All Tenders & Contracts Tenders & Contracts Notices Bangalore Jobs Delhi Classifieds
Tenders & Contracts by City Delhi Jobs Bangalore Classifieds
Open Tenders & Contracts Hyderabad Jobs Mumbai Classifieds
Hyderabad Yellow Pages 7 Wonders of Hyd Our Network Contact Us Mumbai Jobs Hyderabad Classifieds

Tender/Contract Notification

AIRCONDITIONING WORK OF THE BANK BRANCH FOR SBBJ AT REWARI,HARYANA

Company

State Bank of Bikaner and Jaipur

Tender Date

16/05/2008

Published Date

Submission Date

5/26/2008 3:00:00 PM

Open Date

5/26/2008 3:30:00 PM

Work Name

AIRCONDITIONING WORK OF THE BANK BRANCH FOR SBBJ AT REWARI,HARYANA

Work Location

REWARI(HARYANA)

Address

ITSD, SBBJ Head Office, Tilak Marg, C-Scheme, Jaipur - 302005

Description

AIRCONDITIONING WORK OF THE BANK BRANCH FOR SBBJ AT REWARI,HARYANA

1

AIRCONDITIONING WORK OF THE BANK BRANCH

FOR SBBJ AT REWARI,HARYANA

TENDER DOCUMENTS

STATE BANK OF BIKANER & JAIPUR

ZONAL OFFICE, AHINSA BHAWAN

SHANKAR ROAD, NEW DELHI

2

PROPOSED AIRCONDITIONING WORK OF THE SBBJ BANK

BRANCH AT REWARI,HARYANA

INDEX

S.No. PARTICULARS PAGE NO. NO. OF

PAGES

1. Notice of Invitation of Tender 1 1

2. General Rules & Instructions 2 – 13 12

3. 'G' Schedule and annexure 1

TOTAL 14

3

LVsV cSsad vkWQ chdkusj ,.M t;iqj

{ks= izFke] fnYyh vapy

jsokM+h] ubZ fnYyh ‘kk[kk ifjlj esa izLrkfor lkSan;hZdj.k dk;Z

egksn;]

fufonk,a vkea=.k djus gsrq lwpuk

gekjs fu;a=.kk/khu mDr ‘kk[kk ifjlj ds okrkuqdwyu dk;Z gsrq dSfj;j] fgrkph] oksYVkl ,oa Cyw

LVkj czkaM ds ,;jdaMh’kuj fuekZrk daifu;k vFkok AUTHORISED Mhyjksa ls fufonk,a vkeaf=r

dh tkrh gS A ( Dealers are required to submit the recent proof of its authorization letter from the

concerned manufacturer at the time of submission of tender)

fufonk nLrkost cSad dh osc lkbZV (http://www.sbbj.com) vFkok ljdkj dh osclkbZV

(http://www.tendergovt.in) ls Mkmu yksM fd, tk ldrs gSa vFkok v/kksgLrk{kjdrkZ ds dk;kZy;

ls Hkh izkIr fd, tk ldrs gSa A fufonk izLrqr djrs le; fufonk nLrkost ds ewY; :

500@& ¼: ikap lkS ek=½ dk ukWu fjQaMscy ekax Mªk¶V] tks fd v/kks gLrk{kj drkZ ds Ik{k esa

ns; gks ,oa fnYyh fLFkr cSad ’kk[kk ij ns; gks] layXu dj fHktok,a A

1- dk;Z dh vuqekfur ykxr % : 4.40 yk[k

2- /kjksgj jkf’k : 4400@& ¼v{kjs :Ik;k pkj gtkj pkj lkS ek=½ dk

js[kkafdr Mªk¶V tks fd LVsV cSad vkWQ chdkusj ,.M t;iqj

i{k esa ns; gks A

3- LFky tgka fufonk,a izLrqr dh mi egkizca/kd lfpoky;] ,lchchts] vapy dk;kZy;]

tkuh gS ‘kadj jksM+] U;q jkftUnj uxj] ubZ fnYyh&110060 esa

j[ks VsaMj ckWDl esa Mkyh tkuh gS A

4- fufonk,a izLrqr djus dh vafre

frfFk ,oa le; fnukad 26-05-2008 dks 3-00 cts

5- fufonk,a [kksyus dh frfFk

,oa le; fnukad 26-05-2008 dks 3-30 cts

lgk;d egkizca/kd

4

SBBJ , REGION- IV , Chandigarh)

