Tender/Contract Notification

HQ, Stores, Double acting hydraulic shock absorber

Company

South Central Railway

Tender Date

07/03/2008

Published Date

Submission Date

4/29/2008 2:00:00 PM

Open Date

4/29/2008 2:30:00 PM

Work Name

HQ, Stores, Double acting hydraulic shock absorber

Work Location

Tirupati

Address

COS Office 6th Floor, Rail Nilayam, South Central Railway Secunderabad-500071 Andhra Pradesh

Description

Page 1 of 2

30.07.2146.T.190 Tender No:

156 Cost of Tender Form: Rs.

29-APR-08

Tend Open TIME : at 14.30 Hrs

NOS. Unit 30983472 PL No:

From: To: Controller Of Stores,

SOUTH CENTRAL RAILWAY,

VI Floor, Rail Nilayam,

Secunderabad-500 071.

S.339

Firm's Quotation No:

To be closed at:14.00 Hrs

EMD to be paid: Rs.

Quotation Date:

Due on:

Telegram:DHAMBHANDA Email- stores@scr.railnet.go Website:- www.scrailway.go Telefax:-040-27825

20,000

Counter Offer if any:-

Rate/Unit: Basic (Ex-works Rate in figures:

Basic Rate in Words:

Excise Duty, (with Surcharge & Cess if any)

Sales Tax (with Surcharge, Cess if any)

Freight Charges per Unit

Any other charges (please specify)

All in cost:

(To be filled by Tenderer)

1).Inspection by RITES.

NOTE:

1) Bulk purchase will be made from only those firms who have been approved

by RDSO. For details tenderers are requested to refer to Clause No. 3.1 of

the General Conditions of Tender.

2)Tenderers must return the "Tender Conditions" duly signed on each page.

3.Delivery Schedule:

Terms

TIRUPATI 108 108 WITHIN 2 TO 3

MONTHS.

1

NOS.

Place at which material

required

Quantity

Delivery Schedule

Required Offered

(to be filled by tendere

Sl.

No Unit

DOUBLE ACTING HYDRAULIC SHOCK ABSORBER FOR VERTICAL APPLICATION (900 Kgs CAPACITY)

to ICF Drg.No.ICF/SK-0-5-015, Item-2, Alt-n/4.

Description:

TOTAL QUANTITY : 108 NOS.

Page 2 of 2

S.339

We engage to supply S.C.Rly with the articles specified above upon the terms of the

Indian Railway Standard Conditions of Contract latest edition and upon the

corrections issued by S.C.Rly and also upon the Special Conditions of Contract.

The quotation will hold good for 120 days from the opening date. We accept all the

conditions as detailed in the "Tender Conditions" enclosed. The acceptance of the

Tender shall constitute a binding Contract between us and the President of India

acting through the Controller of Stores/S.C.Rly/Secunderabad-500 071.

Date:

Registration No. with S.C.Rly

SC Rly Vendor's Code No.(if any):

Registration No. with NSIC:-

Name:

Designation

Telephone No.

E-mail address

Office Seal

Signature of Tenderer

Over all value of the Tender:-

Read and Accepted

Signature of Tenderer

1

PLEASE NOTE

1. ALL COLUMNS SHOULD BE FILLED AND BLANK COLUMNS IF ANY SHOULD BE MARKED

AS – NIL

2. PLEASE READ THE INSTRUCTION TO TENDERERS, THE GENERAL AND SPECIAL

TENDER CONDITIONS, IRS CONDITIONS OF CONTRACT AND ADDITIONAL SPECIAL

CONDITIONS OF CONTRACT BEFORE FILLING UP THE TENDER FORM. PLEASE SIGN ON

EACH PAGE.

3. YOUR SIGNATURE ON THE TENDER FORM WILL BE INDICATIVE THAT YOU HAVE READ

AND ACCEPTED THE CONDITIONS AS ENCLOSED AND REFERRED.

4. THE TENDERERS MAY DOWNLOAD TENDER FORM FROM THE WEB SITE tenders.gov.in

AND SHOULD ENCLOSE COST OF THE TENDER FORM IN THE FORM OF DD/CASH

RECEIPTS IN FAVOUR OF CHIEF CASHIER, SOUTH CENTRAL RAILWAY, SECUNDERABAD.

The Tender document consists of the following:-

1. Tender Schedule and offer form

2. Instructions to the tenderers

3. General Tender Conditions

4. Special Tender Conditions (wherever applicable)

5. IRS Conditions of contract and

Additional Special Conditions of Contract.

6. Standard Proforma for the following:

(a) Earnest Money Bank Guarantee

(b) SD Bank Guarantee

(c ) Waranty Bank Guarantee.

7. EFT Mandate form.

INSTRUCTIONS TO THE TENDERERS

A. The Stores tenders published by the Controller Of Stores, South Central Railway are

published under Stores Tenders of South Central Internet site tenders.gov.in. This site also

permits downloading of the tender documents. The intending tenderers may visit this site and

download the tender document. While submitting the Tender documents, they should attach a

Demand Draft drawn in a nationalized bank in favor of “ Chief Cashier/ South Central Railway”,

payable at Secunderabad/ Cash Receipt , towards the cost of the tender document. If the tenderer

is eligible for free Tender Schedule, eligibility proof such as NSIC certificate should be enclosed

along with the Tender.

Payment through EFT: South Central Railway have started making payments through EFT

system for quick money transfer to the tenderers account.

i) Tenderer to give consent in a mandate form for receipt of payment through EFT (As

per the form given at the end of this document);

ii) Tenderer to provide the details of Bank Account in line with RBI guidelines for the

same. These details will include Bank Name, Branch Name & Address, Account

type, Bank Account No; and Bank & Branch code as appearing on MICR cheque

issued by bank;

iii) Tenderer to attach certificate from to their bank certifying the correctness of all

above mentioned information (as mentioned in para (ii) above);

iv) In case of non-payment through EFT or where EFT facility is not available payment

will be released through cheque.

--------------------------

1. Submission of Offers and Filling of Tender:

a. This tender should be duly filled in (in the enclosed Offer Form and Tender Schedule), duly

signed at relevant places and submitted in a sealed cover addressed to The Controller of

Stores, South Central Railway, Rail Nilayam, Secunderabad-500071 superscribed with the

following words:-

"Tender No………………due date of opening ……….. opening time ………….. ".

b. Tender form is not transferable and the tender should be submitted by the party in whose

favour the same has been issued or sold.

Read and Accepted

Signature of Tenderer

2

c. Tenderers, other than those submitting their offers in downloaded tender documents, should

quote in the prescribed form, duly filled in and signed, accompanied with the signed Tender

documents. Tenderers, falling in this category, may also quote in their own letter-head,

accompanied with signed tender documents. For such offers without signed tender

documents, the Railways reserve their right to ignore the same. However, these may be

considered on merits in deserving cases. In the event of placement of orders on such

Tenderers, they shall have to sign the Tender documents (sent by the Railways or

subsequently on payment) as token of acceptance of General and Special Conditions of

Tender and IRS Conditions of Contract, before placement of orders on them.

d. Offer form, tender schedule and firm’s letter head (if used) must be duly signed by the

tenderer in each page.

e. Even if not able to quote, Tenderers are requested to return this tender without fail, by the

due date duly signed with the words "NO QUOTATIONS" written across the face of it.

f. The Tenderers should avoid over writings and corrections. However if such corrections and

over writings become inescapable, these are to be properly and legibly corrected. Offers with

correction/ over writing should be properly attested by the Tenderer at every correction.

g. The rates quoted should be written both in words and figures. The unit of rates should be in

metric system and as per tendered specification/schedule. In case of difference between

words and figures, the rate in words will prevail. However this does not preclude the

Railways for availing themselves of the lower rates of the two.

h. Tenderers are requested to go through the IRS Conditions of Contract, Special Conditions of

Contract, Instructions to tenderers, General and Special Tender conditions carefully and

note that, by submitting the tender documents, duly signed, they have accepted these

conditions and undertake to abide by these conditions.

EARNEST MONEY DEPOSIT & SECURITY DEPOSIT:

2.1 EARNEST MONEY DEPOSIT: FOR OPEN TENDERS:

2.1.1 Earnest Money may not be taken from other Railways, Govt. Departments, SSI units

registered by NSIC, manufacturers and their authorized agents and firms borne on the list

of the approved sources of Railway/RDSO/DLW/CLW/ICF/RCF/CORE,etc. The Earnest

Money may not be taken also from tenderers who are registered with S.C. Railway.

2.1.2 In this connection, it may be noted that such waiver of Earnest Money in favour of SSI

Units registered with NSIC and firms registered with the Railways may be considered in

respect of items/Trade Groups for which, the tenderer is registered with the

Railways/NSIC and upto a value equal to monetary limit of such registration.

2.1.3 The amount of EMD to be taken in Advertised tenders wherever applicable, will

be 2% of the estimated tender value subject to an upper limit of

a) Rs.5 Lakh for tenders valuing upto Rs. 10 Crores and

b) Rs.10 Lakhs for tenders valuing above Rs.10 Crores.

2.1.4 EMD should remain valid for a period of 45 days beyond the final bid validity period.

2.1.5 Tenderers seeking waiver of/exemption from payment of Earnest Money shall have to

submit requisite documentary evidence in support of their claim. For the other tenderers,

Earnest Money as stipulated in the Notice for Invitation of Tenders (NIT) will have to

be paid.

2.1.6 Tenderers other than those who are exempt from paying Earnest Money or in whose

favour Earnest Money Payment may be waived as detailed in the preceding paragraphs

shall be required to give Earnest Money failing which, their offers shall be liable to be

ignored.

2.1.7 Forfeiture of Earnest Money:

Read and Accepted

Signature of Tenderer

3

When the tenderers undertake to keep the offers valid for a particular period but if the offer

is withdraw or revised within the validity period, the Administration gets the right to forfeit

the Earnest Money Deposit.

2.2 SECURITY DEPOSIT:

Please note the following conditions of IRS Conditions of Contract:

2.2.1 Para 0501: Unless otherwise agreed between the Purchaser and the contractor, the

contractor shall, within 14 days of written notice of acceptance of the tender has been

posted to the contractor, deposit with the Railway concerned (in cash or the equivalent in

Government Securities or approved Banker's Guarantee Bond) a sum equal to 10 per cent

of the total value of the stores detailed in the contract for which, the tender has been

accepted, subject to upper ceiling of Rs.10 Lakhs for contracts valuing upto Rs.10

Crores & Rs. 20 Lakhs for contract valuing above Rs. 10 Crores.

2.2.2 SAFETY ITEMS: The Security Deposit (SD)/Performance Guarantee shall be taken from

all firms for contracts for all Safety Items placed against Advertised Tenders and Global

Tenders subject to following exemptions:

a) Vendors registered with NSIC upto the monetary limit of their registration for the items

ordered. Tenderers seeking waiver of Security Deposit on this ground shall have to

submit requisite documentary evidence.

2.2.3 OTHER THAN SAFETY ITEMS: The Security Deposit (SD) shall be taken from all

firms for contracts for items other than safety items placed against Advertised

Tenders and Global Tenders subject to following exemptions:

a) Vendors registered with NSIC upto the monetary limit of their registration for the items

ordered.

b) Vendors registered with Railways upto the monetary limit of their registration for the

items ordered/trade groups for items ordered or vendors on approved list of

RDSO/PUs/CORE/Railways etc. for those specific items for which they are on

approved list or other Railways, Govt.Departments on their specific request and on

merits of the case as considered by tender committee.

c) Tenderers seeking waiver of Security Deposit on this ground shall have to submit

requisite documentary evidence.

2.2.4 The usual security deposit, shall, however be taken in the case the contracts are

placed on unregistered/unapproved firms or for items for which a particular firm is

not registered/approved.

2.2.5 Security Deposit should remain valid for a minimum period of 60 days

beyond the date of completion of all the contractual obligations of the

supplier.

