without authorization from the Employer. No variation shall vitiate the

contract.

The tenderer shall note that his tender shall remain open for consideration for a

period of 3 (three) months from the date of opening of tender.

16

5. AGREEMENT :

The successful contractor may be required to sign agreement as may be drawn up

to suit local conditions and shall pay for all stamps and legal expenses, incidental

thereto.

6. GOVERNMENT AND LOCAL RULES

The contractor shall confirm to the provisions of all local Bye-laws and acts

relating to the work and to the Regulations etc. Of the Government and Local

Authorities and of any company with whose system the structure is proposed to

be connected. The contractor shall give all notices required by the said act, Rules,

Regulations and Bye-laws etc. and pay all fees payable to such authority /

authorities for execution of the work involved. The cost, if any, shall be deemed

to have been included in his quoted rates, taking into account all liabilities for

licences, fees for footpath encroachment and restorations etc., and shall indemnify

the employer against such liabilities and shall defend all action arising from such

claims or liabilities.

7. TAXES AND DUTIES

The tenderer must include in their tender prices quoted for all duties royalties,

cess and Sales Tax , service tax or any other taxes or local charges if applicable.

No extra claim on this account will , in any case, be entertained.

8. PROVISIONAL SUMS (PS)

All provisional sums described in the schedule of quantities as P.S. shall be

exclusively allotted to the purchase of materials and not for any handling and

fixing to be done by the contractor. Such costs of handling and fixing with profit

( including transport charges if required) shall be separately included in the

contract price as described in the schedule of quantities. The disposal of the

amounts covered under this head will be absolutely at the discretion of the

Employer. Contractor is to make payments for these materials to the suppliers on

certificate or order issued by the Employer/Architects and realize them through

his bills from the Employer.

17

9. QUANTITY OF WORK TO BE EXECUTED :

The quantities shown in the schedule of quantities are intended to cover the entire

work indicated in the drawings G-Schedule of Tender but the Employer reserves

the right to execute only a part or the whole or any excess thereof without

assigning any reason therefore.

10. OTHER PERSONS ENGAGED BY THE EMPLOYER :

The employer reserves the right to execute any part of the work included in this

contract or any work which is not included in this contract by other Agency or

persons and contractor shall allow all reasonable facilities and use of his

scaffolding for the execution of such work, the main contractor shall extend all

cooperation in this regard.

11. EARNEST MONEY AND SECURITY DEPOSIT :

The tenderer will have to deposit an amount of Rs.--------- ( Rupees -------

Thousand only) in the form of Bank Draft drawn in favour of State Bank Of

Bikaner & Jaipur at the time of submission of tender as an Earnest Money. The

employer is not liable to pay any interest on the Earnest Money. The Earnest

Money of the unsuccessful tenders will be refunded without any interest soon

after the decision to award the work is taken or after the expiry of the validity

period of the tender.

The successful tenderer to whom the contract is awarded will have to deposit as

initial security deposit a further sum to make up 2% of the value of the accepted

tender including the Earnest Money. The initial Security Deposit will have to be

made within 7- days from the date of acceptance of tender, failing which the

Employer at his discretion may revoke the letter of acceptance and forfeit the

Earnest Money deposit furnished along-with the tender. The initial Security

18

Deposit will be invested by the Employer in a fixed deposit account for the

duration of the contract along with accrued interest within fourteen days after the

issue of certificate of virtual completion.

Apart from the initial security deposit made as above, retention money shall be

deducted from progressive running bills @ 8% of the gross value of each running

bill until the total security deposit, i.e, the initial Security Deposit plus the

retention money equals to 10% of the estimated cost of work.

No interest is allowed on retention money.

A part of the Security Deposit if and as decided by a constituent bank can also be

furnished in the form of a bank guarantee on a Bank other than that of the

constituent bank.

12 DEFECTS LIABILITY PERIOD (DLP )

(a) The defects Liability Period (DLP) shall be 12- months.

(b) It must be realized that his period is for exposure of 'latent defects' such as

settlements, shrinkages or expansion cracks, undue weathering and wear due to

faulty material and workmanship.

© The DLP commences from the certified date of Virtual completion, issued jointly

by the Bank.

13.

RETENTION MONEY

The retention percentage ( i.e. deduction from interim bill) shall be 8% of the

gross value of each interim bill.

The retention amount is refunded to the Contractor 14 (Fourteen) days after the

expiry of the defects liability period provided he has satisfactorily carried out all

the work and attended to all defects in accordance with the conditions of the

contract.

19

The retention amount can be kept with the Bank in the form of Fixed Deposit

pledged to the Bank or Bank Guarantee.

14. CONTRACTOR TO PROVIDE EVERYTHING NECESSARY

The contractor shall provide every thing necessary for the proper execution of the

work according to the intent and meaning of the drawings, schedule off

quantities and specifications taken together whether the same may or may not be

particularly shown or described there in provide that the same can reasonably be

inferred there from and the contractor find any discrepancies therein he shall

immediately and in writing refer the same to the Employer/Architects whose

decision shall be final and binding. The contractor shall provide himself for

ground and fresh water for carrying out of the works at his own cost. The

employer shall on no account be responsible for the expenses incurred by the

contractor for hired ground or fresh water obtained from elsewhere.

The rates quoted against individual items will be inclusive of everything

necessary to complete the said items of work within the contemplation of the

contract, and beyond the unit price no extra payment will be allowed for

incidental or contingent work, labour and/or materials inclusive of all taxes and

duties whatsoever except for specific items, if any stipulated in the tender

documents.

The contractor shall supply, fix and maintain at his own cost, for the execution of

any work, all tools backles, machineries and equipments and all the necessary

centering, scaffolding, staging, planking, timbering, strutting, shorting, pumping,

fencing, boarding, watching and lighting by night as well as by day required not

only for the proper execution and protection of the said work but also for the

public and safety of any adjacent roads, streets, walls , houses , buildings, all

other erections, matters and things and the contractor shall take down and remove

any or all such centering, scaffolding, planking, timbering, strutting, shorting etc.

20

as occasion, shall be required or when order so to do, and shall fully reinstate

and make good all matters and things disturbed during the execution of works to

the satisfaction of the Employer/Architects.

The contractor shall also provide such temporary road on the site as may be

necessary for the proper performance of the contract, and for his own

convenience but not otherwise. Upon completion, such roads shall be broken up

and leveled where so required by the drawings unless the Employer shall

otherwise direct.

The contractor shall, at all times, give access to workers employed by the

Employer or any men employed on the buildings and to provided parties with

proper, sufficient and if required, special scaffolding hoists and ladders and

provided them with water and lighting and leave or make any holes, grooves etc.,

in any work, where directed by the employer as may be required to enable such

workmen to lay or fix pipes, electrical wiring, special fittings etc. the quoted

rates of the tenderers shall accordingly include all these above mentioned

contingent works.

15 TIME OF COMPELTION, EXTENSION OF TIME & PROGRESS

CHART :

(i) Time of Completion : The entire work is to be completed in all respect within the

stipulated period. The work shall deemed to be commenced within 10th days

form the date of work order. Time is the essence of the contract and shall be

strictly observed by the contractor.

The work shall not be considered as completed until the Employer/Architects

have certified in writing that this has been completed and the Defects Liability

Period shall commence from the date of such certificate.

(ii) Extension of Time : If in the opinion of the Employer/Architects the works be

delayed (a) by reason of any exceptionally inclement weather, or (b) by reason of

21

instructions from the Employer in consequence of proceedings taken or

threatened by or disputes, with adjoining or neighboring owners or (c) by the

works, or delay, of other contractors or tradesmen engaged or nominated by the

Employer and not referred to in the specification or (d) by reason of authorized

extra and additions or (e) by reason of any combination of workmen or strikes or

lock-out affecting any of the building trades or (f) from other cause which the

Employer may consider are beyond the control of the contractor, the Employer at

the completion of the time allowed for the contract shall make fair and

reasonable extension of time for completion in respect therefore. In the event of

the Employer failing to give possession of the site upon the day specified above

the time of completion shall be extended suitably.