M/s---------------

Dear sir,

PROPOSED AIRCONDITIONING WORK OF BANK

BRACH AT SBBJ REWARI,HARYANA

NOTICE FOR INVITATION OF TENDER

Sealed tenders on item rate basis are invited from the MANUFACTURERS

(VOLTAS/CARRIER/HITACHI/BLUE-STAR) AND ITS AUTHORISED DEALERS (

Dealers are required to submit the recent proof of its authorization letter from the

concerned manufacturer at the time of submission of tender) having sound technical and

financial capacity for the aforesaid work. Tender documents may be down loaded from

the Bank's web - site (http://www. sbbjbank. com) as well as Govt’s web-site (

http://www.tendergovt.in) can also be obtained from the office of the undersigned.. While

submitting tender, a crossed Demand Draft for RS. 500/- ( Five hundred only) ( Non -

refundable) is to be enclosed against cost of the tender, payable at New Delhi and drawn

in favour of the undersigned

Estimated cost of the work RS. 4.40 Lakh

Earnest Money; RS. 4400/- (FOUR Thousand Four

Hundred only) by crossed Demand Draft

payable at Chandigarh and drawn in

favour of State Bank of Bikaner & Jaipur.

Place where tenders to be submitted IN THE TENDER BOX KEPT IN THE

DGM SECTT.,(III FLOOR), SBBJ,

ZONAL OFFICE, SHANKAR ROAD,

NEW RAJINDER NAGAR, NEW

DELHI-110060

Time and date of submission of Tender ; 3.00 PM. on 26.05.2008

Time and date of opening of tenders : 3.30 PM on 26.05.2008

ASSTT. GENERAL MANAGER –IV

5

GENERAL RULES AND INSTRUCTIONS FOR THE GUIDANCE OF

THE TENDERS

PROPOSED AIRCONDITIONING WORK OF THE BANK

BRANCH AT SBBJ REWARI,HARYANA

1. Tenders are hereby invited on behalf of State Bank of Bikaner and Jaipur

for the PROPOSED AIR-CONDITIONING WORK OF THE BANK

BRANCH AT SBBJ REWARI,HARYANA

2. Contract documents consisting of agreement and the set of conditions of contract

to be complied with by the person whose tenders may be accepted, Schedule of

quantities of various classes of work to be done and drawings which will also be

found in the form of tenders, Tender documents may be down loaded from the

Bank's web - site (http://www. sbbj bank. com) as well as Govt’s web-site (

http://www.tendergovt.in) Or can also be obtained from the office of the

undersigned. While submitting tender, a crossed Demand Draft for RS. 500/-

( Five hundred only) ( Non - refundable) is to be enclosed against cost of the

tender, payable at Chandigarh and drawn in favour of the undersigned

during the office hours on working days. Therefore, contractors are advised to

visit the site before quoting the rates.

3. Tenders, which should always be placed in sealed cover, with the name of the

project written on the envelopes may be submitted /Dropped IN THE TENDER

BOX KEPT IN THE DGM SECTT., SBBJ, ZONAL OFFICE, SHANKAR

ROAD, NEW RAJINDER NAGAR, NEW DELHI-110060

4. The time allowed for carrying out of the work will be 30- days form the 10th day

after the date of written order to commence work.

5. The contractors should quote in figures as well as in words, the rate and amount

tendered by them. The amount for each item should be worked out and the

requisite totals given.

6. When a contractor signs a tender in an Indian language the percentage above or

6

below and the tendered amount and the total amount tendered should also be

written in the same language. In the case of illiterate contractors, the rates or the

amounts tendered should be attested by a witness.

7. Issue of tender form will be stopped one day before the date fixed for the opening

of tenders.