2.2.6 Para 0502: If the contractor, having been called upon by the Purchaser to furnish security

fails to make and to maintain a security deposit within the specified period, it shall be

lawful for the Purchaser:-

a) to recover from the Contractor the amount of such security deposit by deducting the

amount from the pending bills of the contractor under the contract or any other

contract with the purchaser or the Government or any person contracting through the

Purchaser or otherwise however, or

b) to cancel the contract or any part thereof and to purchase or authorize the purchase of

the stores at the risk and cost of the contractor and in that event the provisions of

Clauses 0702 shall apply as far as applicable.

2.2.7 Para 0503: No claim shall lie against the Purchaser in respect of interest on cash deposits

or Government Securities or depreciation thereof.

Read and Accepted

Signature of Tenderer

4

2.2.8 Para 0504: The Purchaser shall be entitled and it shall be lawful on his part to forfeit the

said security deposit in whole or in part in the event of any default, failure or neglect on the

part of the Contractor in the fulfillment or performance in all respects of the contract under

reference or any other contract with the Purchaser or any part thereof to the satisfaction of

the Purchaser and the Purchaser shall also be entitled to deduct from the said deposits

any loss or damage which the Purchaser may suffer or be put by reason of or due to any

act or other default, recoverable by the Purchaser from the Contractor in respect of the

contract under reference or any other contract and in either of the events aforesaid to call

upon the contractor to maintain the security deposit at its original limit by making further

deposits, provided further that the Purchaser shall be entitled to recover any such claim

from any sum then due or which at any time thereafter may become due to the Contractor

under this or any other contracts with the Purchaser.

2.2.9 The Earnest Money and Security Deposit is to be paid in any of the manner prescribed

below.

1. Government securities at 5 percent below the market value.

2. Deposit Receipts, Pay Orders, Demand Drafts and Guarantee Bonds of the

State Bank of India or any of the Nationalised Bank.

3. Deposit Receipts, Pay Orders, Demand Drafts and Guarantee Bonds issued

by any Scheduled Commercial Bank.

4. Deposit Receipts, of the Post Office Saving Bank.

5. The Bond of Indian Railway Finance Corporation (in case of bonds issued

under non-cumulative interest scheme, post dated interest warrants should be

submitted along with the bonds and the interest warrants could be given back

as and when the interest becomes due) and KRCL Bonds of Rs.1000 each.

Payment of Security Deposit and Earnest Money in the form of Pay Order/Demand Draft

should be made in favor of FA&CAO only.

3. FAX Quotations and late Tenders:

i. Offer received through FAX may be considered in case of procurement of items through

proprietary article certificate & single tender only subject to the firm submitting post

conformation copy on their letter head duly signed by the authorized person as per the

tender conditions within ten working days from the date of opening.

ii. However for other type of the tenders i.e. for Bulletin Limited and Advertised open tenders

etc. offers received through FAX and found in the tender box at the time of the opening of

tenders and complete in all respects and duly signed by the authorized signatory should

be treated as in time offer subject to the firm/firms submitting post conformation copy duly

signed by the authorized person as per the tender conditions within ten working days from

the date of opening.

iii. All other offers received by FAX not covered in para (i) & (ii) above shall be treated as

invalid. The offers received by FAX as covered in para (ii_ above shall be deemed as

unresponsive in case the conformation copy is not received within the time stipulated in

para(ii) above.

iv. No purchase order shall be issuing against the FAX offers without receipt of the

conformation copy of the same.

v. It shall be the sole responsibility of the tenders to ensure that the offers submitted by FAX

are dropped in appropriate tender box in sealed cover/covers and within the prescribed

time and date. The Railways shall not beresponsible in any way for any in dropping the

FAX offers in the appropriate tender box.

vi. Late and delayed tenders will not be accepted.

4. Drawings and Specifications:

4.1 Unless Drawings and Specifications as mentioned in the tender schedule/enquiry/offer form

are provided with the tender documents or made available in S.C. Railway website for

downloading by the tenderers, these may be obtained in the manner shown below:

Read and Accepted

Signature of Tenderer

5

i) Specification/STR/Drawing of RDSO/ICF/DLW/ CLW/ CORE etc may be obtained

from the concerned authority who have issued these, on payment.

ii) Drawings and Specifications framed by the concerned authority of S.C.Railway

may be obtained from office of the Controller of Stores, South Central Railway, 6th

Floor, Rail Nilayam, Secunderabad-500 071.

However, in these cases, the tenderers shall have to:-

(a) Produce the documentary evidence for having paid the cost of tender documents by

them unless they are provided with these documents free of cost because of their

entitlement / eligibility. In the later case, the tenderer will have to produce

documentary evidence that they have been provided with free tender documents.

(b) For such tenderers who download the tender documents, they have to produce the

proof of such download while asking for such drawings and specifications.

4.2 If any tenderer happen to quote with their own Drawing No / Part No / Specification, then,

they shall have to, necessarily, submit all the requisite documents and information in support of

their offer being to be in conformity with the tender Drawing / Specification. Furthermore, copies of

such drawings / specifications / catelogue are also to be enclosed, failing which the offer will be

liable to be rejected.

5. Attendance of Representatives for Tender Opening:

For Open Tenders and Special Limited Tenders, representatives of tenderers desirous to

attend the tender opening can do so on production of a proper letter of authority from the

respective firm, failing which they may not be allowed to attend the tender opening. Authorised

representatives of those firms who have submitted the tender documents alone shall be allowed to

attend the tender opening.

6. Particulars to be enclosed along with tender:

Following details should be enclosed along with the tender:-

i) Performance statement against Railways Orders for supply of same or similar items.

Correct status/supply position of pending orders if any should be invariably indicated.

Supporting documents are to be enclosed.

ii) Details of Machinery and Plant, other equipments, testing facilities, quality

management/control systems and details of technical manpower available.

iii) Tenderers should submit documentary evidence in respect of their RDSO approval

indicating current validity and approval of their QAP by RDSO wherever necessary.

iv) Photo Copies of the supply/purchase orders along with the Inspection Certificates by

RITES/RDSO and Receipt Notes should be enclosed for ready reference, along with

tender to substantiate their past performance.

v) The Tenderers should also indicate their registration number with South Central

Railway with monetary limit, trade groups for which registered and, validity date of

registration.

vi) NSIC Certificate if Registered with NSIC.

vii) Proof for having paid EMD or grounds in favour of exemption/waiver.

viii) Complete Tender documents duly signed on each page in token of acceptance.

7. Rate , Taxes and Duties:-

7.1 Tenderers should clearly indicate separately ex-works basic price, packing charges,

forwarding charges, Excise Duty, Educational Cess Sales Tax/VAT and Freight charges

upto destination, applicable for each unit tendered. Duties and Taxes are not payable on

freight charges and forwarding charges. Therefore, if the tenderer happens to quoted a

composite price, due break-up is to be given showing freight and forwarding charges

separately.

7.2 Tenderers are requested to quote in the following terms :-

FOR Destination basis, duly indicating separately breakup of Ex works Price, Duties,

Taxes, Packing, Forwarding and Freight charges.

Read and Accepted

Signature of Tenderer

6

7.3 The tenderers are required to quote in the same rate units (Nos./Kgs./Sets/ mtrs/ kmtrs

etc.) as given in the tender schedule. Any deviation in this aspect will make the offer liable

to be ignored.

8. Price Variation Clause:-

8.1 Railways, in general, prefer firm price contracts.

8.2. However, there may be cases of procurement of stores which are raw-material (Steel/

Non-Ferrous) intensive wherein the tenderers may quote with Price Variation clause.

Such Price Variation Clause must be unambiguous and having clear price variation

formulae. Ambiguous conditions like “Price Variation Clause applicable” will not be

acceptable and such offers shall be summarily rejected.

8.3. Following Price Variation Clauses are generally recognized by the Railways.

a) IEEMA PVC for the items covered by IEEMA formulae.

b) Railway Board’s PVC for items covered by such formulae.

c) DGS&D’s PVC for the items which are covered by such formulae.

Note:- Tenderers whose offers are with IEEMA PVC, Railway Board’s PVC / DGS&D’s

PVC are to quote with the prices of input raw materials ruling on the base date as

stipulated in the relevant PVC ( IEEMA/ Railway Board/ DGS&D). For example in case of

IEEMA PVC, if the Tender opening date falls in May of a year, the applicable prices of

input raw materials should be those prevailing on the 1st April of that year. If any Tenderer

quotes with any other base date (for prices of input raw materials), then all such offers

shall be updated to the common base date as stipulated in the PVC of IEEMA/Rly Board/

DGS&D as the case may be. For example, in the case of IEEMA PVC for a tender

opened in May of a year, if any tenderer quote with prices of input raw materials ruling on

a base date other then 1st April of that particular year, quoted rates shall be updated to

the base date of 1st April of that particular year (for input raw materials) for the purpose of

evaluation of offers and determination of inter –se ranking of the offers.

8.3.1. For those items which are not covered by any of the aforesaid PVC, other PVC specific for

such stores may be considered and accepted if found to be in order. However, in all such

cases, the contract prices upward/downward will be regulated with reference to the date of

inspection of stores and will be applicable to the stores tendered for inspection after one

month from the date of variation in the price of relevant input material by the specified

agencies like SAIL, HZL, HCL etc. The date on which stores are offered for inspection will

be treated as the date of supply for the purpose of Price Variation Clause. Furthermore,

the base month for such input materials will be one month prior to that of tender opening.

Admission of any claim in this regard will be subject to the suppliers furnishing all the

supporting documents.

If any tenderer quote with any other base month, for input materials, then all the offers

shall be updated to the base month (for input materials) of one month prior to that of

tender opening. Evaluation of offers and determination of inter-se ranking of the offers

shall be done on this basis.

8.4. Tenderers who quote with price escalation on account of raw material in the tenders will

please note that such escalation claims will be subject to verification by the Financial

Adviser and Chief Accounts Officer of the Railway with reference to the records that may

be called for from them. Successful tenderer will be required to produce complete records

including position of ground stocks available at the time of submission of tender for

verification / examination of their claims under price escalation before their claims are

accepted. If the tenderer fails to establish his claim by producing satisfactory records

before the FA & CAO of this Railway their claim will be disallowed and/ or proportionately

reduced.

Read and Accepted

Signature of Tenderer

7

8.5 Special terms and conditions for all the Lead Acid Batteries :

“ The tenderer should indicate weight of lead used in manufacturing of one battery as rawmaterial”

input. Modvat/additional duty set-off on the goods supplied if any, accrued to the

tenderer will have to be passed on to Railways (purchaser) under the MODVAT Scheme

by way of reduction of prices.

9. Excise Duty:

(a) Tenderers are requested to refrain from quoting vague terms like “Excise Duty applicable”

and mention clear the rate of ED leviable for the tendered stores. If the quoted rate is inclusive of

ED, the tenderer must indicate the ED considered clearly. If it is not done so, then, the offer will

be taken as inclusive of ED at the highest rate obtained in the tender batch. General phrases as

“Excise duty Extra as applicable” shall not be accepted. Please mention clearly if excise duty is

applicable on the tendered item or not.

If Excise Duty (ED) is being charged extra, then the tenderers should clearly indicate the

exact rate of ED applicable in their offers.

If concessional ED is applicable at the time of quoting of offers and the tenderers wish that

actual ED at the time of supply should be paid, then they should clearly indicate that ED will vary

based on the turn over value and must also indicate the maximum rate of ED payable. Tenders

will be evaluated on the basis of maximum rate of ED which may become applicable. However,

ED will be reimbursed at actuals and within the upper ceiling of the maximum ED rate considered

for evaluation purpose.

If ED is not claimed in the offer and no mention is made about Excise duty, then no ED will

be payable. If ED is claimed in the offers with exact rate and statutory variation is also claimed by

the firm in the offer, the same will be considered duly evaluating the offers with exact rate of ED.

In no case the variation in ED due to increase in turnover during the currency of contract

will be admissible unless specifically mentioned in the offer.

If tenderers misclassifies the goods under relevant excise tariff rules, the Railway will not

pay increased Excise Duty due to such misclassification.

ED will be paid subject to documentary evidence and government notifications only.