In case of such strikes or lock-outs, as are referred to above, the contractor shall,

immediately give the Employer, written notice thereof. Nevertheless, the

contractor shall use his best endeavors to prevent delay, and shall do all that may

be reasonable required, to the satisfaction of the Employer to proceed with the

works and on his doing so that it will be ground of consideration by the

Employer for an extension of time as above provided . The decision of the

Employer as to the period to be allowed for an extension of time for completion

hereunder which decision shall be final and binding on the contractor) shall be

promulgated at the conclusion of such strike or lock out and the Employer shall

then, in the event of an extension being granted, determine and declare the final

completion date. The provision in clause-15 with respect to payment of

liquidated damages shall, in such case, be read and construed as if the extended

date fixed by the Employer were substituted for and the damage shall be

deducted accordingly.

(iii) Progress of work: During the period of construction the contractor shall maintain

proportionate progress on the basis of a Program Chart submitted by the

contractor immediately before commencement of work and agreed to by the

Employer/Architects. Contractor should also include planning for procurement of

scarce material well in advance and reflect the same in the Program Chart so that

there is no delay in completion of the project.

22

16 LIQUIDATED DAMAGES

Should the work be not completed to the satisfaction of the Employer/ Architects

within the stipulated period, the contractor shall be bound to pay to the Employer

a sum , Rs. 1,500/- per day by way of liquidated damages ( not exceeding the

total S.D. of the contract) and not as penalty during which the work remains uncommenced

or unfinished after the expiry of the completion date.

17. TOOLS , STORAGES OF MATERIALS, PROTECTIVE, WORK AND

SITE OFFICE REQUIREMENTS :

The contractor shall provide, fix up and maintain in an approved position proper

office accommodation for the contractor's representative and staff which offices

shall be open at all reasonable hours to receive instruction notices or

communications and clear away on completion of the works and make good all

work disturbed.

All drawings maintained on the site are to be carefully mounted on boards of

appropriate size and covered with a coat of approved varnish. They are to be

protected from ravages of termites, ants, and other insects.

The contractor shall provide at his own cost all artificial light required for the

work and to enable other contractors and sub-contractors to complete the work

within the specified time.

The contractor shall provide a suitable temporary hut for the watchmen and clear

way the same when no longer required and to provide all necessary attendance,

light etc., required

The contractor shall arrange for temporary latrines for the use of workers and

field staff and keep the same in clean and sanitary condition to the satisfaction of

the Public Health Authorities and shall cause such latrines and soil to be cleared

away whenever necessary and shall make good all the works disturbed by these

conveniences.

23

Every precaution shall be taken by the contractor to prevent the breeding of

mosquitoes on the works during the construction, and all receptacles cisterns,

water tanks etc, used for the storage of water must be suitably protected against

breeding of mosquitoes. The contractor shall indemnify the Employer against any

breach of rules in respect of anti-malaria measures.

The contractor shall not fix or place any placards of advertisement of any

description or permit the same to be fixed or placed in or upon any boarding,

gantry building structure other than those approved by the Employer.

Protective Measures : The contractor from the time of being placed in possession

of the site, must make suitable arrangements for watching, lighting and

protecting the work, the site and surrounding property by day, by night , on

Sundays and other holidays.

Contractor shall indemnify the Employer against any possible damages to the

building, roads, or members of the public in course of execution of the work.

The contractor shall provide necessary temporary enclosures, gates, entrances,

etc., for the protection of the work and materials and for altering and adopting the

same as may be required and removing on completion of the works and making

good all works disturbed.

STORAGE OF MATERIALS : The contractor shall provide and maintain

proper sheds for the proper storage and adequate protection of the materials etc.,

and other work that may be executed on the site including the tools and materials

of sub-contractors and remove same on completion.

Cement godown shall be constructed for storing about six weeks' requirements of

cement and stored as per norms with a stack of 10 bag and each and 2 feet

opening al around with 2 feet passage of each stack. Structure shall be water

proof from all the sides and top cement should be stored one feet above and

ground level and have puce raised floor.

24

So also reinforcement bars are to be stores above the ground level to prevent the

same for getting rusted.

TOOLS : The todolite levels, prismatic compass, chain, steel and metallic tapes

and all other surveying instruments found necessary on the works shall be

provided by the contractor for the due performance of this contract as instructed

by the Site Engineer.

All measuring tapes shall be steel and suitable scaffolding and ladders that may

be required for safely taking measurement and shall be supplied by the contractor.

The mysteries and the supervisors on the works shall carry with them always a

one meter or two meter steel tape , a measuring tape of 30 meters, a spirit level, a

plum bob and a square and shall check the work to see that the work is being

done according to the drawing the specifications. The Site Engineer will use any

or all measuring instruments or tools belonging to the contractors as he chooses

for checking the works evicted or being executed on the contractor.

The contractor shall cover in his rates for making provisions for all reasonable

facilities for the use of his scaffolding, tools and plant etc. by sub-contractors

for their work.

18 NOTICE AND PATENTS OF APPROPRIATE AUTHORITY AND

OWNERS

The contractor shall conform to the provisions of any Acts of the Legislature

relating to the work, and to the regulations and By-laws of any authorities, and/or

any water, lighting and other companies, and/or authorities with whose systems

the structures were proposed to have connection and shall before making any

variations from the drawings or specification that may be associated to so

conform, give the Employer/Architects written notices specifying the variations

proposed to be made and the reasons for making them and apply for instruction

25

thereon. The Employer/ Architects on receipt of such intimation, shall give a

decision within a reasonable time.

The contractor/s shall arrange to give all notices required for by the Said Acts,

Regulations or Bye-laws to be given to any authority, and to pay to such

authority or to any public officer all fees that may be properly chargeable in

respect of the work and lodge the receipts with the Employer.

The contractor shall indemnify the Employer against all claims in respect of

patent rights, royalties, damages to buildings roads or members of public in

course of execution off work and shall defend all action arising from such claims

and shall keep the Employer saved harmless and indemnified in all respects

form such actions, costs and expenses.

19 CLEARING SITE AND SETTING OUT WORKS

The site shows on the plan shall be cleared of all obstructions, loose stone and

materials rubbish of all kinds. All holes or hollows whether originally existing or

produced by removal or loose stone or materials shall be carefully filled up with

earth, well rammed and leveled off as directed at his own cost.

The contractor shall set out the works and shall be responsible for the true and

perfect setting out of the work and for the correctness of the positions, levels,

dimensions and alignment of all parts thereof. If at any time, any error shall

appear during the progress of any part of the work, the contractor shall further

set out the works to the alternative positions at the site until one is finally

approved and the rates quoted in his tender should include for this and no extra

on this account will be entertained.

20. DATUM

The average ground level will be considered as the crown of the nearest road,

which should be taken as "Datum" which is however subject to final

confirmation by the employer/ Architects. al levels shown in the drawings are to

be strictly adhered to .

26

21 BENCHES

The contractor is to construct and maintain roper benches of all the main walls, in

order that the lines and levels may be accurately checked at all times.

These benches will consist of salwood post of adequate length and minimum

diameter 75mm to be driven in the ground at suitable distance as directed

encashed with brickwork. The wire nails will be driven on the top of salwood

post on the center lines of columns, walls, inside and outside faces of foundations

trenches, in order that lines may be stretches between the benches and accurate

intersection of excavation. Center line of walls, columns etc. may be clearly

indicated and checked at any time if it is so required.