8. Earnest money amounting to Rs.4400/- ( Rupees FOUR thousand four hundred

only) in the form of Bank draft drawn in favour of the State Bank of Bikaner &

Jaipur must accompany with each tender and each tender is to be in a sealed

cover super -scribed " TENDER FOR PROPOSED AIR-CONDITIONING

WORK OF THE BANK BRANCH AT REWARI,HARYANA

9. The Contractor, whose tender is accepted, will be required to furnish by way of

security deposit for the due fulfillment of his contract, such sum as will amount to

10.00% of the estimated cost of work. The S.D. shall be collected as detailed in

the general conditions of the contract.

The EMD of the contractor, whose tender is accepted, shall be forfeited in full in

case he does not remit the Initial Security Deposit within the stipulated period or

start the work by the stipulated date mentioned in the award letter.

10. The acceptance of tender will rest with the State Bank of Bikaner & Jaipur which

does not bind itself to accept the lowest tender, and reserves to itself the

authority to reject any or all of the tenders received without the assignment of a

reason. All tenders in whom any of the prescribed, conditions are not fulfilled or

are incomplete in any respect are liable to be rejected.

The Bank reserves the right to accept the tender in full or in part and the tenderer

shall have no claim for revision of rates or other conditions, if his tender is

accepted in parts.

11. Canvassing in connection with tenders is strictly prohibited and the tenders

submitted by the contractors who resort to canvassing will be liable to rejection.

7

12. All rates shall be quoted on the proper form of the tender alone.

13. An item rate tender containing percentage below/ above will be summarily

rejected. However, where a tenderer voluntarily offers a rebate for payment

within a stipulated period, this may be considered.

14. On acceptance of the tender, the name of the accredited representatives(s) of

the contract or who would be responsible for taking instructions from the

Employer/ shall be communicated to the Employer.

15. Special care should be taken to write the rates in figures as well as in words and

the amounts in figures only, in such a way that interpolation is not possible. The

total amount should be written both in figures and in words. In case of figures,

the words "RS." should be written before the figures, e.g. Rs.2.15 'P' and in case

of word 'Rupees' should precede and the worked 'Paise' should be written at the

end, unless the rate is in whole rupees and followed by the words 'only' it should

invariably be up to two decimal places. While quoting the rate is in schedule of

quantities, the word ‘only’ it should invariable be up to two decimal places. While

quoting the rate is in schedule of quantities the word 'only' should be written

closely following the amount and it should not be written in the next line.

16. The bank does not bind itself to accept the lowest or any tender and reserves to

itself the right of accepting the whole or any part of the tender and the tenderer

shall be bound to perform the same at the rate quoted.

17. Sales Tax or any other tax on material or on finished works like work's contract

tax, Turn - over etc. in respect of this contract shall be payable by the contractor

and the Bank will not entertain any claim whatsoever in this respect . This

particular aspect should be mentioned in the tender notice.

18. The contractor shall give a list of his relatives working with the Bank along with

their designations and addresses.

8

19. No employee of the bank is allowed to work as a contractor for a period of two

years of his retirement from Bank service, without the previous permission of the

bank. This contract is liable to be cancelled if either the contractor or any of his

employees is found at any time to be such a person who has not obtained the

permission of the Bank as aforesaid before submission of the tender or

engagement in the contractor's service.

20. The tender for works shall remain open for acceptance for a period of 90 (ninety)

days from the date of opening of tenders. If any tenderer withdraws his tender

before the said period, then the bank shall be at liberty to forfeit Earnest Money

paid along with the tender.

21. The tender for the work shall not witness by a contractor or contractors who

himself/themselves have/have tendered or whom may and had/have tendered for

the same work. Failure to observe this condition would render tenders of the

contractors tendering as well as witnessing the tender liable to summary

rejection.

22. It will be obligatory on the party of the tenderer to tender and sign the tender

documents for all the component parts and that, after the work is awarded, he will

have to enter into an agreement for each component with the competent authority

in the bank.