(b) Payment of ED and Excise Duty- Modvat Rules.

1. The purchaser will not be responsible for payment of taxes and duties paid by the

supplier under misapprehensions of law or misclassification and in such cases even

if the suppliers bill contain an element of tax or duty which is not payable by the

purchaser, such payment would be disallowed.

2. The claim for ED on each bill should be supported by the following certificates.

2.1 The rate of ED is advalorem. The ED at present legally leviable in this case is

Rs……i.e on Rs…..being the unit value of the Stores assessed by the concerned

authority of the Excise department.

2.2 Certified that the ED charged on this bill is not more than that legally leviable and

payable under the provision of the relevant act or rules made thereunder.

2.3 Certified that the amount of Rs……..claimed as ED in this bill is in accordance with

the provision of the rules in all respects and the same has been actually paid to the

excise authorities in respect of the stores covered by the bills.

2.4 Quarterly certificate to the effect that no refund of ED already reimbursed against

this contract has been obtained during the quarter ending. In the event of any such

refund being obtained by the seller, the same should be passed on to the purchaser.

2.5 MODVAT Certificate:- The tenderers will have to give the following certificates in

their offer:-

We hereby declare that in quoting the above price, we have taken into effect, the full

effect of the duty set-off on 'Central excise and counter veiling duties' .available

under the existing MODVAT scheme. We further agree to pass on such additional

Read and Accepted

Signature of Tenderer

8

duties and set off as may become available in future in respect of all the inputs used

for the manufacture of the final product, on the date of the supply under MODVAT

scheme, by way of reduction in price and advise the purchaser accordingly.”

2.6 Special MODVAT Condition for all the Lead Acid Batteries :

The tenderer has to give details of MODVAT benefit on raw material (lead), which

will be passed on to the purchaser. The tenderer should indicate weight of ‘Lead’

used in manufacturing one battery as ‘Raw Material’ input. Modvat

benefits/additional duty set-off on the goods supplied, if any, accrued to the tenderer

will have to be passed on to the Railways (purchaser) under the MODVAT Scheme

by way of reduction in prices.

10. Sales Tax/Valve Added Tax :

Sales tax / Value Added Taxes should be quoted extra if applicable.

Issue of Form ‘D’ towards CST on inter-state purchase by Railways is withdrawn.

Consequent upon the withdrawal of ‘D’ Form, the rate of CST on inter-state sale to Railways shall

be the rate of VAT/State Sales Tax applicable in the state of the selling dealer.

Wherever Value Added Tax is applicable, the following may be noted :

(1) (i) The tenderer should quote the exact percentage of VAT that they will be charging extra.

(ii) While quoting the rates, tenderer should pass on (by way of reduction in prices) the set

off/input tax credit that would become available to them by switching over to the system of

VAT from the existing system of sales tax, duly stating the quantum of such credit per unit of

the item quoted for.

(iii) The tenderer while quoting for tenders should give the following declaration:

“We agree to pass on such additional set off/input tax credit as may become available in

future in respect of all the inputs used in the manufacture of the final product on the date of

supply under the VAT scheme by way of reduction in price and advise the purchaser

accordingly.”

(2) The supplier while claiming the payment shall furnish the following certificate to the paying

authorities:

“We hereby declare that additional set offs/input tax credit to the tune of Rs. ____________

has accrued and accordingly the same is being passed on to the purchaser and to that

effect the payable amount may be adjusted .

If any surcharge on tax is applicable the same should be indicated clearly.

If Excise duty and Sales tax are not quoted in the offer, it shall be considered that no excise

duty/sales tax is applicable.

11. Octroi Exemption Certificate:

The purchaser will not bear any octroi charges, and if required will issue octroi exemption

certificate only. In the event of octroi exemption certificate not being honoured by the concerned

municipal authority, and octroi charges become payable, the supplier will have to bear the Octroi

charges.

12. I.T.C.C.: This will be governed by extant rules of the Government of India. Tenderers are to

indicate the Income-Tax PAN details and enclose a Photocopy of the same.

13. Validity:

Tenderers are to keep validity of their offer open for a minimum period of 120 days. Offers with

validity period of short duration may be taken as unresponsive to Railway’s requirements.

Read and Accepted

Signature of Tenderer

9

14. Evaluation Criteria:

i) Rates quoted by the Tenderers with discounts if any linked to quantity will be considered

for determining inter-se position of the offers. Discounts with conditions attached to early

payment, early Receipt notes etc., will be ignored for calculating inter-se position.

However, Railway may avail the discounts linked to early payment, early receipt notes etc.

if otherwise, firm’s offer is found to be acceptable.

ii) Inter-se ranking of the offers will be determined on Total Unit Rate basis which will include

basic rate, ED, Educational Cess, ST, Packing charges, Forwarding charges, freight,

insurance and any other charge or cost quoted by the tenderer. In case of offers with P.V.

Clause, the quoted rates shall be updated to a common base date for such assessments.

iii) The criteria for evaluation of inter-se-position of bidders shall be item wise and

destination wise unless otherwise some other evaluation criteria is specifically

mentioned in the tender.

GENERAL TENDER CONDITIONS

1. Acceptance of the Offers:-

The Controller of Stores is not bound to accept the lowest or any offer nor to assign any

reason for doing so and reserve to himself the right to accept any offer in respect of the

whole or any portion of the item specified in the tender and contractor shall be required to

supply at the rate quoted.

2. Quantity to be ordered:

(a) Railways reserves the right to cancel the tender for full or part quantity tendered

without assigning any reason. The rates quoted by the tenderers for the full quantity

would be taken as valid.

(b) (i) Wherever necessary by the purchaser, the quantity to be ordered can be split by the

purchaser amongst two or more sources for ensuring better availability of material

keeping in view the vital/critical nature of item, quantity to be procured, delivery

requirements, capacity of the firms and past performance of the firms.

(ii) CRITERIA FOR SPLITTING OF TENDER QUANTITY:

In all cases of split ordering, the following Criteria will be applicable:

i) The Purchaser reserves the right to distribute the procurable quantity on one

or more of the eligible tenderers. Zone of consideration of such eligible

tenderers will be the right of the Purchaser.

ii) Whenever such distribution/splitting of the tendered/procurable quantity is

made, the quantity distribution will depend upon the differential of rates quoted

by the tenderers (other aspects i.e. adequate capacity-cum-capability,

satisfactory past performance of the tenderers, outstanding orders load for the

Railway making the procurement etc., being same/similar). For example; if the

differential of rates between the L-1 and L-2 eligible vendors is 5%, then the

distribution of quantity will be approximately in the ratio 55:45 (55% for the L-1

tenderer). If the price differential is 3%, then the distribution of quantity will be

approximately in the ratio 53:47 (53% for the L-1 tenderer) and so on.

iii) The rate of the highest eligible tenderer within the zone of consideration has to

be, per-se, reasonable to the Purchaser.

iv) In the cases of inadequate capacity-cum-capability, dissatisfactory past

performance, large quantity of outstanding orders (liquidation of which will

take very long time) etc., the Purchaser shall have the right to distribute the

procurable quantity amongst tenderers with due consideration to these

constraints and in such a manner as would ensure timely supply of materials

in requisite quantity to meet the needs of operation, maintenance, safety etc.,

of the Railways, regardless of inter-se-ranking of the tenderers and in a fair

Read and Accepted

Signature of Tenderer

10

and transparent manner with due conformity to the Principle of natural Justice

and Equity.

(c) The purchaser reserves the right to increase and /or decrease the order quantity by a

quantity not exceeding 30% of the ordered quantity on the same price and terms and

conditions during the currency of the contract , with suitable delivery schedule for the

enhanced quantity.

3. Procurement from Approved Sources :

3.1. Approved by RDSO:

3.1.1. Wherever necessary, as per policy of procurement, bulk purchases will be made only

from those firms who have been approved by RDSO for such ordering i.e. Part-I vendors

before opening of tender to manufacture and supply the item. The tenderers are to

enclose copies of RDSO approval letters along with their quotation. The status of the firm

will be reckoned as on the date of tender opening and not thereafter. But, in case of

downgrading/removal/suspension/banning etc. after opening of tender, such changes

shall be taken into account while considering the offers.

3.1.2. Orders on firms approved by RDSO as Part-II vendors shall be Developmental Orders,

normally.

3.1.2.1 -Orders on firms approved by RDSO as Part-II vendors shall be limited

upto 15% quantity normally.

3.1.2.2 -The ordering on a Part II approved source with competitive price

ranking can be considered beyond 15% in case that source has successfully

executed a larger quantity order in the same Railway unit or other Railway

units/P.Us in the preceding 3 years. Successful executions will be signified by

both quantitative and qualitative performance. Upper limit of quantity to be

ordered on such a source will not exceed 25% of the net procurable quantity in a

given procurement case with another 5% on new source in deserving cases and

with strict compliance of extant procedure on such educational ordering. That is to

say, the ordering quantity on a Part -II source can be up to 15% or the highest

quantity of a past order, successfully executed in the preceding 3 years in the

same Railway unit or other Railway units/P.Us, whichever is higher subject to

maximum of 25% of the net procurable quantity in the given procurement case.

3.1.2.3 Aggregate quantity to be ordered on all Part – II approved vendors

taken together, however, will not exceed the 25% of the net procurable quantity, in

a given procurement case.

3.1.2.4 All the Part - II approved vendors must submit attested photo

copies of P.Os, inspection certificates and R.notes/certificates related to the

maximum quantity of the material under procurement, successfully

supplied by them in any single order placed on them over preceding 3 years

by any zonal Railway/P.U. Such tenderers are to note that non-submission

of such documents shall be taken as their not having any such past

performance and their offers shall be considered further as per extant rules

and no back reference in this regard will be made to them.

3.1.2.5. If the tendering firm(s) is not approved by RDSO as mentioned

above either for placement of bulk order or for developmental orders, than they must

submit their credentials details i.e. Machinery and Plant, Testing Facilities, QAP,

Technical Manpower, etc. In deserving cases, their offers may be considered for

educational orders after assessment of capacities/capabilities by RDSO. Failure to

furnish requisite credentials as mentioned above will make their offer liable to be

ignored.

Read and Accepted

Signature of Tenderer

11

3.2. Approved by DLW/CLW/ICF/CORE/RCF/CME/CEE-S.C.RLY:

Same conditions shall apply as in the case of RDSO approved sources as detailed in Para

3.1 above with the exception that wherever “RDSO” is appearing, the same should be

replaced by “DLW/CLW/ICF/CORE/RCF/CME/CEE-S.C.RLY.”

3.3. Procurement of materials falling in the category other than those in Para 3.1 and 3.2

above:

In these cases, the Railways reserves the right to make bulk procurement from the

tenderers who conform to/comply with the eligibility criteria (as detailed in the special

conditions of tender) whereas developmental orders may be considered for placement on

other sources whose offers are competitive and who have submitted adequate evidence

towards their capacity-cum-capability and prima facie the Railways are satisfied they are

capable of executing the orders but whose capacity to supply bulk quantity has not been

established in the past.

4. Purchase / Price Preference Clause:-

The purchaser reserves the option to give a purchase / price preference to the offers

from Public Sector units and /or from Small Scale/Cottage Industries Units, over those from other

firms, in accordance with the policies of the Govt. from time-to-time. The price preference above

cannot however, be taken for granted and every endeavor need be made by them to bring down

cost and achieve competitiveness.

5. Purchase Preference Clause:-

Purchase preference to Central Public Sector Undertakings if applicable as per relevant

guidelines of Government Of India may be granted in the following manner:-

Other thing being equal, purchase preference will be granted to the Central Public Sector

Enterp;rises (CPSEs) at lowest valid price bid (L1) if the price quoted by a CPSE is within 10% of

the L1 price. The salient features of the policy are as under:

(i) Purchase Preference Policy(PPP) support will be extended to the contracts of the

value of Rs. 5 Crores and above but not exceeding Rs.100 Crore. For deciding

the applicability of PPP, the value of option quantity shall not be taken into

consideration.