22 CONTRACTOR IMMEDIATELY TO REMOVE ALL OFFENSIVE

MATTERS

All soil, filth or other matters of an offensive nature taken out of any trench,

sewer, drain cesspool other place shall not be deposited on the surface but shall

be at once carted away by the contractor to place provided by him.

The contractor shall keep the foundations and works, free from water and shall

provide and maintain at his own expenses electrically or other power driven

pumps and other plant to the satisfaction of the Employer for the purpose, until

the building is handed over to the Employer. The contractor shall arrange for the

disposal of the water so accumulate to the satisfaction of the Employer and local

authority and no claims will be entertained afterwards if he does not include in

his rates for the purpose.

23 ACCESS

Any authorised representative of the Employer shall at all reasonable items have

free access to the works and /or to the workshops, factories or other place where

materials are being prepared or constructed for the works and also to any place

where the materials are lying or from where they are being obtained, and the

contractor shall give every facility to the bank or their representatives necessary

for inspection and examination and test of the materials and workmanship. Except

the representatives of the Employer, no person shall be allowed at any time

without the written permission of the Employer.

27

24 MATERIALS, WORKMANSHI, SAMPLES, TESTING OF MATERIALS

All the works specified and provided for in the specification or which may be

required to be done in order to perform and complete any part thereof shall be

executed in the best and most workman like manner with materials of the best and

approved quality of the respective kinds in accordance’s with the particulars

contained in and implied by the specifications and as represented by the drawings

or according to such other additional particulars, and instructions as may from

time to time be given by the Employer/Engg. /Incharge during the execution of

the work, and to his entire satisfaction.

If required by the Employer/Engg./Incharge the contractor shall have to carry

out tests on materials and workmanship in approved materials testing

laboratories or as prescribed by the Employer/Engg./Incharge at his own cost to

prove that the materials etc. under test conform to the relevant I.S standards or

as specified in the specifications. The necessary charges for preparation of mould

( in case of concrete cube) transporting, testing etc. shall have to be borne by the

contractor. No extra payment on this account should in any case be entertained.

All the materials ( except where otherwise described) stores and equipment

required for the full performance of the work under the contract must be

provided through normal channels and must include charges for import duties,

sales tax, octroi and other charges and must be the best of their kind available

and the contractor/s mus t be entirely responsible for the proper and efficient

carrying out of the work. The work must be done in the best workmanilike

manner. Samples of all materials to be used must be submitted to the

Employer/Engg./Incharge when so directed by the Engineer/Engg/In charge and

written approval from Employer/Engg/Incharge must be obtained prior to

placement of order.

During the inclement whether the contractor shall suspend consorting and

plastering for such time as the Employer/Architects may direct and shall protect

from injury all work when in course of execution. Any damages ( during

28

constructions) to any part of the work for any reasons due to rain, storm, or

neglect of contractor shall be rectified by the contractor in an approved manner at

no extra cost.

Should the work be suspended by reason of rain, strike, lock-outs or any other

cause, the contractor shall take all precautions necessary for the protection of

work and at his own expenses shall make good any damage arising from any of

these causes.

The contractor shall cover up and protect from damage, from any cause , all new

work and supply all temporary/doors, protection to windows, and any other

requisite protection f for the execution of the work whether by himself or special

tradesmen or sub-contractor and any damage caused must be made good by the

contractor at his own expenses.

25 REMOVAL OF IMPROPER WORK

The employer shall during the progress of the work have power to order in

wilting from time to time the removal from the work within such reasonable time

or times as may be specified in the order of any materials which in the opinion

of the Employer/Engg-Incharge are not in accordance with specification or

instructions, the substitution or proper re-execution of any work executed with

materials or workman ships not in accordance with the drawings and

specifications or instructions. In case the contractor refuses to comply with the

order the Employer shall have the power to employ and pay other agencies to

carry out the work and all expenses consequent thereon or incidental thereto as

certified by the Employer/Engg-Incharge shall be borne by the contractor or may

be deducted from any money due to or that may become due to the contractor.

No certificate which may be given by the Architects shall relieve the contractor

from his liability in respect of unsound work or bad materials.

26 CONTRACTOR'S EMPLOYEES :

The contractor shall employ technically qualified and competent supervisors for

the work who shall be available ( by turn) throughout the working hours to

receive and comply with instructions of the Employer/ Engg. In charge. The

29

contractor shall engage at least one experienced Engineer as site - in - charge for

execution of the work. The contractor shall employ in connection with the work

persons having the appropriate skill or ability to perform their job efficiently.

The contractor shall employ local labourers on the work as far as possible.

No labourer below the age of sixteen years and who is not an Indian National

shall be employed on the work.

Any labourer supplied by the contractor to be engaged on the work on day

work basis either wholly or partly under the direct order or control of the

Employer or his representative shall be deemed to be a person employed by the

contractor.

The contrctor shall comply with the provisions of all labour legislation including

the requirements of -

(a) The payment of Wages Act

(b) Employer's Liability Act

(c) Workmen's Compensation Act.

(d) Contractor Labour ( Regulation & Abolition) act, 1970 and Central Rules

1971.

(e) Apprentices act 1961

(f) Any other act or enactment relating thereto any rules framed there under from

time to time.

The contractor shall keep the employer saved harmless and in demnified against

claims if any of the workmen and all costs and expenses as may be incurred by

the Employer in connection with any claim that may be made by any workmen.

The contractor shall comply at his own cost with the order of requirement of any

Health Officer of the State or any local authority or of the Employer regarding

the maintenance of proper environmental sanitation of the area where the

30

contractor's labourers are housed or accommodated for prevention of small pox,

cholera, plague, typhoid, malaria and other contagious diseases. The contractor

shall provide, maintain and keep in good sanitary condition adequate sanitary

accommodation and provide facilities for pure drinking water at all times for

the use of men engaged on the works and shall remove and clear away the same

on completion of the works. Adequate precautions shall be taken by the

contractor to prevent nuisance of any kind on the works or the lands adjoining

the same.

The contractor shall arrange to provide first aid treatment to the labourers

engaged on the works. He shall within 24 hours of the occurrence of any

accident at or about the site or in connection with execution of the works, report

such accident to the employer and also to the competent authority where such

report is required by law.

27. DISMISSAL OF WORKMEN

The contractor shall on the request of the Employer immediately dismiss from

works any person employed thereon by him, who may in the opinion of the

Employer be unsuitable or incompetent or who may misconduct himself. Such

discharges shall not be the basis of any claim for compensation or damages

against the Employer or any of their office of employee.

28 ASSIGNMENT

The whole of the works included in the contract shall be executed by the

contractor and the contractor shall not directly or indirectly transfer, assign or

underlet the contract or any part share of interest therein nor, shall take a new

partner, without written consent of the Employer and no subletting shall releave

the contractor from the full and entire responsibility of the contract or from active

superintendence of the work during their progress.

31

29. DAMAGE TO PERSON AND PROPERTY INSURANCE ETC.

The contractor shall be responsible for all injury to the work or workmen or

persons, animals or things and for all damages to the structural and/or decorative

part of property which may arise form the operations or neglect of himself or of

any sub-contractor or any of his or a sub-contractor's employees, whether such

injury or damages arise from carelessness, accident or any other cause

whatsoever in any way connected with the carrying out of this contract. The

clause shall be held to include inter-alia, any damage to buildings whether

immediately adjacent or otherwise and any damage to roads, streets, foot paths

or ways as well as damages caused to the building and the works forming the

subject of this contract by rain, wind or other inclemency of the whether. The

contractor shall indemnify the Employer and hold harmless in respect of all and

any other expenses arising from any such injury or damages to persons or

property as aforesaid and also in respect of any claim made in respect of injury or

damage under any acts of compensation or damages consequent upon such claim.