23. The tender, apart from being a competent contractor must associate himself with

agencies of the appropriate class who are eligible to tender for (i) electrical (ii)

Air-conditioning work

Signature

AGM- IV, SBBJ, DELHI

9

A G R E E M E NT

1. THIS AGREEMENT made on the ---------------------------------------day of----------

-------------------2008 between --------------------------------------------------------------

----(herein referred to as "the Contractor" which expression shall, unless

repugnant to the context of meaning thereof be deemed to include its/his legal

heirs, executors, administrators and assigns of the one part and the state Bank of

Bikaner & Jaipur, a corporation constituted under the State Bank of India

( Subsidiary Banks) Act, 1959, and having its Head Office at Tilak Marg, CScheme,

Jaipur hereinafter referred to as "the Employer", which expression shall

unless repugnant to the context or meaning thereof be deemed to include its

successors and assigns of the other part.

2. WHEREAS the said employer requires execution of certain works to be carried

out for the “PROPOSED FURNISHING WORK OF THE BANK BRANCH

AT REWARI,HARYANA ( hereinafter the aforesaid words are collectively

referred to as "the works").

3. WHEREAS the said works are more particularly described in contract

documents consisting of agreement, the set of conditions of contract to be

complied with by the contractor, schedule of Quantities and drawings are

annexed herewith as part and partial of this agreement. The parties to the contract

agree to abide by the same.

4. WHEREAS , the employer has invited the tenders from the contractor already

pre-qualified by the Bank. The contractor has also given his tender which was

opened on ----------------------------- and it has been accepted by the Bank vide

letter No. -------------------------dated--------------------------.

Now it is hereby agreed as follows:

5. WHEREAS in consideration of the payments to be made to the contractors as

hereinafter provided, the contractor shall upon and subject to the set of said

conditions described in the contractual documents, execute and complete the works

10

as shown in the said plans, drawings, complete , specifications, schedule of

quantities of the various classes of works to be done and such further detailed

drawings plans and specification as may be furnished /provided to him by the said

employer and described in the said specifications and on the said price of schedule

of quantities.

6. The AGM -IV, Chandigarh of the employer shall exercise powers on behalf of the

said employer for the purpose of the Contract Agreement.

7. WHEREAS both the parties agree to sign the following annexure annexed to this

agreement in token of their acceptance :-

i) Agreement

ii) General conditions of contract

iii) Priced Bill of Quantities

8. The Bank shall pay the contractor such sum as shall become payable hereunder at the

times and in the manner specified in the said conditions mentioned in the General

Conditions of contract.

9. WHEREAS the contractor hereby undertakes and agrees to carry out and complete

the works within 30- days form the 10th day after the date of written orders to

commence the works are given to the contractor. The contractor agrees and has

deposited the sum of RS. -------------------------- by way of initial security deposit for

due fulfillment of this contract for the works. It is agreed that the security deposit

shall be deducted from each running bills as per clause - 11 and refunded to the

contractor as per clause - 13 of the General Conditions of the contract annexed

herewith.

10. WHEREAS it is agreed that the earnest money amounting to RS. -------- deposited by

the contractor in the form of demand draft along with the tender shall be forfeited in

full. In case contractor does not remit the initial security deposit within the stipulated

period of start the works by the stipulated date mentioned in the award letter

11

11. WHEREAS Shri ----------------------------------------------------- in the accredited

representative(s) of the contractor who would be responsible for taking

instructions from the employer in relation to the works. The contractor agrees to

pay sales tax, or any other tax on material or finished works like works contract

tax, turnover tax etc. including Income Tax in respect of this contract of the works

and the employer will not entertain any claim whatsoever in this report, nor the

employer will not entertain any claim whatsoever in this report, nor the employer

shall responsible to pay any tax as mentioned above. If due to non- payment of

any of the aforesaid tax or other taxes connected with the works, the contractor

suffers any loss or damages or delays in completing the works, the employer will

not be responsible for such loss or damages occurred to the contractor, and the

employer will be entitled to claim damages from the contractor for noncompletion

of the work within 45 days as stipulated in Para -9 above.

12. WHEREAS the contractor hereby declares the list of all the relative working with

the employer which is annexed herewith and marked C-1.