If civil works are included as part of the contract for supply of goods and/or if the

contract is a turnkey contract, such contracts would also be covered by PPP,

subject to the condition that the total value of the contract does not exceed Rs.100

Crore.

(ii) PPP will apply only to CPSEs and their subsidiaries (i.e. where PSE owns 51% or

above shareholding), but not to a joint venture owned by a PSE and a private

sector partner.

(iii) A minimum value addition of 20% by the CPSEs/ subsidiary companies by way of

manufacturing and / or services would be a prerequisite for availing of purchase

preference.

6. Quotations for Imported items:-

6.1. Quotations in Foreign Currency:-

6.1. 1. Please note that, in case of Quotations in Foreign Exchange the firms should

quote on FOB basis.

6.1.2. Any additional expenditure incurred by the purchaser on account of increased

Custom Duty, Freight charges as also extra cost which may arise on account of

Variation in Exchange rate during the extended delivery schedules, shall be borne

by the Contractor.

6.2. Imported Stores offered by Indian Agents in Indian Currency:

Any authorized dealer / agent / recognized industrial distributor quoting on behalf of their

foreign principal in Indian Rupees shall have to comply with the following:-

1. To quote with tender specific authorization from the foreign manufacturer.

Read and Accepted

Signature of Tenderer

12

2. (i) While quoting on behalf of foreign principals tenderers are required to furnish the

principal’s invoice/ proforma invoice along with their quotation.

(ii) Proforma invoices however, may be accepted in exceptional cases where, it is not

possible to obtain the invoices before the contract is placed.

3. The tenderer shall have to undertake in the tender to comply with the following –

a) Consent to furnish copy of customs out passed bill of entry for the goods, relevant to

each consignment Manufacturer’s Test and Guarantee certificate issued by the

manufacturer, Copy of Bill of Lading/AWB relevant to the consignment; Copy of

commercial invoice of the foreign manufacturer/principals relevant to each

consignment.

b) Current and valid authorization/dealership certificate of foreign manufacturer/principal.

c) Compliance of sea/air worthy packing condition in manufacturer’s original packing with

manufacturer's tamper proof seal and compliance of the Packing condition as laid

down in IRS Conditions of Contract Para- 1800.

Failure to comply with any of the aforesaid conditions as referred above will make the

offer liable to be rejected.

4. Tenderer has to indicate the following while submitting the offer:

(a) The precise relationship between the foreign manufacturer/principal and their

agents/associates.

(b) The mutual interest which the manufacturer/principal and the Indian

agent/associates have in business of each other is to be indicated.

(c) Indian agent’s Permanent Account Number is to be indicated.

5. Any additional expenditure incurred on account of Customs Duty and Exchange Rate

variation during pendency of the Contract will be on contractor’s account.

6. For bearings manufactured in foreign countries, Visual inspection by RITES inside India

after receipt is acceptable with import documents and original manufacturer's test and

Warranty/ Guarantee certificate. Firm should consent to deposit security money as per

IRS conditions for due execution of the contract if asked to do so. This is irrespective of

the fact whether the firm is registered with this Railway or not.

7. Payment Terms:

7.1 Payment for the stores or each consignment thereof will be made to the contractor on

submission of bill accompanied by the prescribed documents mentioned in the contract.

7.2 95% payment for the stores or each consignment thereof will be made against Inspection

Certificate and proof of dispatch. For dispatch of material by road, it is the challan of the

supplier duly certified by the consignee Gazetted Officer towards receipt of material at

consignee’s end will constitute the proof of dispatch for the purpose of payment. For rail

dispatch, clear and unqualified RR/PWB may be considered as the proof of dispatch.

7.3 For balance 5%, payment will be made on receipt and acceptance of stores by the

consignee, signified by granting of Receipt Note. In other words, balance 5% payment

shall be made against Receipt Note.

7.4 However, in this connection it is to be made clear that for orders valuing upto Rs.5 lakhs,

no advance payment will be made and only 100% payment will be made against receipt

and acceptance of the material by the consignee i.e., against Receipt Note.

7.5 In deserving cases, 98% / 2% payment can also be considered within the framework of

extant rules and procedures.

7.6 For Machinery & Plant items: 80% payment will be allowed after receipt of the machine in

good and acceptable condition at consignee’s end against inspection certificate and the

supplier’s challan certified by the consignee Gazetted Officer. Balance 20% payment will

be made on successful installation, commissioning and testing of the machine and also

furnishing of a Bank Guarantee towards warranty obligations of the contractor for 10% of

the value of the machinery or plant.

7.7 Discounts / rebates linked with early payment and / or early granting of Receipt Note etc

within specified days will not be considered for determination of inter-se ranking of the

Read and Accepted

Signature of Tenderer

13

offers. However, the Railways reserves the rights to avail themselves of such rebates /

discounts.

8. Inspection Clause:

(a) Material peculiar to Railways such as parts and fittings of rolling stock except raw

material, which have been found rectified during inspection and which could not be

rectified, are required to be defaced by the inspecting authority to avoid recycling of such

rejected material and to avoid ultimate failures to assets. All such rejected materials

peculiar to Railways should be mechanically defaced to prevent sale to Railways again.

(b) (i) Material to be pre-inspected by RDSO or RITES at Railway's option, or as stated in

this Tender Enquiry. Tenderers are requested to quote accordingly. At a later date any

request for change in inspection clause will not be considered.

(ii) In case the firm fails to offer the material for inspection against inspection call issued

to the inspecting agency or if the material have to be reinspected due to rejection of the

material at firms premises by the inspecting agency or due to non despatch of material

within validity of Inspection Certificate, then 50% of the inspection charges applicable for

the offered quantity subject to maximum of Rs 5,000.- and actual cost of the test

charges incurred will be paid by the supplier to the inspecting agency.

(iii) Traders/ authorized agents are required to offer material for inspection at

manufacturer’s premises only.

(c) Final inspection and acceptance of the supplied material will be done by the Consignee

after receipt of the material.

(d) The rejected material for exclusive use of Railways will be defaced to ensure that the

rejected item are not recycled and supplied to other Railways or purchasers.

9. Terms of Delivery:

(a) Mode of dispatch should be preferably by road.

(b) Suppliers should clearly quote-FOR Conditions i.e. station of dispatch or destination.

If firm's offer is FOR Destination then applicable freight charges should be clearly

indicated.

(c ) Transit Insurance for risk in transit should be arranged by the supplier, since risk in

transport in all such cases rests with the supplier.

(d) The firms who offer to dispatch the Stores by Road on FOR Station of dispatch basis,

but freight prepaid up to the Destination may seek reimbursement of such freight

charges. Such re imbursement shall be made at actuals and against documentary

evidence within the upper ceiling of Freight charges as indicated by them or Rail

freight by Passenger Train which ever is lower. However for evaluation of Offers, it is

the quoted Freight which will be considered.

10. Delivery Schedule:

(a) The tenderers are to note the Railway’s required delivery schedule given in the Tender

schedule/ Offer Form and quote accordingly. Vague Delivery terms like 2/ 32 weeks etc must be

avoided and if quoted will be taken as commercially unresponsive to railway’s requirement.

( b ) Time for and the Date of delivery as specified in the Purchase Order is the essence of the

Contract. However extension of Delivery date may be considered in deserving cases where

genuine reasons exists. Such extensions of delivery dated may be considered with Liquidated

damages and Denial Clause as per IRS conditions of Contract.

11. Cartel Formation:-

a) Whenever all or most of the approved firms quote equal rates and cartel formation

is suspected, Railways reserves the right to place order on one or more firms with

exclusion of the rest without assigning any reason thereof.

b) Firms are expected to quote for a quantity not less than 50% of the tendered

quantity. Offers for quantity less than 50% of tendered quantity will be considered

unresponsive and liable to be rejected in case Cartel Formation is suspected.

Railways however reserve the right to order on one or more firms any quantity.

c) The firms who quote in cartel may be warned that their names are likely to be

deleted from list of approved sources.

Read and Accepted

Signature of Tenderer

14

d) Wherever there is suspected cartel formation from approved sources, the Railways

reserve the right to place orders on Part-II sources and new sources beyond limits

of 15% and 5% respectively.

12. Time for making Risk Purchase:

Whereas this will be governed by the relevant clauses of IRS Conditions of Contract, such Risk

Purchase shall be made within 9 months from the date of breach of Contract.

13. Warranty Bank Guarantee:

For items like machinery and Plant, Costly equipment, capital Spares , the tenderer will have to

furnish a warranty Bank Guarantee of 10% of Material value to cover their warranty obligation. The

Format of the Warranty bank guarantee is enclosed herewith.

14. Marking of Material Supplied:

The tenderer should agree to indicate the Manufacture’s Name, Month and Year of manufacturing

by casting/stamping/etching/embossing, at an appropriate place of each piece supplied, without

affecting the functional utility and structural stability of the components/material.

15. Procurement from Manufacturers authorized agents/ Distributors:

Only Manufacturers or their authorized dealers/ distributors need to quote with tender specific

authorization from the manufacturers failing which offers are liable to be ignored.

Where a manufacturer appoints an agent or a distributor on the basis of a written agreement

with him for a specific territory or specific set of items, he shall give an undertaking to the following

effect.

1. Inspection by RITES/RDSO at the manufacturing premises of the relevant manufacturer.

RITES/RDSO shall categorically confirm in the Inspection Certificate, that inspection of

the material has been actually made in the manufacturing premises of the

manufacturers and not in the ware house/ godown. Shop of the dealer..

2. Direct dispatch from the premises of the manufacturer to the Railways consignee after

inspection and acceptance by RITES/RDSO.

3. Submission of manufacturer’s Test and Guarantee Certificate with each lot of supplies.

4.The authorized agents/distributors price will not exceed that which the manufacturer

would have quoted.

5.“One Agent cannot represent two Suppliers or quote on their behalf in a Particular tender”

Read and Accepted

Signature of Tenderer

15

IMPORTANT

National Electronic Fund Transfer (NEFT) is mandatory from 01-01-2008. No

Registration/Renewal of Firms will be granted without NEFT system after 01-01-2008. All

payments after 1.4.2008 are made only through NEFT/RTGS. Firms to keep the Mandate Form

along with their offers, if not already executed. Purchase order will not be issued without mandate

forms.

NEFT MANDATE FORM

From : M/s. Date :

To:

FA & CAO/WST

South Central Railway, Secunderabad

Sub : NEFT payments.

****

We refer to the NEFT being set up by S.C Rly. for remittance of our payments using RBI's

NEFT scheme, Our payments may be made through the above scheme to our under noted

account.

NATIONAL ELECTRONIC FUNDS TRANSFER MANDATE FORM

Name of City

Bank Code No.

Bank’s Name

Branch Address

Branch Telephone / Fax No.

Supplier’s Account No.