The contractor shall reinstate all damage of every short mentioned in this clause,

so as to delivery the whole of the contract works complete and perfect in every

respect and so as to make good or otherwise satisfy all claims for damages to the

property or third parties.

The contractor shall effect the insurance necessary and indemnify the Employer

entirely from all responsibility in this respect. The insurance must be placed with

a company approved by the Employer and must be effected jointly in the name

of the contractor and the Employer and the policy lodged with the latter. The

scope of insurance is to include damage or loss to the contract itself till this is

made over in a complete state. Insurance is compulsory and must be effect

from the very initial stage. The contractor shall also be responsible for anything

which may be excluded from damage to any property arising out of incident,

negligence or defective carrying out of this contract.

The Employer shall be at liberty and is hereby empowered to deduct the amount

32

of any damages, compensations, costs and expenses arising or accruing from or

in respect of any such claim or damages from any sums due or to become due

to the contractor.

30 INSURANCE

Unless otherwise instructed the contractor shall insure the work and keep them

insured until the virtual completion of the contract against loss or damage by

fire and/or earthquake, flood. The insurance must be placed with a company

approved by the Employer, in the joint names of the Employer and the contractor

for such amount and for any further sum if called to do so by the employer, the

premium of such further sum being allowed to the contractor as an authorised

extra.

The contractor shall deposit the policy and receipt for premiums paid with the

Employer within 7 ( seven) days from the date of issue of work order unless

otherwise instructed. In default of the contractor insuring as provided above, the

Employer on his behalf may be insure and may deduct the premiums paid from

any money due, or which may become due to the contractor. The contractor

shall as soon as the claim under the policy is settled or the work reinstated by the

Insurance Company should they elect to do so, proceed with due diligence with

the completion of the works in the same manner as though the fire has not

occurred and in all respects under the conditions of the contract. The contractor in

case of rebinding or reinstatement after fire shall be entitled to extension of time

for completion as the Employer may deem fit.

31. ACCOUNTS RECEIPTS & VOUCHERS

The contractor shall, upon the request of Employer furnish them with all the

invoices, accounts, receipts and other vouchers that they may require in

connection with the works under this contract.

If the contractor shall use materials less than what he is required under the

contract, the value of the difference in the quantity of the materials he was

33

required to use and that he actually used shall be deducted form his dues. The

decision of the Employer shall be final and binding on the contractor as to the

amount of materials the contractor is required to use for any work under this

contract.

32

Before taking any measurement of any work the Site Engineer or a subordinate

deputed by him shall give reasonable notice to the contractor. If the contractor

fails to countersign or to record the difference within a week form the date of

measurement in the manner required by the Site Engineer then in any such

event the measurements taken by the Site Engineer or by the subordinate deputed

by him as the case may be, is final and binding on the contractor and the

contractor shall have no right to dispute the same.

33. PAYMENTS

All bills shall be prepared by the contractor in the form prescribed by the

Employer/Engineer/Incharge Only one interim bill shall be entertained during

the progress of the work ,subject to minimum value for interim certificate ( not

less than 50% of the tendered sum) as stated in these documents. Th bills in

proper forms must be duly accompanied by detailed measurements in support of

the quantities of work done and must show deductions for all previous payments,

retention money etc.

The employer/engineer /incharge shall issue a certificate after due scrutiny of

the contractor's bill stating the amount due to the contractor from the Employer

and the contractor shall be entitled to payment thereof, within the period of

honouring certificates named n these documents.

The employer will deduct retention money as described in clause 11 of these

conditions. The refund of retention money will be made as specified in the said

clause.

If the employer has supplied any materials or goods to the contractor, the cost of

34

such materials or goods will be progressively deducted from the amount due to

the contractor in accordance with the quantities consumed in the work.

All the interim payments shall be regarded as payments by way of advances

against the final payment only and not as payment for work actually done and

completed, and shall not preclude the requiring of bad, unwound and imperfect

or unskilled work to be removed and take away and reconstructed, or re-erected

or be considered as an admission of the due performance or the accruing of any

claim, nor shall, it conclude determine or affected in anyway the power of the

Employer under these conditions or any of them as to the final settlement and

adjustment of the accounts or otherwise or in any other way vary or affect the

contract . The final bill shall be submitted by the contractor within one month of

the date fixed for completion of the work or of the date of certificate of

completion furnished by the Site Engineer and payment shall be made within

three months.

FINAL PAYMENT

The final bill shall be accompanied by a certificate of completion from the

Employer/Engg/Incharge payments of final bill shall be made after deduction of

Retention money as specified in clause 11 of these conditions, which sum shall

be refunded after the completion of the Defects, Liability period after receiving

the Employer's /Engg/In-charge's certificate that the contractor has rectified all

defects to the satisfaction of the Employer/Eng/In-charge. The acceptance of

payment of the final bill by the contractor would indicate that he will have no

further claim in respect of the work executed.

34

(a)

VARIATION / DEVIATION

The price of all such additional items / non - tendered items will be worked out

on the basis of rates quoted for similar items in the contract wherever existing or

on engineering rate analysis based on prevalent fair price of labour, material and

other components as required. The tender rates, shall hold good for any increase

35

(b)

or decrease in the tendered quantities up to variation of 25% . For variation

beyond + 25% the rate for the respective item may be reviewed on mutually

agreed terms.

Where direct applicable rates are not available the rates for extra items, if any,

shall be derived, based on the prevalent market cost for labour and material at

site of work including wastage plus 15% towards tax and Contractor's Profit.

35. SUBSTITUTION

Should the contractor desire to substitute and materials and workmanship, he/

they must obtain the approval of the Employer/Engg/In-charge in writing for any

such substitution well in advance. Materials designated in this specification

indefinitely by such terms as "Equal" or "other approved" etc. specific

approval of the Employer/Architects has been obtained in writing.

36 PREPARATION OF BUILDING WORKS FOR OCCUPATION AND USE

OF COMPLETION

The whole of the work will be thoroughly inspected by the contractor and

deficiencies and defects up to right. On completion of such inspection the

contractor shall inform the Employer that he has completed the work and it is

ready for inspection.

On completion the contractor shall clean all windows and doors including the

cleaning and oiling, if necessary of all hardware, inside and outside, all floors,

stair - cases, and every part of the building. He will leave the entire building

neat and clean and ready for immediate occupation and to the satisfaction of the

bank.

37. CLEARING SITE ON COMPLETION

On completion of the works the contractor shall clear away and remove from the

site all constructional plants, surplus materials, rubbish and temporary works off

every kind and leave and whole of the site and the works clean and in a

workman like conditions to the satisfaction of the Employer/Engg/Incharge.

36

38. DEFECTS AFTER COMPLETION

The contractor shall make good at his own cost and to the satisfaction of the

employer all defects, shrinkage, settlements or other faults which may appear

within 12 months after completion of the work. In default the Employer may

employ and pay other persons to amend and made good such damages, losses and

expenses consequent thereon or incidental thereto, shall be made good and borne

by the contractor and such damages loss and expenses shall be recoverable

from him by the Employer or may be deducted by the employer, in lieu of such

amending and making good by the contractor, deduct from any money due to the

contractor a sum equivalent to the cost of amending such work and in the event

of the amount retained being insufficient , recover that balance from the

contractor from the amount retained under clause No. 12 together with any

expenses the Employer may have incurred in connection therewith.

39. CONCEALED WORK

The contractor shall give due notice, to the Employer/Engg/Incharge whenever

any work is to be buried in the earth, concrete or in the bodies of walls or

otherwise becoming inaccessible later on, in order that the work may be

inspected any correct dimensions taken before such burial in default whereof

the same shall, at the opinion of the Employer/Engg/Incharge by either opened up

. for measurement at the contractor's expenses or no payment may be made for

such materials. Should any dispute or differences arise after the execution of

any works as to measurements etc. or other maters which cannot be conveniently

tested or checked the notes of the Employer/Engg/Incharge shall be accepted as

corrected and binding on the contractor.