OR

13. An item rate tender containing percentage below/ above will be summarily

rejected. However, where a tenderer voluntarily offers a rebate for payment

within a stipulated period, this may be considered.

14. On acceptance of the tender, the name of the accredited representatives(s) of

the contract or who would be responsible for taking instructions from the

Employer/ shall be communicated to the Employer.

15. Special care should be taken to write the rates in figures as well as in words and

the amounts in figures only, in such a way that interpolation is not possible. The

total amount should be written both in figures and in words. In case of figures,

the words "RS." should be written before the figures, e.g. Rs.2.15 'P' and in case

of word 'Rupees' should precede and the worked 'Paise' should be written at the

12

end, unless the rate is in whole rupees and followed by the words 'only' it should

invariably be up to two decimal places. While quoting the rate is in schedule of

quantities, the word ‘only’ it should invariable be up to two decimal places. While

quoting the rate is in schedule of quantities the word 'only' should be written

closely following the amount and it should not be written in the next line.

16. The bank does not bind itself to accept the lowest or any tender and reserves to

itself the right of accepting the whole or any part of the tender and the tenderer

shall be bound to perform the same at the rate quoted.

17. Sales Tax or any other tax on material or on finished works like work's contract

tax, Turn - over etc. in respect of this contract shall be payable by the contractor

and the Bank will not entertain any claim whatsoever in this respect . This

particular aspect should be mentioned in the tender notice.

18. The contractor shall give a list of his relatives working with the Bank along with

their designations and addresses.

19. No employee of the bank is allowed to work as a contractor for a period of two

years of his retirement from Bank service, without the previous permission of the

bank. This contract is liable to be cancelled if either the contractor or any of his

employees is found at any time to be such a person who has not obtained the

permission of the Bank as aforesaid before submission of the tender or

engagement in the contractor's service.

20. The tender for works shall remain open for acceptance for a period of 90 (ninety)

days from the date of opening of tenders. If any tenderer withdraws his tender

before the said period, then the bank shall be at liberty to forfeit Earnest Money

paid along with the tender.

21. The tender for the work shall not witness by a contractor or contractors who

himself/themselves have/have tendered or whom may and had/have tendered for

the same work. Failure to observe this condition would render tenders of the

13

contractors tendering as well as witnessing the tender liable to summary

rejection.

22. It will be obligatory on the party of the tenderer to tender and sign the tender

documents for all the component parts and that, after the work is awarded, he will

have to enter into an agreement for each component with the competent authority

in the bank.

23. The tender, apart from being a competent contractor must associate himself with

agencies of the appropriate class who are eligible to tender for (i) electrical (ii)

FURNISHING work

Signature

AGM -IV, Chandigarh

Sl. No. Description of Item Qty. Unit Rate

(Rs.)

Amount

(Rs.)

1. Supply and installation of wall mounted Split

type air conditioners with all accessories like

ducting copper wire, stabilizer of capacity 4-

(make Carrier / Hitachi / Blue Star / Voltas)

The contractor should visit the site and locate

the placement of indoor & outdoor unit. The

cost should include cost of any structure and

attachment, pipes and cables required for

installation and installation charges.

2.00 Tons Split type air conditioners 6 Nos.

1.5 Tons Split type air conditioners 3 Nos.

2 Supply & Installation of Delay Timer for 1.5 1 No.

TOTAL Rs.

In

Sign and Seal of Contractor:

Date:

Place:

BILL OF QUANTITIES FOR INTERIOR DECORATION WORK INCLUDING FURNISHING,

ELECTRICAL AND AIRCONDITIONING WORK FOR REWARI,HARYANA BRANCH OF STATE BANK

Bid Document : Document Not available

Tech. Document : Document Not available

Sector : Banking, Finance & Insurance

State : Rajasthan

For further Information Contact:

Name : Web Master

E-Mail : webmaster@sbbj.co.in

Phone Office : 2227197

 

 

 
Copyright ©2007 HamaraShehar.com All Rights Reserved.
Domain Registration, Website Design, Website Hosting by HamaraShehar.com