Type of Account

IFSC code for NEFT

IFSC code for RTGS

Supplier’s name as per Account

Telephone no. of supplier

Supplier’s E-mail ID

Confirmed by Bank Signature of supplier with

Stamp and address

Enclose a copy of crossed cheque

Read and Accepted

Signature of Tenderer

16

GOVERNMENT OF INDIA (BHARAT SARKAR)

MINISTRY OF RAILWAYS (RAIL MANTRALAYA)

(RAILWAY BOARD)

INDIAN RAILWAY STANDARD CONDITIONS OF CONTRACT

(Vide Para 417 of the Indian Railway Code for the Stores Department)

0100. Definitions and Interpretation.

0101. In the Contract, unless the context otherwise requires;

0102. "Acceptance of Tender" means the letter of memorandum communicating to the Contractor

the acceptance of his tender and includes an advance acceptance of his tender;

0103. "Consignee" means where the stores are required by the acceptance of tender to be

despatched by rail, road, air or steamer, the person specified in the Acceptance of Tender to

whom they are to be delivered at the destination; Where the Stores are required by the acceptance

of tender to be delivered to a person as an interim consignee for the purpose of despatch to

another person, such other persons; and in any other case the person to whom the stores are

required by the acceptance of tender to be delivered in the manner therein specified

0104. "Contract" means and includes the invitation to tender, instructions to tenderers,

acceptance of tender, Standard Conditions of Contract, Special Conditions of Contract, particulars

and the other conditions specified in the acceptance of tender and includes a repeat order which

has been accepted or acted upon by the contractor and a formal agreement if executed;

0105. The "Contractor" means the person, firm or company with whom the order for the supply is

placed and shall be deemed to include the contractor's successors (approved by the Purchaser),

representatives, heirs, executors and administrators as the case may be, unless excluded by the

terms of the contract

0106. "The Sub-contractor" means the person, firm or company from whom the Contractor may

obtain any material or fittings to be used in the supply or manufacture of the stores ;

0107. "Drawing" means the drawing or drawings specified in or annexed to the Schedule or

Specifications

0108. "Government" means the Central Government or a State Government, as the case may be;

0109. "The Inspecting Officer ” means the person specified in the contract for the purpose of

Inspection of stores or work under the contract and includes his authorised representative;

0110. "Material" means anything used in the manufacture or fabrication of the stores

0111. "Particulars" include-

(a) Specifications

(b) Drawings

(c) Pattern bearing the seal and signature of the Inspecting Officer (hereinafter called the

sealed pattern) which shall include also a certified copy thereof sealed by the Purchaser

for the guidance of the Inspecting Officer;

(d) Sample sealed by the Purchaser for guidance of the Inspecting Officer (hereinafter

called the certified sample) which shall include a certified copy thereof sealed by the

Purchaser for the guidance of the Inspecting Officer;

(e) Trade pattern, that is to say, a pattern, stores conforming to which are obtainable in the

open market and which denotes a standard of the Indian Standard Institute or other

standardising authority or a general standard of the industry :

(f) “ Proprietary mark "or “ brand “means the mark or brand of a product which is owned by

an industrial firm ;

(g) any other details governing the construction, manufacture or supply of stores as may be

prescribed by the contract ;

0112. " Purchase Officer " means the officer signing the acceptance of tender and includes any

officer who has authority to execute the relevant contract on behalf of the Purchaser

0113. " The Purchaser " means the President of India in the case of stores ordered for the Indian

Government Railways and includes his successors and assignees

0114. "Signed" includes stamped, except in the case of an acceptance of tender or any

amendment thereof

0115. "Site" means the place specified in the contract at which any work is required to be

executed by the contractor under the contract or any other place approved by the Purchaser for

the purpose;

Read and Accepted

Signature of Tenderer

17

0116. "Stores" means the goods specified in the contract which the contractor has agreed to

supply under the contract;

0117. "Supply Order" means an order for supply of stores and includes an order for performance

of service ;

0118. "Test" means such test as is prescribed by the particulars or considered necessary by the

Inspecting Officer whether performed or made by the Inspecting Officer or any agency acting

under the direction of the Inspecting officer;

0119. "Unit" and "Quantity" means the unit and quantity specified in the contract;

0121. The delivery of the stores shall be deemed to take place on delivery of the stores in

accordance with the terms of the contract, after approval by the Inspecting Officer if so provided in

the contract to -

(a) the consignee at his premises ; or

(b) where so provided the interim consignee at his premises , or

(c) a carrier or other person named in the contract for the purpose of transmission to the

consignee, or

(d) The consignee at the destination station in case of contract stipulating for delivery of

stores at destination station.

0122. Words in the singular include the plural and vice versa

0123. Words importing the masculine gender shall be taken to include the feminine gender and

words importing persons shall include any company or association or body of individuals, whether

incorporated or not;

0124. The heading of these conditions shall not affect the interpretation or construction thereof;

0125. Terms and expression not herein defined shall have the meanings assigned to them in the

Indian Sale of Goods Act, 1930 (as amended), or the Indian Contract Act, 1872 (as amended)

or the General Clauses Act, 1897 (as amended), as the case may be.

0200. Parties-

The parties to the contract are the Contractor and the Purchaser, as defined in Clauses 0105 and

0113.

0201. Authority of person signing the Contract on behalf of the Contractor-A person signing

the tender or any other document in respect of the Contract on behalf of the Contractor without

disclosing his authority to do so shall be deemed to warrant that he has authority to bind the

Contractor. If it is discovered at any time that the person so signing has no authority to do so, the

Purchaser may, without prejudice to any other right or remedy of the Purchaser, cancel the

contract and make or authorize the making of a purchase of the stores at the risk and cost of such

person and hold such person liable to the Purchaser for all costs and damages arising from the

cancellation of the contract including any loss which the Purchaser may sustain on account of such

purchase. The provisions of Clause 0700 shall apply to every such purchase as far as applicable.

0202. Address of the Contractor and notices and communications on behalf of the Purchaser:-

(a) For all purposes of the contract, including arbitration there under, the address of the

Contractor mentioned in the tender shall be the address to which all communications

addressed to the Contractor shall be sent, unless the Contractor has notified change by a

separate letter containing no other communication and sent by registered post

acknowledgement due to the Purchaser. The Contractor shall be solely responsible for

the consequence of an omission to notify a change of address in the manner aforesaid.

(b) Any communication or notice on behalf of the Purchaser in relation to the contract may be

issued to the Contractor by the Purchase Officer and all such communications and

notices may be served on the Contractor either by registered posts or under certificate of

posting or by ordinary post or by hand delivery at the option of such officer.

0300. Quotations of rates by Contractors

(a) The price quoted by the Contractor shall not be higher than the controlled price fixed by law

for the stores or where there is no controlled price, it shall not exceed the prices or

contravenes the norms for fixation of prices laid down by Government or where no such

prices or norms have been fixed by the Government, it shall not exceed the price appearing

Read and Accepted

Signature of Tenderer

18

in any agreement relating to price regulation by any industry in consultation with the

Government.

In any case, save for special reasons stated in the tender, the price quoted shall not be

higher than the lowest price charged by the Contractor for stores of the same nature, class

or description to a private purchaser, domestic or foreign as well as Purchaser

Governments.

(b) If the price quoted is higher than the controlled price or where there is no controlled price,

the price usually charged by the Contractor from a private Purchaser, domestic or foreign,

as well as Purchaser Government for the stores of the same nature, class or description the

Contractor will specifically mention this fact in his tender giving reasons for quoting higher

price(s). If he fails to do so or makes any mis-statement, it shall be lawful for the Purchaser,

(i) to revise the price at any stage so as to bring it in conformity with the Sub-clause (a)

above or

(ii) to terminate the contract and forfeit the Security Deposit.

0400. Contract.

0401. This contract is for the supply of the stores of the description, specifications and drawings,

and in the quantities set forth in the contract on the date or dates specified therein. Unless

otherwise specified, the stores shall be entirely brand new and of the best quality and

workmanship to the satisfaction of the Inspecting Officer. The stores shall further be in all respects

acceptable to the Inspecting Officer.

0402. Any variation or amendment of the contract shall not be binding on the Purchaser unless

and until the same is duly endorsed on the contract incorporated in a formal instrument or in

exchange of letters and signed by the parties.

INDIAN RAILWAY STANDARD CONDITIONS OF CONTRACT

0500: SECURITY DEPOSIT:

Please note the following Conditions of IRS Conditions of Contract:

0501: Unless otherwise agreed between the Purchaser and the contractor, the contractor shall,

within 14 days of written notice of acceptance of the tender has been posted to the

contractor, deposit with the Railway concerned (in cash or the equivalent in Government

Securities or approved Banker's Guarantee Bond) a sum equal to 10 per cent of the total

value of the stores detailed in the contract for which, the tender has been accepted, subject

to upper ceiling of Rs. 10 Lakhs for contracts valuing upto Rs.10 Crores & Rs.20

Lakhs for contract valuing above Rs.10 Crores.

SAFETY ITEMS: The Security Deposit (SD)/Performance Guarantee shall be taken from

all firms for contracts for all Safety Items placed against Advertised Tenders and

Global Tenders subject to following exemptions:

a) Vendors registered with NSIC upto the monetary limit of their registration for the items

ordered Tenderers seeking waiver of Security Deposit on this ground shall have to

submit requisite documentary evidence.

OTHER THAN SAFETY ITEMS: The Security Deposit (SD) shall be taken from all firms for contracts

for items other than safety items placed against Advertised Tenders and Global Tenders subject to

following exemptions:

a) Vendors registered with NSIC upto the monetary limit of their registration for the items

ordered.

b) Vendors registered with Railways upto the monetary limit of their registration for the

items ordered/trade groups for items ordered or vendors on approved list of

RDSO/PUs/CORE/Railways etc. for those specific items for which they are on

Read and Accepted

Signature of Tenderer

19

approved list or other Railways, Govt. Departments on their specific request and on

merits of the case as considered by tender committee.

c) Tenderers seeking waiver of Security Deposit on this ground shall have to submit

requisite documentary evidence.

The usual security deposit, shall, however be taken in case the contracts are placed on

unregistered/unapproved firms or for items for which a particular firm is not registered/approved.

Security Deposit should remain valid for a minimum period of 60 days beyond the

date of completion of all the contractual obligations of the supplier.

0502: If the contractor, having been called upon by the Purchase to furnish security fails to make

and to maintain a security deposit within the specified period, it shall be lawful for the

Purchaser: -

a) to recover from the Contractor the amount of such security deposit by deducting the

amount from the pending bills of the contractor under the contract or any other

contract with the purchaser or the Government or any person contracting through the

Purchaser or otherwise however, or

b) to cancel the contract or any part thereof and to purchase or authorize the purchase of

the stores at the risk and cost of the contractor and in that event the provisions of

Clauses 0702 shall apply as far as applicable.

0503: No claim shall lie against the Purchaser in respect of interest on cash deposits or

Government Securities or depreciation thereof.

0504: The Purchaser shall be entitled and it shall be lawful on his part to forfeit the said security

deposit in whole or in part in the event of any default, failure or neglect on the part of the

Contractor in the fulfillment or performance in all respects of the contract under reference or

any other contract with the Purchaser or any part thereof to the satisfaction of the Purchaser

and the Purchaser shall also be entitled to deduct from the said deposits any loss or

damage which the Purchaser may suffer or be put by reason of or due to any act or other

default, recoverable by the Purchaser from the Contractor in respect of the contract under

reference or any other contract and in either of the events aforesaid to call upon the

contractor to maintain the security deposits at its original limit by making further deposit,

provided further that the Purchaser shall be entitled to recover any such claim from any sum

then due or which at any time thereafter may become due to the Contractor under this or

any other contracts with the Purchaser.

0600. Delivery.

0601. The Contractor shall as may be required by the Purchaser either deliver free or f.o.r. or c.i.f.

at the place/places detailed in the contract, the quantities of the stores detailed therein and the

stores shall be delivered or despatched not later than the date specified in the contract. The

delivery, will not be deemed to be complete until and unless the stores are inspected and accepted

by the Inspecting Officer as provided in the contract.

0602. The Purchaser shall not be liable to render assistance to the Contractor in securing or to

arrange for or provide transport to the Contractor unless it is so specifically stated in the contract,

notwithstanding that transport of the stores, is controlled by or under the orders of the

Government.

0603. Notwithstanding any inspection and approval by the Inspecting Officer on the Contractor's

premises, property in the stores shall not pass on to the Purchaser until the stores have been

received, inspected and accepted by the consignee.

0604. No stores shall be deliverable to the consignee's depots on Sundays and public holidays

without the written permission of the consignee.

Read and Accepted

Signature of Tenderer

20

0700. Time for and Date of Delivery; the Essence of the Contract-

The time for and the date specified in the contract or as extended for the delivery of the stores

shall be deemed to be of the essence of the contract and delivery must be completed not later

than the date(s) so specified or extended.

0701. Progressing of Deliveries- The Contractor shall allow reasonable facilities and free

access to his works and records to the Inspecting Officer, Progress Officer or such other Officer as

may be nominated by the Purchaser for the purpose of ascertaining the progress of the deliveries

under the contract.