40 ESCALATION

The rate quoted shall be firm throughout the tenure of the contract ( including

extension of time if any, granted) and will not be subject to any fluctuation due

to increase in case of materials, labour, sales tax, octroi etc.

37

41 IDLE LABOUR

Whatever the reason may be, no claim for idle labour, additional establishment

cost of hire and labour charges of tools and plants would be entertained under

any circumstances.

42 SUSPENSION

If the contractor except on account of any legal restraint upon the Employer

preventing the continuance of the work or in the opinion of the Employer shall

neglect or fail to proceed with due diligence in the performance of his part of the

contract or if the shall more than once make default, the Employer shall have the

power to give notice in writing to the contractor requiring the work be proceeded

within a reasonable manner and the reasonable dispatch, such notice purport to

be a notice under this clause.

After such notice shall have been given the contractor shall not be at liberty to

remove from the site of the works or from any ground contiguous thereto any

plant or materials to subsist from the date of such notice being given until the

notice shall have been complied with. If the contractor shall fall for 7 (seven)

days after such notice has been given to proceed with the works as therein

prescribed , the employer may proceed as provided in Clause - 43 (

Termination of Contract by Employer).

43 TERMIANTION OF CONTRACT BY EMPLOYER

If the contractor being a company to into liquidation whether voluntary or

compulsory or being a firm shall be dissolved or being an individual shall be

adjudicated insolvent or shall make an assignment or a composition for the

benefit of the greater part, in number of amount of his creditors of shall enter

into a Deed or agreement with his creditors, or if the Official Assignee in

insolvency, or the Receiver of the contractor in insolvency, shall repudiate the

contract, or if a receiver of the contractor's firm appointed by the court shall be

unable, within fourteen days after notice to him requiring him to do so, to show

to the reasonable satisfaction of the employer that he is able to carry out and

fulfill the contract , and if so required by the employer to give reasonable

38

security therefore, or if the contract or shall suffer execution to be issued, or

shall suffer any payment under this contract to be attached by or on behalf of and

of the creditors of the contractor, or shall assign, charge or encumber this

contract or any payments due or which may become due to the contractor, there

under or shall neglect or fail to observe and perform all or any of the acts matters

of things by this contract, to be observed and performed by the contractor within

three clear days after the notice shall have been given to the contractor in manner

hereinafter mentioned requiring the contractor to observe or perform the same or

shall use improper materials or workmanship in carrying on the works, or shall in

the opinion of the employer not exercise such due diligence and make such due

progress as would enable the work to be completed within due time agreed upon

and shall fail to proceed to the satisfaction of the employer after three clean days

notice requiring the contractor so to do shall have been given to the contractor as

hereinafter mentioned, or shall abandon the contract, then and in any of said

cases, the bank may notwithstanding previous waiver determined the contract

by a notice in writing to the effect as hereinafter mentioned, but without

thereby effecting the powers of the employments of the obligations and

liabilities of the contractor the whole of which shall continue in force as fully

as if the contract, had not been so determined and as if the work subsequently

executed had been executed by or on behalf of the contractor ( without thereby

creating any trust in favour of the contractor ) further the employer or his agent,

or servants, may enter upon and take possession of the work and all plants tools

scaffolding, sheds, machinery, steam and other power utensils and materials

lying upon premises or the adjoining lands or roads and sell the same as his own

property or may employee the same by means of his own servants and

workmen in carrying on and completing the works or by employing any other

contractors or other person or person to complete the works, and the contractors

or other person or person to complete the works, and the contractor shall not in

any interrupt to do any act matter or thing to prevent or hinder such other

contractors or other persons or person employed from completing and finishing

or using the materials and plants for the works when the works shall be

completed, or as soon thereafter as conveniently may be, the employer shall give

notice in writing to the contractor to remove this surplus materials and plants and

39

should the contractor fail to do so within a period of 14 days after receipt by

him the employer may sell the same by public auction and shall give credit to

the contractor for the amount so realized . Any expenses or losses incurred by

the employer in getting the works carried out by other contractors shall be

adjusted against the amount payable to the contractor by way of selling out by

the contractor or priror to engaging others or against the Security Deposit.

44 ARBITRATION

All disputes or differences of any kind whatsoever which shall at any time arise

between the parties hereto touching or concerning the works or the execution or

maintenance thereof of this contract or the rights touching or concerning the

works or the execution or maintenance thereof on this contract or the rights

touching or concerning the works or the execution of maintenance thereof this

contract of the construction remaining operation or effect there of to the rights or

liabilities of the parties or arising out of or in relation thereto whether during or

after determination foreclosure or breach of the contract. The decision of the

General Manager will be binding upon both the parties.

Signature Signature of the Contractor

Asstt. General Manager – IV

SBBJ

CHANDIGARH

40

SAFETY CODE

SCAFFOLDS

(i) Suitable scaffolds shall be provided for workmen for all works that cannot safely

be done from the ground, or from solid construction except in the case of short

duration work which can be done safely from ladders. When a ladder is used, it

shall be of rigid construction made either of good quality wood or steel. The

steps shall have a minimum width of 450mm and a maximum rise of 300mm.

Suitable hand and holds of good quality wood or steel shall be provided and the

ladder shall be given an inclination not steeper than 1/4 to 1 (1/4 horizontal and 1

vertical).

(ii) Scaffolding or staging more than 4m above the ground floor, swung or suspended

form an overhead support or erected with stationery support shall have a guard

rail properly bolted, braced or otherwise secured, at least 1m above the floor or

platform of such scaffolding or staging and extending along the entire length of

the outside and ends thereof with only such opening as may be necessary for the

delivery of materials. Such scaffolding or staging shall be so fastened as to

prevent it from swaying from the building or structure.

(iii) Working platform , gangways and stairways shall be constructed that they do not

sag unduly or un equivally and if the height of the platform, gangway or stairway

is more than 4m above ground level or floor level, they shall be closely broaded

and shall have adequate width and be suitably fenced as described in (ii) above.

(iv) Every opening in the floor of a building or in a working platform shall be

provided with suitable means to prevent the falls of persons or materials by

providing suitable fencing or railing whose minimum height be 1m.

Wherever there are open excavations is ground, they shall be fenced off by

suitable railing and danger signals installed at night so as to prevent persons

slipping into the excavation.

41

(v) Safe means of access shall be provided to all working places. Every ladder shall

be securely fixed. No portable single ladder shall be over 9m in length while the

width between side rails in rung ladder shall in no case, be less than 290 mm for

ladder upto and including 3m in length. For longer ladders this width shall be

increased at least 20mm for each additional meter of length.

(vi) A sketch of the ladders and scaffolds proposed to be used shall be prepared and

approved of the Engineer obtained prior to construction.

(vii) All personnel of the contractor working within the plat site shall be provided with

safety helmets. All welders shall wear welding goggles while doing welding work

and metal workers shall be provided with safety glove's . Personal employed on

metal cutting and grinding shall wear safety glasses.

(viii) Adequate precautions shall be taken to percent danger from electrical

equipment. No material on any of the sites of work shall be so stacked or placed

as to cause danger or inconvenience to any person of the public.

EXCAVATION & TRENCHING

(ix) All trenches, 1.25m or more in depth shall at all times be supplied with at least

one ladder for each 30m in length or fractions thereof. The ladder shall be

extended from bottom of the trenches to at least 1m above the surface of the

ground. Sides or trenches which are 1.5 m or more in depth shall be stepped

back to give suitable slope or securely held by timer bracing so as to avoid the

danger of sides collapsing. The excavated materials shall not be placed within

1.5m of the edges of the trench or half of the depth of the trench whichever is

more. Cutting shall be done from top to bottom. Under no circumstances

undermining or undercutting shall be done.

(x) The contractor shall take all measures on the site of the work to protect the public

from accidents and shall be bound to bear the expenses of defence of every suit,

42

action or other proceedings at law that may be brought by any persons for injury

sustained owing to neglect of the above precautions and to pay any such persons

or which may with the consent of the contractor, be paid to compromise any

claim by any such person.

(xi) Before any demolition work in commenced and also during the process of the

work.

(a) All roads open areas adjacent to the work site shall either be closed or suitable

protected.

(b) No electric cable or apparatus which is liable to be a source of danger over a cable

or apparatus used by the operator shall remain electrically charges.

© All practical steps shall be taken to prevent danger to persons employd from the

risk of fire or explosion or flooding. No floor, roof or other part of the building

shall be so over-load with debris or materials as to render it unsafe.

PERSONAL SAFETY EQUIPMENTS

(xii) All necessary personal safety equipments considered adequate by the

Engineers should be kept available for the use of the person employed on the site

and maintained in a condition suitable for immediate use, and the contractor

should take adequate steps to ensure proper use of equipment by those

concerned.

(a) Workers employed on mixing asphaltic materials, cement and lime mortars shall

be provided with protective footwear and protective goggles.

(b) Those engaged in white washing and mixing or stacking of cement bags or any

material which in injurious to the eyes shall be provided with protective

goggles.

43

© When engaged in welding work shall be provided with welder's protective

eyesight lids.

(d) Stone breakers shall be provided with protective goggles and protective

clothing and seated at sufficiently safe intervals.

(e) When workers are employed in sewers and manholes which are in use, the

contractor shall ensure that the manhole covers are opened and are ventilated

at least for an hour before the workers are allowed to get into manholes and the

manholes so opened shall be cordoned off with suitable railing and provided with

warming signals or boards or prevent accident to the public.

(f) The contractor shall not employ men below the age of 18 years and women on

the work of painting with products containing lead in any form. Whenever men

above the age of 18 are employed on the work of lead painting the following

precautions should be taken.

(i) No paint containing lead or lead products shall be used except in the form of

paste or ready made paints.

(ii) Suitable face marks should be supplied for use by the workers when paint is

applied in the form of spray or a surface having lead paint dry rubbed and

scrapped.

(iii) Overalls shall be supplied by the contractor to the workmen and adequate

facilities shall be provided to enable the working painters to wash during the

cessation of work.

(xiii) When the work is done near any public place where there is risk of drawings all

necessary equipments should be provided and kept ready for use and necessary

steps taken for prompt rescue of any person in danger and adequate provision

should be made for prompt first aid treatment of all injuries likely to be

sustained during the course of the work.

44

DETAILED SPECIFICATIONS

For detailed specifications of items please refer specifications & explanatory

notes of Central Public Works Department .

MODE OF MEASUREMENT

Please refer hand book of method of measurement of building works published

by Bureau of Indian standards.

45

LIST OF APPROVED MAKE AND MANUFACTURERS

MATERIALS : BRAND NAME

Ordinary Portland Cement 43 Grade : Gujrat Cement Co., J.K. Cement,

Associated Cement Companies

White cement : Grasim Industries ltd , J.K. Cement

Commercial Board

:

Alpro , GreenPly, Archidply,Amulya

Wooden Moulding - ½, 1, 2 Inches

:

Ghana, Nagpur

Wood For Frames & Shutters

:

Ghana, Nagpur

Factory made flush doors

ArchidPly , Greenply Industries ,Alpro

Veener

:

Timex, ArchidPly or equivalent

Laminates

:

Formica,Green,Archidlam

Partitions Frame Soft Wood

:

Jammu Kail Wood

Floor Springs

:

Everite , Opel

Paint

:

ICI, Asian, Burger, Nurolac

Texture Paint NIKO Building , Acro, Spectrum

Cornice & Punning

:

Plaster of Paris (Adhar Shree &

J.K.Luxmi)

Glass & Mirror

:

Modi Float Glass, Saint Gobain, Ashai

Hardware / Fittings

(Earl Biharie hinges, Locks, Channels,

Handles etc.)

:

Everite or Equivalent

ACP (Aluminium Composite Panel ) : Lennox , Indobond, Alstrong, Al-

Stone

Vitrified Tiles

: Naveen, Bell , Nitco, Johnson,

Marbonite,

Ceramic Tile , Glazed Tiles : Kajaria , Nitco , H & R Jonhson

Blinds

:

Vista, Trac

46

LIST OF APPROVED MAKE AND MANUFACTURERS FOR THE ELECTRICAL

WORK

The Electrical equipment and the various items to be used in this project should be of the

following makes only. Any deviation from these approved makes must have the prior sanction

of the Client/ Consultant.

NO ITEM MANUFACTURER

1 DISTRIBUTION BOX(Double

Door)

legrand/M.K./ L&T/GE.

2 MCB's LEGRAND/ /M.K./L&T/Havels

3 FRLS PVC INSULATED WIRES

(METRIC SIZE ,1100V & 400 V

Grade)

RRKABLE/ /FINOLEX/ HAVELLS./SKYTONE/

NATIONAL./ Batra Henlay

4

TELEPHONE CABLES

SKYTONE/ FINLOEX/ DELTON/ NATIONAL/

BatraHenlay.

5 ERW MS CONDUITS(ISI marked

to Medium Grade)

BEC /AKG

6 ELCB's LEGRAND/ /M.K./ L&T

7 TELEPHONE CONNECTORS M/s KRONE

8 SWITCHES & SOCKETS( WITH

COLUR SHADES)

CRABTREE(Platinum range)/ VINAY / ELLE/LEGRAND

UPS SOCKETS ARE IN GREY SHADE AND OTHERS

IN WHITE SHADE.

9 DATA & VOICE OUTLETS CRABTREE(Platinum range)/ LEGRAND/TOYOMA

10 VOICE CABLES SKYTONE/ /BATRA HENLAY/NATIONAL/ FINOLEX

11 MCCB L&T/LEGRAND

12 MUSIC SYSTEM PHILIPS/AHUJA/MOTWANE

13 RACEWAYS & JUNCTION

BOXES.

FABRICATED, POWDER COATED

14 FIRE ALARM DETECTORS AND

SYSTEMS

APPOLO/PHILIPSOR/GODREJ 0R ANY OTHER

UL/FEM listed.

15 FIXTURES AND LAMPS. Philips/Krompton/Havels

16 CAT-6 (ENHANCED) CABLES LUCENT/ FINOLEX/ OR CONFORMING TO UL AND

FEM STANDARDS.

47

No. Particular Qty Units Rates Amount

Words &fig.)

1 DISMANTALLING

Dismantling Brick wall/partitions on day to day basis &

removing malba from site as per instructions of Bank /

architect. 1.00 l.s

2 FALSE CEILING

(Measurement shall be taken of the plan area.) Suspending

system and frame work shall match layout of A.C. Ducts /

grills, electrical / fire protection wiring / fixtures, Return Air

grills etc. Rate to include provision of extra frame work

needed due to layout refered above and fixtures etc. Rates to

include scaffolding.

a) Providing and fixing GYPSUM ceiling in STRAIGHT OR

CURVED shape with INDIA GYPSUM ceiling sections with

MAINS GI frame at 1200 c/c with cross members to be fixed

at 450 c/c. The mains to be fixed on wall with PERIMETER

members. The ceiling sections to behanged from ceiling with

hangers at every 1200 c/c 12.5mm GYPSUM board to be

screw fixed on the frame. The tapered edges of the board to

be filled with jointing compound and covered with paper tape.