0702. Failure and Termination:- If the Contractor fails to deliver the stores or any instalment

thereof within the period fixed for such delivery in the contract or as extended or at any time

repudiates the contract before the expiry of such period the Purchaser may without prejudice to his

other rights:-

(a) recover from the Contractor as agreed liquidated damages and not by way of penalty a

sum equivalent to 2 per cent of the price of any stores (including elements of taxes, duties, freight,

etc.) which the Contractor has failed to deliver within the period fixed for delivery in the contract or

as extended for each month or part of a month during which the delivery of such stores may be in

arrears where delivery thereof is accepted after expiry of the aforesaid period, or

(b) 1. Risk Purchase clause is deleted for all orders for safety items, as levy of 10% Security

deposit has been made compulsory in all such order/(except in case of vendors registered

with NSIC upto the monetary limit of their registration for the items ordered). In case of

failure of contract, Security Deposit shall be forfeited. Such failure shall be recorded & will

be considered by Railways on merit in future cases.

2. In respect of orders for materials other than safety items where 10% security deposit has

been taken from firms, Risk Purchase clause is deleted and in case of default by such

firms, the Security Deposit shall be forfeited.

3. In such cases as covered under (1) and (2) above, the quantities unsupplied shall be

procured independently without risk and cost of the original firm/supplier.

4. Adverse performance of such firms will be recorded and intimated to the approving

authority & also to be taken into account in future tender cases on merit.

5. Such cases which are not covered under Para (1) & (2) above. Risk Purchase provisions

shall continue for them as per existing guideline as given below.

(c) The Purchaser reserves the right to purchase or authorise the purchase of the stores not so

delivered or others of a similar description (where stores exactly complying with particulars are not

in the opinion of the Purchaser, which shall be final, readily procurable) at the risk and cost of the

Contractor.

It shall, however, be in the discretion of the purchaser to collect or not, Security Deposit from

the firm/firm’s on whom the contract is placed at the risk and expense of the defaulted firm.

(d) Where action is taken under Sub-clause (c) above, the Contractor shall be liable for any

loss which the Purchaser may sustain on that account provided the purchase or if there is an

agreement to purchase 1 such agreement is made, in case of failure to deliver the stores within the

period fixed for such delivery in the contract or as extended within six months from the date of

such failure and in case of repudiation of the contract before the expiry of the aforesaid period of

delivery, with six months from the date of cancellation of the contract. The Contractor shall not be

entitled to any gain on such purchase and the manner and method of such purchase shall be in

the entire discretion of the Purchaser. It shall not be necessary for the Purchaser to serve a notice

of such purchase on the Contractor.

Note : In respect of the stores which are not easily available in the market and where

procurement difficulties are experienced the period for making risk purchase shall be nine months

instead of six months provided above.

0703. Consequence of Rejection- If on the stores being rejected by the Inspecting Officer or

Interim Consignee or Consignee at the destination, the Contractor fails to make satisfactory

supplies within the stipulated period of delivery, the Purchaser shall be at liberty to: -

(i) require the Contractor to replace the rejected stores forthwith but in any event not later

than a period of 21 days from the date of rejection and the Contractor shall bear all cost of

Read and Accepted

Signature of Tenderer

21

such replacement including freight, if any, on such replacing and replaced stores but

without being entitled to any extra payment on that or any other account, or

(ii) purchase or authorize the purchase of quantity of the stores rejected or others of a similar

description (when stores exactly complying with particulars are not in the opinion of the

Purchaser, which shall be final, readily available) without notice to the Contractor at his

risk and cost and without affecting the Contractor's liability as regards the supply of any

further installment due under the contract, or

(iii) cancel the contract and purchase or authorize the purchase of the stores or others of a

similar description (when stores exactly complying with particulars are not, in the opinion

of the Purchaser, which shall be final, readily available) at the risk and cost of the

Contractor. In the event of action being taken under Sub-clause (ii) above or under this

Sub-clause, the provision of Clause 0702 above will apply as far as applicable.

(iv) where under the contract the price payable is fixed F.O.R despatching station, the

Contractor shall, if the stores are rejected at destination by the consignee, be liable, in

addition to his other liabilities, including refund of price recoverable in respect of the stores

so rejected, to reimburse to the Purchaser the freight and all other expenses incurred by

the Purchaser in this regard.

0800. Extension of Time for Delivery-

If such failure as aforesaid shall have arisen from any cause which the Purchaser may admit as

reasonable ground for extension of time, the Purchaser shall allow such additional time as he

considers to be justified by the circumstance of the case, and shall forgo the whole or such part, as

he may consider reasonable, of his claim for such loss or damage as aforesaid. Any failure or

delay on the part of sub-contractor, though their employment may have been sanctioned under

Condition 1500 hereof, shall not be admitted as a reasonable ground for any extension of time or

for exempting the Contractor from liability for any such loss or damage as aforesaid.

0900. Examination of Drawing, Specifications and Patterns-

When tenders are called for in accordance with a drawing, specification or sealed pattern the

Contractor's tenders to supply in accordance with such drawing, specifications or sealed pattern

shall, be deemed to be an admission on his part that he has fully acquainted himself with the

details thereof and, in no circumstances, will any claim on his part which may arise on account of

his insufficient examination of the said drawing, specification or scaled pattern , be considered.

1000. Mistakes in Drawing.

The Contractor shall be responsible for and shall pay for any alterations for the works due to any

discrepancies, errors or omissions in the drawings or other particulars supplied by him whether

such drawings or particulars have been approved by the Purchaser or not provided that such

discrepancies, errors or omissions be not due to inaccurate information or particulars furnished to

the Contractor on behalf of the Purchaser. If any dimension figure upon a drawing or plan differ

from those obtained by scaling the drawing or plan, the dimensions as figured upon the drawing or

plan shall be taken as correct.

1100. Samples.

1101. Advance Sample- Where an advance sample is required to be approved under the terms

of the contract, the Contractor shall submit the sample free of cost to the Inspecting Officer within

the time specified in the acceptance of tender. If the Contractor is unable to do so, he must apply

immediately to the Office issuing the acceptance of tender for extension of time stating the reasons

for the delay. If the Purchaser is satisfied that a reasonable ground for an extension of time exists,

he may allow such additional time as he considers to be justified (and his decision shall be final)

with or without alteration in the delivery period stipulated in the acceptance of tender and on such

conditions as he deems fit. In the event of the failure of the Contractor to deliver the advance

sample by the date specified in the acceptance of tender or any other date to which the time may

be extended as aforesaid by the Purchaser or of the rejection of the sample, the Purchaser shall

be entitled to cancel the contract and, if so desired, purchase or authorize the purchase of the

stores at the risk and cost of the Contractor, in which case the provisions of Clause 0700 shall

apply as far as applicable.

1102. Unless otherwise provided in the contract, all samples required for test shall be supplied by

the Contractor free of cost. Where sample, which is supplied free, is rejected after examination

Read and Accepted

Signature of Tenderer

22

and test, the same or whatever remains of the sample, after examination and test will be returned

to the Contractor at his request and cost within three months of the date of such rejection at public

tariff rate at Owner's risk.

1103. Marking- Samples submitted shall be clearly labelled with the Contractor's name and

address and the acceptance of tender number.

1104. If the Contractor submits a sample whether with, before or after the tender, the same shall

not govern the standard of supply except when it has been specifically stated so in the acceptance

of tender.

1105. Where under the contract, the Contractor is required to submit an advance sample, any

expenses incurred by the Contractor on or in connection with the production of stores in bulk,

before the sample has been approved unconditionally, shall be borne by the Contractor and he

shall not claim any compensation in the event of such sample being found unacceptable by the

Inspecting Officer.

1106. The rejection of the sample by the Inspecting Authority or Inspecting Officer shall be final

and binding on the Contractor.

1107. Where the contract does not require any advance sample to be approved, the Contractor

may before proceeding with bulk manufacture or delivery of the stores, if he so desires, submit to

the Inspecting Officer for inspection a sample of the stores in which case a quantity not less than

one per cent of the total quantity to be supplied unless otherwise authorized by the Inspecting

Officer shall be submitted. The Contractor shall not, however, be entitled to be shown any

consideration or give any extension of time or claim to be exonerated from completing the delivery

within the stipulated period only on the ground of delay in the approval of any such sample.

1108. If, under the contract supplies are governed by a sealed pattern the Contractor shall be

bound to examine such pattern before preparing a sample or manufacturing the stores in bulk as

the case may be.

1109. Loan of Samples- If a certified sample is lent to the Contractor, it will bear a label

containing inter alia variations known to the Inspecting Officer between the said sample and the

stores desired. If the Contractor finds any further variation between the certified sample and the

particulars of specifications mentioned in the contract he shall at once refer the matter to the

Inspecting Officer and the Contractors shall also give intimation of such discrepancy to the

Purchase Officer. The Contractor shall follow the instructions of the Inspecting Officer as to what

sample of particulars should guide the production of stores and the decision of the Inspecting

Officer in the matter shall be final and binding on the Contractor.

1110. The Contractor shall not detach the said label from the certified sample and if for any

reasons the said label gets detached the Contractor shall at once return the certified sample to the

Inspecting Officer for attaching a fresh label.

1200. Risk of Loss or Damage to Government or Purchaser's Property.

1201. All the property of the Government or Purchaser loaned whether with or without deposit on

terms and conditions to be separately agreed upon in respect of each particular contract to the

Contractor in connection with the contract shall remain the property of the Government or the

Purchaser, as the case may be. The Contractor shall use such property for the purpose of the

execution of the contract and for no other purpose whatsoever.

1202. All such property shall be deemed to be in good condition when received by the Contractor

unless he shall have within twenty-four hours of the receipt thereof notified the Purchase Officer to

the contract. If the Contractor fails to notify any defect in the condition or quality of such property

he shall be deemed to have lost the right to do so at any subsequent stage.

1203. The Contractor shall return all such property and shall be responsible for the full value

thereof to be assessed by the Purchaser whose decision shall be final and binding on the

Read and Accepted

Signature of Tenderer

23

Contractor. The Contractor shall be liable for loss or damage to such property from whatever

cause happening while such property is in the possession of or under the control of the Contractor,

his servants, workmen, or agents.

1204. Where such property is insured by the Contractor against loss or fire at the request of the

Government or Purchaser such insurance shall be deemed to be effected by way of additional

Precaution and shall not prejudice the liability of the Contractor as aforesaid.

1300. Inspection by Inspecting Officer.

1301. (a) When inspection during manufacture or before delivery or despatch is required, notice

in writing shall be sent by the Contractor to the Inspecting Officer when the stores or material to be

supplied are ready for inspection and test, and no stores shall be delivered or despatched until the

Inspecting Officer has certified in writing that such stores have been inspected and approved by

him.

(b) In cases where the Inspecting Authority specified in the contract requires on behalf of

the Purchaser that inspection of the raw materials to be used and /or stage inspection during the

manufacturing process of the component/stores, etc. is also to be done, notice in writing shall be

sent by the Contractor to the Inspecting Officer to visit his premises/works to test the raw materials

and/or conduct necessary inspection during the manufacturing process of the component / stores,

etc. as deemed essential.

1302. Marking of Stores- The Contractor shall, if so required, at his own expense, mark all the

approved stores with a recognized Government or Purchaser's mark. The stores which cannot be

so marked shall, if so required by the Inspecting Officer, be packed at his own expense in suitable

packages or cases, each of which shall be sealed and marked with such mark.

The Inspecting Officer shall also have power to mark the rejected stores with a rejection

mark so that they may be easily identified, if resubmitted for inspection.

1303. Facilities for test and Examination- The Contractor shall, at his own expense afford to the

Inspecting Officer all reasonable facilities as may be necessary for satisfying himself, that the

stores are being and/or have been manufactured in accordance with the particulars. The

Inspecting Officer shall have full and free access at any time during the execution of the contract to

the Contractor's work for the purpose aforesaid, and he may require the Contractor to make

arrangements for inspection of the stores or any part thereof or any material at his premises or at

any other place specified by the Inspecting Officer and if the Contractor has been permitted to

employ the services of a Sub-Contractor, he shall in his contract with the Sub-Contractor, reserve

to the Inspecting Officer a similar right.