The ceiling is finished with TOP coat as approved by INDIA

GYPSUM and two coats of plastic emulsion paint over one

coat of primer. The item includes making all necessary steps,

coves, openings etc. complete. 10.00 Sq.mt

3 PARTITIONS / PANELLING

Measurement of height shall be taken from finished floor

level up to the level of false ceiling, in case of varying heights

on either side of partition, average height shall considered.

The rate to include Provision of extra frame work as

necessary for skirting and making cutouts for electrical

switch plates, switch boxes, light fittings light etc. making

provision for laying conduit; as per drawings & directions of

site Eng. / Architect. All wood framework to be applied with 2

coats of fire retardant paint and 1 coat of wood preservative

with anti termite properties..

a Providing & fixing partition from floor level up to the level of

false ceiling with same specification as above in 5a) but with

a 6.0mm thk. ETCHED float glass as per design to be fixed

in teakwood beading of size 40x 20 over a teak wood frame

of size 100x25 screwed to the frame work; as per design and

details.Complete with melamine polish on teak surfaces to

the satisfaction of Architect/ Employer. 20.00 Sq.mt

b Providing and fixing of old partition after removing and

necessary repair/polish as per requirement. 10.00 Sq.mt

G-Schedule for the proposed furnishing work of Gurgaon Branch premises

No. Particular Qty Units Rates Amount

Words &fig.)

c Providing and fixing Low height Partition with same

specifications as item 5a) including all bends but height of

partition to be 1200 with 38x90mm teakwood moulding on

top and side edges of partition. Item includes malamine

polish on teakwood surfaces complete 4.00 Sq.mt

d Providing and fixing wall paneling upto 900 height with

50x25mm Kail wood frame at 2'-0" c/c in both directions,

finished with 1mm thick laminate. The paneling to have

50x35mm Cedar wood Moulding on top edge on the paneling

finished in spirit polish complete. 10.00 Sq.mt

3 FURNITURE

All Tables/ counters/work stations to have 19mm comm.

block board top and sides to be with 19 mm comm. board

and 1.0 mm laminate finish on exposed surfaces with

polish/paint inside, Footrest 75x50mm 2nd class teakwood

member to be fixed for each table, the rate to include all

hardware. The inside of the table to be painted with synthetic

enamel in 2 or more coats after preparing base. The item

also includes providing & fixing a Key board tray to the

satisfaction of Architect / Employer.

a Providing and placing in position Officer's tables with 19 mm

Comm. Block board top and sides and 1.0 mm thick

laminate finish, The Edges to have Teakwood/Steam beach

wood moulding as per design. The front Modesty of the table

to have 1.0 mm laminated sheet over 19m comm. board.as

per design. The inside of tables and side tables to be finished

in Synthetic Enamel Paint in two or more coats after

preparing base complete.

a-i Table size 1200x750x 750 high (without drawer unit) 1.00 Nos.

b Single Window /cash cabin Tables with same specifications

as Main table BUT the front shall have 900 height,18mm Jet

Black Granite/12 mm thick glass Top with stainless steel

spacers . The front of the stone to have round moulding

38mm thick made by joining two stones. Rest all edges to be

polished. The stone to have opening for wire managers etc.

complete. The drawer units shall be made of mild steel with

divisions in drawers for currency as per Bank's

specifications. Rest of specifications to be as MAIN tables. 3.00 R.Mtr

No. Particular Qty Units Rates Amount

Words &fig.)

c Providing and fixing 600 wide Continuous table with 19mm

commercial blockboard top with 1.0 mm thk. Laminate finish.

The table to have intermediate supports of 19mm comm

block board only. The tables also to have one foot rest made

from 100x40 Teakwood member. Item inlcudes providing &

fixing 1 KEY BOARD TRAY per sccupant. The inside of

tables to be painted with synthetic enamel in 2 or more coats

ater preparing the base. The table also includes making

holes for wire managers etc complete. 3.00 R.mtr

d Providing and fixing May I help YOU counter with 19mm

com. Board and 1.0 mm laminate in two or more shades.

The Customer top, which is at 230 higher than working top,

to be finished in 18mm Polished Granite/ 12mm curved

glass fixed with 230 mm S.S studs as per design. granite

edge to have 36mm moulding, and 12 mm tougnened glass

fixed in front modesty with SS clamps as per design in front

with Coloured Logo, Rest of specifications to be same as

main counter. Size 530mm wide 2400 mm long and 1066

mm high. 1.00 Nos

e Providing & placing in position Writting Table around

central column with 19mm comm block board and 18mm

prepolished granite top. table to have waste box 600mm wide

with shutters, the table top to have open shelves to take

different BANK SLIPS made from 12mm comm ply finisjed in

spirit polish. made from joining TWO stones.Complete with

all polish/paint to the satisfaction of Architect/Employer. 1.00 Nos.

4 STORAGE CUPBOARDS

a P/f box cupboards 1'-4" deep as shown in details with all

sides, shelves to be 19mm thk. comm. block board with

6mm comm. ply to be fixed at the back. The shutters to be

19mm comm. block board, with 1.0 mm laminate on all

exposed surfaces. All edges to have teakwood beading

20x12mm as per details, all shutters to have teakwood

edging, complete including handles, magnetic catchers,

PIANO hinges, locks, etc. The item includes polishing the

teakwood surfaces to be spirit polished/ Duco painted and

interior to be Painted in 2 or more coats of sythetic enamel

complete to the satisfaction of Architect / Employer. Only

front elevation to be considered for area calculation. 11.00 Sq.mt

5 MISCELLANEOUS

No. Particular Qty Units Rates Amount

Words &fig.)

a Providing & fixing Panelled door with 75x50 teak wood

Frame (chaukhat). The door shutter to be made from 150x38

teakwood stiles, top with bottom rail of 200x40 teakwood

8mm. ETCHED glass to be fixed with teak beading

40x12mm. The door is to be complete with Cyndrical door

Lock (Godrej, Golden, Make), 200mm S.S./Brass Handles,

brass Stopper, Tower bolts, 125 Brass hinges etc. all

Teakwood surfaces to be malamine polished complete to the

satisfaction of Architect/ Employer

Size of Opening : 900 x 2100 1.00 Nos

b Providing and fixing Flush doors 35mm thick with 1.0 mm

laminates on both sides. The item includes Teakwood

chaukhat made from 75x50 teakwood. The door to have

12mm teak wood lipping on edges. The door is to be

complete with Cylindrical door Lock (Golden or Godrej

Make), 200mm SS/Brass handles, brass Stopper, Tower

bolts, 119mm Brass /SS hinges etc. all Teakwood surfaces

to be malamine polished complete to the satisfaction of

Architect/Employer size 900x2100 2.00 Nos

d Providing and fixing door closers of approved make. 6.00 Nos

e Providing & fixing Glazed door for Entrance and for

Manager's Cabin with 12 mm Etched Toughened glass

frameless with imported stainless steel hinges. The Door to

have double action Floor spring,lock, Handle (in SS finish

atleast 450mm Long).,complete. 10.0 Sq.mt

7 PAINTING

a Providing and applying birla white punning on wall to give a

clean smooth and plumb surface. 60.00 Sq.mt

b Providing and painting the walls, ceiling with plastic emulsion

paint after preparing the base by removing existing paint/

finish and applying 2-3 coats of putty for leveled plain,

smooth surface and applying 2 or more coats with rollers of

plastic emulsion complete. 200.00 Sq.mt

c Providing and painting synthetic enamel paint after removing

old paint and preparing the base for the same and applying 2

or more coats of paint complete. 30.00 Sq.mt

8 Providing and fixing VITRIFIED tiles (Marbonite, Jhonson,

Asian) 600x600 tiles with 50x50 granite dabbi inserted in

between for flooring patterns in straight or curved shape on

the existing flooring. The tiles to be fixed with fixing

compound (Unitile, Fevimate) as per details complete. The

measurement to be on sq. ft basis of the plan area of the

flooring, skirting and NO extra payment made for design

work. 40.00 SQM

No. Particular Qty Units Rates Amount

Words &fig.)

9 ACP cladding in the front facia 15.00 SQM

10 COLLAPSIBLE GATE : Providing and fixing

collapsible gate made of best quality SRI Mills

gate channel with 18 mm. x 5 mm. cross

members with top fixed in tee and bottom runners

made of 40 mm. x 6 mm. flats and 40 mm. x 12

mm. x 25 mm. flats finished with 1 coat of Black

Japan and enamel paint finish.

8 Sq.m

11 Supplying, fitting and fixing steel rolling shutters

profile type with 1.249mm of approved type(Indian

make) steel lath section 7.5cm wide fitted with

Indian make heavy type flat steel springs, fixed

inside C.I housing fitted with two sets aligning

Indian ball bearings on each housing of revolving

on heavy type solid drawn seamless Indian steel

tubes complete with locking arrangement (both to

the inside and the out side) specially built up side

guide channels as per ISI specification including

providing a hood for the steel rolling shutter in the

room, painting two coats of approved Aluminium

paint over a coat of red lead primer complete.

8 Sq.m

TOTAL

No. Particular

Qty Units rate Amount

words &fig

1 ELECTRICAL WIRING

Providing & fixing POINT WIRING for Ceiling and wall lights.

The item includes Circuit wiring from DB to the switch board

with 2x2.5 Sq. MM PVC insulated copper conductor with 1.5

sq. MM PVC insulated copper conductor for earthing in

appropriate size of PVC conduits ISI mark, point wiring to be

laid with 2x1.5 Sq. MM PVC insulated copper conductor with

all necessary accessories, such as saddles etc. on surface or

embedded in wall, chasing the walls and making the surface

neat afterwards The item includes switch 6 AMP MK/ CRAB

TREE/ ABB with (Double module)all base plates & cover

plates, M.S. box of same make etc.3-plate ceiling rose to be

provided for Exhaust fans complete. (EACH Circuit to take

NOT MORE than 5-6 points)

a Providing and fixing point wiring with same specifications as

MAIN point wiring above but one point to be controlled by one

switch. 10.00 Nos.

b Providing and fixing point wiring with same specifications as

MAIN point wiring above but 2 points to be controlled by one

switch. 4.00 Nos

d Providing and fixing point wiring with same specification as

above but for FAN points with ONE 5pin 6 AMP socket at

location of fan is to be provided. 5.00 Nos.

e Providing & fixing wiring for 16 Amp Power points with same

specifications as above but with 2x2.5 Sq.MM PVC insulated

copper conductor instead of 2x1.5 sq. mm. conductor.

Including 6 pin (6/16 Amps) Socket and 16 Amp Switch. One

Point per circuit. 4.00 Nos

g Providing & laying 6 Amp light plug point. With 2x2.5 Sq.MM

PVC covered copper conductor with 1x 1.5 Sq. MM PVC

covered copper conductor for Earthing. The item Includes 1

NO 5 pin 6 AMP socket and 1 no 6AMP switch (double

module) etc. complete. 5.00 Nos

h Providing & laying 6 Amp LOOPED plug point. incl. socket and

switch (double module) etc. complete. with specifications

same as (h) above. 4.00 Nos

G-Shedule proposed elect. Work for Gurgaon Branch Premises

i 6 Amps Plug Points with same specs as above but at

switchboard 4.00 Nos

j Providing an fixing Computer points with 2x2.5 Sq.MM PVC

copper conductor & 1x1.5 sq. mm. PVC insulated copper

conductor for earthing including 4 Nos 5pin 6 Amp sockets, 1

Nos 16 amp switch & one indicator lamp, complete with all

necessary accessories. (all 4 sockets, switch and indicator to

be considered as ONE POINT) For points on counter the

switch and indicator to be located above the counter while

sockets to be below the counter Maximum 2 points per circuit

but each point to be counted for payments.(each circuit to be

controlled by one MCB). 8.00 Nos

k Providing and fixing Computer points with same specifications

as above (l) BUT points to be LOOPED with main point . 2.00 Nos

l Providing and fixing BELL POINTS on wall / partition with

2x1.0 Sq.MM copper conductor with call bell switch (Push

Type) including ANCHOR call bell TRESSA Multi Tune Bell

complete. 1.00 Nos

m Providing and laying telephone wiring with 2 pair / 4 core

telephone cable in 3/4" PVC conduit including all necessary

accessories with telephone sockets RJ- 11, boxes base plates

etc. complete. 10.00 Nos.

2 DISTRIBUTION BOARDS

All MCB to be "C" series

a Providing & fixing same as above, 6 way TPN double door

DB for POWER POINTS with 63 Amps TPN MCB controlling

7 Nos. 16A, SPMCBs.& 5 no 32 Amp SPMCBs for A.C

Complete. 1.00 Nos.

b Supply &fixing INDUSTRIAL SOCKET and plug with 40 amp.

SPMCB (C series) including enclosures for ups input 2 no

c providing & fixing 40 AMP DP MCB including its enclosures for

ups output. 2 No

d Providing and fixing 12 way SPDB double door type For UPS

points with 1x32 Amps 300 mA DP RCBOs controlling 10

NO.10 A. SPMCB 2.00 Nos.

3 CABLES

a Providing and laying 4x6.0 Sq.MM & 2 x 2.5 sq mm PVC

coated copper conductors in MS conduits from Mains Panel to

Various DBs. Including all necessary terminals etc. complete. 30.00 mtrs.

b Providing & fixing 4x10 sq. mm.Copper Conductor in 2 mm

thick PVC conduit for UPS supply and A.C. D.B. including 4

Sq. mm Copper conductor for earthing From panel to UPS &

A.C D.B.including all accessories such as Saddles etc.

complete. 40.00 mtrs.

c Providing and fixing 2x 6 Sq mm.Copper conductor for UPS

supply From UPS. To UPS DBs The item includes all

necessary accessories such as Saddles cable glands etc.

complete. 20.00 mtrs.

4 Cable Terminations

Supplying, connecting the end terminations with copper cable

lugs, Single Compression Brass Cable Glands, Tapping,

Crimping etc. complete.

a 3.5 core 70 Sqmm All Ar. 2.00 set

b 4x6 Sq.MM Cu Conductor 8.00 set

c 4x10 Sq.mm Cu Conductor 2.00 set

d 2x6 Sq.mm Cu Conductor 4.00 set

5 ELECTRICAL FIXTURES

Item includes Providing, assembling, fixing, testing &

commissioning Following Fixtures including all

accessories & extension chords as maybe necessary

complete. All CFL / Flurescent fixtures (except down

lighters) to be hung from the RCC ceiling by 20 KG grade

adjustable GI chain & in NON False ceiling area they are

to be hung by appropriate Down Rods.

a Providing and Fixing Recessed mounted direct indirect high

performance decorative luminaire of Philips FBS 450/236 D6

HPF (FA) Orange with 2xPL L 36W CFL tubes 3.00 Nos

b Providing and Fixing Spot lights for 13 watts CFL fixtures

WIPRO WCP 42213 including the 2x 13 watts CFL (TC-D)

OR PHILIPS make of eqivalent price. 6.00 Nos

C Providing and Fixing Decorative Wall lamps (Decon / Ankur or

Equivalent) including Fixture and lamp complete 2.00 Nos

TOTAL ELECTRICAL

Bid Document : Document Not available

Tech. Document : Document Not available

Sector : Banking, Finance & Insurance

State : Rajasthan

For further Information Contact:

Name : Web Master

E-Mail : webmaster@sbbj.co.in

Phone Office : 5101673

 

 

 
Copyright ©2007 HamaraShehar.com All Rights Reserved.
Domain Registration, Website Design, Website Hosting by HamaraShehar.com