1304. Cost of Test- The Contractor shall provide, without any extra charge, all materials, tools,

labour and assistance of every kind which the Inspecting Officer may demand of him for any test

and examination, other than special or independent test, which he shall require to make on the

Contractor's Premises and the Contractor shall bear and pay all costs attendant thereon. If the

Contractor fails to comply with the conditions aforesaid, the Inspecting Officer shall, in his sole

judgement, be entitled to remove for test and examination all or any of the stores manufactured by

the Contractor to any premises other than his (Contractor's) and in all such cases the Contractor

shall bear the cost of transport and/or carrying out such tests elsewhere. A certificate in writing of

the Inspecting Officer, that the Contractor has failed to provide the facilities and the means, for test

examination shall be final.

1305. Delivery of Stores for Test- The Contractor shall also provide and deliver for test, free of

charge, at such place other than his premises as the Inspecting Officer may specify, such material

or stores as he may require.

1306. Liability for Costs of Special or Independent Test- In the events of rejection of stores or

any part thereof by the Inspecting Officer in the consequence of the sample which is removed to

the laboratory or other places of test, being found on test not in conformity with the Contract and in

the event of the failure of the Contractor for any reason to deliver the stores passed on test within

the stipulated period, the Contractor shall, on demand pay to the Purchaser all costs incurred in

the inspection and/or test. Cost of test shall be assessed at the rate charged by the laboratory to

private persons for similar work.

Read and Accepted

Signature of Tenderer

24

1307. Method of Testing- The Inspecting Officer shall have the right to put all the stores or

materials forming part of the same or any part thereof to such tests as he may think fit and proper.

The Contractor shall not be entitled to object on any ground whatsoever to the method of testing

adopted by the Inspecting Officer.

1308. Stores Expended in Test- Unless otherwise provided for in the contract if the test proves

satisfactory and the stores or any instalment thereof is accepted, the quantity of the stores or

materials expended in the test will be deemed to have been taken delivery of by the Purchaser and

be paid for as such.

1309. Powers of Inspecting Officer- The Inspecting Officer shall have the power :-

(i) before any stores or part thereof are submitted for inspection to certify that they

can not be in accordance with the contract owing to the adoption of any

unsatisfactory method of manufacture.

(ii) to reject any stores submitted as not being in accordance with the particulars.

(iii) to reject the whole of the installment tendered for inspection, if after inspection of

such portion thereof as "he may in his discretion think fit, he is satisfied that the

same is unsatisfactory.

(iv) the Inspecting Officer's decision as regards the rejection shall be final and binding

on the Contractor.

1400. Charges for Work Necessary for Completion of the Contract-

The Contractor shall pay all charges for handling, stamping, painting, marking, protecting or

preserving patent rights, drawings, templates, models and gauges and for all such measures as

the Purchaser or the Inspecting Officer may deem necessary for the proper completion of the

contract, though special provision therefore may not be made in the specification of drawings.

1500. Responsibility of the Contractor for Executing the Contract.

1501. Risk in the Stores- The Contractor shall perform the contract in all respects in accordance

with the terms and conditions thereof. The stores and every constituent part thereof, whether in

the possession or control of the Contractor, his agents or servants or a carrier, or in the joint

possession of the Contractor, his agents or servants and the Purchaser, his agents or servants,

shall remain in every respect at the risk of the Contractor, until their actual delivery to the

consignee at the stipulated place or destination or, where so provided in the acceptance of tender,

until their delivery to a person specified in the contract as interim consignee for the purpose of

despatch to the consignee. The Contractor shall be responsible for all loss, destruction, damage

or deterioration of or to the stores from any cause whatsoever while the stores after approval by

the Inspecting Officer are awaiting despatch or delivery or are in the course of transit from the

Contractor to the consignee or, as the case may be, interim consignee. The Contractor shall alone

be entitled and responsible to make claims against a Railway Administration or other carrier in

respect of non-delivery, short delivery, mis-delivery, loss, destruction, damage or deterioration of

the goods entrusted to such carrier by the Contractor for transmission to the consignee or the

interim consignee as the case may be.

1502. Consignee’s Right of Rejection – Notwithstanding any approval which the Inspecting

Officer may have given in respect of the stores or any materials or other particulars or the work or

workmanship involved in the performance of the contract (whether with or without any test carried

out by the Contractor or the Inspecting Officer or under the direction of the Inspecting Officer) and

not with standing delivery of the stores where so provided to the interim consignee, it shall be

lawful for the consignee, on behalf of the Purchaser, to reject the stores or any part, portion or

consignment thereof within a reasonable time after actual delivery thereof to him at the place or

destination specified in the contract if such stores or part, portion or consignment thereof is not in

all respects in conformity with the terms and conditions of the contract whether on account of any

loss, deterioration or damage before despatch or delivery or during transit or otherwise howsoever.

Note- In respect of materials pre-inspected at the firm's premises the consignee will issue

rejection advice within 90 days from the date of receipt.

Read and Accepted

Signature of Tenderer

25

1503. Provided that where, under the terms of the contract the stores are required to be delivered

to an interim consignee for the purpose of despatch to the consignee, the stores shall be at the

Purchaser's risk after their delivery to the interim consignee, but nevertheless it shall be lawful for

the consignee on behalf of the Purchaser to reject the stores or any part, portion of consignment

thereof upon their actual delivery to him at the destination if they are not in all respects in

conformity with the terms and conditions of contract except where they have been damaged or

have deteriorated in the course of transit or otherwise after their delivery to the interim consignee.

1504. The provisions contained in Clause 2200 relating to the removal of stores rejected by the

Inspecting Officer shall mutatis mutandis apply to stores rejected by the consignee as herein

provided.

Note- In respect of stores inspected during manufacture or before delivery or despatch at

contractor's premises the consignee will issue communication of rejection within 90 days from the

date of actual delivery thereof.

1505. Subletting and Assignment- The Contractor shall not, save with the previous consent in

writing of the Purchaser, sublet, transfer or assign the contract or any part thereof or interest

therein or benefit or advantage thereof any manner whatsoever.

In the event of the Contractor's subletting or assigning this contract or any part

thereof without such permission, the Purchaser shall be entitled to cancel the contract and to

purchase the stores elsewhere on the Contractor's account and risk and the Contractor shall be

liable for any loss or damage which the Purchaser may sustain in consequence or arising out of

such purpose.

1506. Changes in a Firm :-

(a) Where the Contractor is a partnership firm, a new partner shall not be introduced in

the firm except with the previous consent in writing of the Purchaser, which may be granted only

upon execution of a written undertaking by the new partner to perform the contract and accept all

liabilities incurred by the firm under the contract prior to the date of such undertaking.

(b) On the death or retirement of any partner of the Contractor firm before complete

performance of the contract, the Purchaser may, at his option, cancel the contract and in such

case the Contractor shall have no claim whatsoever to compensation against the Purchaser.

(c) If the contract is not determined as provided in Sub-clause (b) above notwithstanding

the retirement of a partner from the firm he shall continue to be liable under the contract for acts of

the firm until a copy of the public notice given by him under Section 32 of the Partnership Act, has

been sent by him to the Purchaser by registered post acknowledgement due.

(d) Consequence of breach - Should a partner in the Contractor firm commit a breach of

Sub-clause 1505 above or the Contractor should commit a breach of the conditions 1506(a) of this

Sub-clause, it shall be lawful for the Purchaser to cancel the contract and purchase or authorize

the purchase of the stores at the risk and cost of the Contractor and in that event the provisions of

Clauses 0600 and 0700 as far as applicable shall apply.

(e) The decision of the Purchaser as to any matter or thing concerning or arising out of this

sub-clause or on any question whether the Contractor or any partner of the Contractor firm has

committed a breach of any of the conditions in this sub-clause contained shall be final and binding

on the Contractor.

1507. Assistance to the Contractor:-

(a) The Contractor shall be solely responsible to procure any material or obtain any import

or other licence or permit required for the fulfilment of the contract and the grant by the Purchaser

or any other authority of a quota certificate or permit required under any law for distribution or

acquisition of iron and steel or any other commodity or any other form of assistance in the

procurement of the material aforesaid or any attempt to render assistance in the matter aforesaid,

Read and Accepted

Signature of Tenderer

26

or shall not be construed as a representation on the part of the Purchaser that the material

covered by such licence or permit or quota certificate is available or constitute any promise,

undertaking or assurance on the part of the Purchaser regarding the procurement of the same or

effect any variation in the rights and liabilities of the parties under the contract. But, if by reason of

any such assistance as aforesaid, the Contractor obtains any materials at less than their market

price or the cost of production of the stores is lowered the price of the stores payable under the

contract shall be reduced proportionately, and the extent of such reduction shall be determined by

the Purchaser whose decision shall be final and binding on the Contractor.

(b) Every effort made by the Purchaser to supply, or give assistance in the procurement of

materials, whether from the Government stock or by purchase under a permit or release order

issued by or on behalf of or under authority from Government or by any officer empowered in that

behalf by law or under other arrangements made by the Purchaser shall be deemed to be subject

to the condition that it will be performed with due regard to the other demands and only if it is found

practicable to do so within the stipulated time and the decision of the Purchaser whether it was

practicable to supply or give assistance as aforesaid or not shall be final and binding on the

Contractor.

1600. Use of Raw Materials secured with Government Assistance.

1601. (a) Where any raw material is procured for the execution of a contract with the assistance

of the Government rendered in the form of permit, or licence or quota certificate/essentiality

certificate or release order issued by or on behalf of or under the authority of the Government or by

an officer empowered in that behalf, or

(b) where the raw material is issued to the Contractor from Government stock, or

(c) where advance payments are made to the Contractor to enable him to purchase

the raw material, or

(d) Where raw material is arranged by the Government, the Contractor :-

(i) shall hold such material as trustee for the Government,

(ii) Shall use such material economically and solely for the purpose of the

contract.

(iii) shall not dispose of the same without the previous permission in

writing of the Purchaser, and

(iv) shall render due account of such material and return to the

Government at such place as the purchser may direct all surplus or unserviceable

material that may be left after the completion of the contract or its termination for

any reason whatsoever.

On returning such material, the Contractor shall be entitled to such price therefor

as the Purchaser may fix, having regard to the condition of such material.

1602. Where the contract is terminated due to any default on the part of the Contractor, the

Contractor shall pay all transport charges incurred for returning any material up to such destination

as may be determined by the Purchaser and the decision of the Purchaser in that behalf shall be

final and binding on the Contractor.

1603. If the Contractor commits breach of any of the conditions in this clause specified, he shall,

without prejudice to any other liability, penal or otherwise, be liable to account to the Government

for all moneys, advantages or profits accruing from or which, in the usual course, would have

accrued to him by reason of such breach.

1604. Where the stores manufactured or fabricated by the Contractor out of the material arranged

or procured by or on behalf of the Government are rejected, the Contractor shall, without prejudice

to any other right or remedy of the Government, pay to the Government, on demand, the cost price

or market value of all such materials whichever is greater.

Read and Accepted

Signature of Tenderer

27

1700. Indemnity.

1701. The Contractor shall at all times indemnify the Purchaser against all claims which may be

made in respect of the stores for infringement of any right protected by patent, registration of

designs or trade mark. Provided always that in the event of any claim in respect of alleged breach

of letters patent, registered designs or trade mark being made against the Purchaser, the

Purchaser shall notify the Contractor of the same and the Contractor shall, at his own expense,

either settle any such dispute or conduct any litigation that may arise there from.

1702. The Contractor shall not be liable for payment of any royalty, licence fee or other expenses

in respect of or for making use of patents or designs with respect to which he is according to the

terms of the contract, to be treated as an agent of the Government for the purpose of making use

of patent or trade mark for fulfilment of the contract.

1800. Packing.

1801. The Contractor shall pack at his own cost the stores sufficiently and properly for transit by

rail/road, air and/or sea as provided in the contract so as to ensure their being free from loss or

damage on arrival at their destination.

1802. Unless otherwise, provided in the contract all containers (including packing cases, boxes,

tins, drums and wrappings) in which the stores are supplied by the contractor, shall be considered

as non-returnable and their cost as having been included in the contract price.

1803. If the contract provides that the containers shall be returnable, they must be marked

“ Returnable ” and they will be returned to the Contractor as per terms of the contract.

1804. If the contract provides that returnable containers shall be separately charged, they shall be

invoiced by the Contractor at the price specified in acceptance of tender. In such cases, the

Contractor shall give full credit for the invoiced amount if the containers are returned to the

Contractor. Return of containers shall be made within a reasonable time and in the event of any

dispute or difference arising as to whether the containers were so returned, the decision of the

Purchaser thereon shall be final and binding and the Purchaser may, in his discretion award, such

compensations as may in his opinion be proper for any undue delay in returning the containers.

1805. Each bale or package delivered under the contract shall be marked by the Contract or at his

own expense. Such marking shall be distinct (all previous irrelevant marking being carefully

obliterated) and shall clearly indicate the description and quantity of the stores, the name and

address of the Consignee, the gross weight of the package and the name of the Contractor with a

distinctive number or mark sufficient for the purpose of identification. All markings shall be carried

out with such material as may be found satisfactory by the Inspecting Officer as regards quickness

of drying, fastness and indelibility.

1806. The Inspecting Officer may reject the stores if the stores are not packed/or marked as

aforesaid and in case where the packing materials are separately prescribed, if such materials are

not in accordance with the terms of the contract. Such rejection of the stores by the Inspecting

Officer shall be final and binding on the Contractor.

1807. Each bale or package shall contain a packing note specifying the name and address of the

Contractor, the number and date of the acceptance of tender or supply order and the designation

of the Purchase Officer issuing the supply order, the description of the stores and the quantity

contained in such bale or package.

1900. Notification of Delivery.

Notification of delivery or despatch in regard to each and every instalment shall be made

to the consignee and to the indentor immediately on despatch or delivery. The Contractor shall

further supply to the consignee, or the interim consignee, as the case may be, a packing account

Quoting number of the acceptance of tender and/or supply or repeat and date of despatch of the

stores. All packages, containers, bundles and loose materials part of each and every instalment

Read and Accepted

Signature of Tenderer

28

shall be fully described in the packing account and full details of the contents of the packages and

quantity of materials shall be given to enable the consignee to check the stores on arrival at

destination. The Railway Receipt/Consignment Note or Bill of Lading, if any, shall be forwarded to

the consignee by registered post immediately on the despatch of stores. The Contractor shall bear

and reimburse to the Purchaser demurrage charges, if any, paid by reason of delay on the part of

the Contractor in forwarding the Railway Receipt, Consignment Note or Bill of Lading.

2000. Progress Reports.

2001. The Contractor shall from time-to-time, render such reports concerning the progress of the

contract and/or supply of the stores in such form as may be required by the Purchaser.

2002. The submission, receipt and acceptance of such reports shall not prejudice the rights of the

Purchaser under the contract, nor shall operate as an estoppel against Purchaser merely by

reason of the fact that he has not taken notice of/or subjected to test any information contained in

such report.

2100. Freight.

The stores shall be despatched at public tariff rates. In the case of f.o.r., station of despatch

contract, the stores shall be booked by the most economical route or most economical tariff

available at the time of despatch as the case may be. Failure to do so will render the Contractor

liable for any avoidable expenditure caused to the Purchaser. Where alternative routes exist, the

Purchaser shall, if called upon to do so, indicate the most economical route available, or name the

authority whose advice in the matter shall be taken and acted upon. If any advice of any such

authority is sought, his decision or advice in the matter shall be final and binding on the Contractor,

2200. Removal of Rejected Stores.

2201. On rejection of all stores submitted for inspection at a place other than the premises of the

Contractor, such stores shall be removed by the Contractor at his own cost subject as hereinafter

stipulated, within 21 days of the date of intimation of such rejection. If the concerned

communication is addressed and posted to the Contractor at the address mentioned in the

contract, it will be deemed to have been served on him at the time when such communication

would be in the course of ordinary post reach the Contractor. Provided that the Inspecting Officer

may call upon the Contractor to remove dangerous, infected or perishable stores within 48 hours

of the receipt of such communication and the decision of the Inspecting Officer in this behalf shall

be final in all respects. Provided further that where the price or part thereof has been paid, the

consignee is entitled without prejudice to his other rights to retain the rejected stores till the price

paid for such stores is refunded by the Contractor save that such retention shall not in any

circumstances be deemed to be acceptance of the stores or waiver of rejection thereon.

2202. All rejected stores shall in any event and circumstances remain and always be at the risk of

the Contractor immediately on such rejection. If such stores are not removed by the Contractor

within the periods aforementioned, the Inspection Officer may remove the rejected stores and

either return the same to the contractor at his risk and cost by such mode of transport as the

Purchaser or Inspecting Officer may decide, or dispose of such stores at the Contractor's risk and

on his account and retain such portion of the proceeds, if any from such disposal as may

necessary to recover any expense incurred in connection with such disposals (or any price

refundable as a consequence of such rejection). The Purchaser shall, in addition, be entitled to

recover from the Contractor ground rent/demurrage charges on the rejected stores after the expiry

of the time limit mentioned above.

2203. The stores that have been despatched by rail and rejected after arrival at destination may

be taken back by the Contractor either at the station where they were rejected or at the station

from which they were sent, after refunding the price paid for such stores and other charges

refundable as a consequence of such rejection. If the contract placed for delivery f o. r. station of

despatch, the Contractor shall pay the carriage charges on the rejected consignment at public tariff

rates from the station of despatch to the station where they are rejected. If the Contractor elects to

Read and Accepted

Signature of Tenderer

29

take back the goods at the station from which they were despatched, the goods shall in addition,

be booked back to him freight to pay at public tariff rates and at owner's risk. The Contractor shall

be liable to reimburse packing and incidental costs and charges incurred in such return or rejected

stores in addition to other charges refundable as a consequence of rejection. The goods shall

remain the property of the Contractor unless and until accepted by the Purchaser, after inspection.

2300. System of Payment.

2301. Unless otherwise agreed upon between the parties, payment for delivery of the stores will

be made on submission of bills in the prescribed form which may be obtained from the Purchase

Officer in accordance with the instructions given in the Acceptance of Tender, by a cheque or

demand draft on a branch of the Reserve Bank of India or State Bank of India transacting

government business as may be decided by the Purchaser.

2302. Payment for the stores or for each consignment thereof will be made to the Contractor on

submission of bills accompanied by required document in accordance with the following procedure

in contracts where such a facility to the Contractor has specifically been agreed to by the

Purchaser: -

(a) 95% payments for the stores or each consignment thereof will be made to the firms

against proof of inspection and despatch. The original railway receipt should be sent to

the Accounts Officer responsible for payment along with 95% bill advising the particulars

of despatch to the consignee. The Accounts Officer after passing the 95 % bill should

pass on the original railway receipt to the consignee for taking delivery of the consignment.

It should, however, be ensured that there is no delay in the Accounts Office transmitting

the original railway receipt to the consignee.

(b) The balance of 5% shall be paid on receipt of the stores or each consignment thereof in

accordance with the terms of the contract in good condition by the consignee, with a

certificate to that effect endorsed on the copy of the Inspection Note by the Consignee

which shall accompany the bill submitted by the Contractor.

(c) In the case of F.O.B. & C. & F. contract 95 per cent of the price will be paid on

presentation of shipping documents and inspection certificate and the remaining 5 per cent

on receipt of the stores in accordance with the terms of the contract in good condition by

the Consignee, and on producing the certificate of such receipt endorsed on one copy of

the Inspection Note by the Consignee, or alternatively at the Contractor's option, the full

value of the stores will be paid after inspection, on receipt of the consignment in

accordance with the terms of the contract in good condition by the Consignee and on

producing a certificate of such receipt endorsed on one copy of the Inspection Note.

2303. In all other contracts or in contracts where the Inspecting Officer also acts as the interim

consignee or where inspection is carried on by the Consignee himself at destination and in all

cases of local delivery full payment shall be made on submission of " Final 100 percent bill "

supported by the Inspection Certificates and consignee's receipt as aforesaid to the Accounts

Officer concerned.

Note-

(1) The system of 95 percent and 5 percent payment is not applicable to claims amounting to

Rs.1000/- or below. In such cases only a single bill for value should he submitted.

(2) In the case of Running Contracts, the system of payment will be similar to the above except

that payment would be 98 per cent and 2 per cent instead of 95 per cent and 5 per cent

specified above.

2400. Withholding and lien in respect of sums claimed.

2401. Whenever any claim or claims for payment of a sum of money arises out of or under the

contract against the Contractor, the Purchaser shall be entitled to withhold and also have a lien to

retain such sum or sums in whole or in part from the security, if any, deposited by the Contractor

Read and Accepted

Signature of Tenderer

30

and for the purpose aforesaid, the Purchaser shall be entitled to withhold the said cash security

deposit or the security, if any, furnished as the case may be and also have a lien over the same

pending finalisation or adjudication of any such claim. In the event of the security being insufficient

to cover the claimed amount or amounts or if no security has been taken from the Contractor, the

Purchaser shall be entitled to withhold and have lien to retain to the extent of the such claimed

amount or amounts referred to supra, from any sum or sums found payable or which at any timethereafter

may become payable to the Contractor under the same contract or any other contract

with the Purchaser or the Government pending finalisation or adjudication of any such claim.

It is an agreed term of the contract that the sum of money or moneys so withheld or

retained under the lien referred to above, by the Purchaser will be kept withheld or retained as

such by the Purchaser till the claim arising out of or under the contract is determined by the

Arbitrator (if the contract is governed by the arbitration clause) or by the competent court as

prescribed under clause 2703 hereinafter provided, as the case may be, and that the Contractor

will have no claim for interest or damages whatsoever on any account in respect of such

withholding or retention under the lien referred to supra and duly notified as' such to the

Contractor.

2402. For the purpose of Clause 2401, where the Contract or is a partnership firm or a limited

company, the Purchaser shall be entitled to withhold and also have a lien to retain towards such

claimed amount or amounts in whole or in part from any sum found payable to any partner/limited

company, as the case may be, whether in his individual capacity or otherwise.

2403. Lien in respect of Claims in other Contracts-

a) Any sum of money due and payable to the Contractor (including the security deposit

returnable to him) under the contract may withhold or retain by way of lien by the Purchaser or

Government against any claim of the Purchaser or Government in respect of payment of a sum of

money arising out of or under any other contract made by the Contractor with the Purchaser or

Government.

b) It is an agreed term of the contract that the sum of money so withheld or retained under

this clause by the Purchaser or Government will be kept withheld or retained as such by the

Purchaser or Government till his claim arising out of the same contract or any other contract is

either mutually settled or determined by the arbitrator, if the contract is governed by the arbitration

clause or by the competent court under Clause 2703 hereinafter provided, as the case may be,

and that the Contractor shall have no claim for interest or damages whatsoever on this account or

on any other ground in respect of any sum of money withheld or retained under this clause and

duly notified as such to the Contractor.

2500. Corrupt Practices.

2501. The Contractor shall not offer or give or agree to give to any person in the employment of

the Purchaser or working under the orders of the Purchaser any gift or consideration of any kind as

an inducement or reward for doing or forbearing to do or for having done or forborne to do any act

in relation to the obtaining or execution of the contract or any other contract with the Purchaser or

Government or for showing any favour or for bearing to show disfavour to any person in relation to

the contract or any other contract with the Purchaser or Government. Any breach of the aforesaid

condition by the Contractor, or any one employed by him or acting on his behalf (whether with or

without the knowledge of the Contractor) or the commission of any offence by the Contractor or by

any one employed by him or acting on his behalf under IX of the Indian Penal Code, 1860 or the

Prevention of Corruption Act, 1947 or any other act enacted for the prevention of corruption by

public servants shall entitle the Purchaser to cancel the contract and all or any other contracts with

the Contractor and to recover from the Contractor the amount of any loss arising from such

cancellation in accordance with the provisions of Clauses 0600 and 0700.

2502. Any dispute or difference in respect of either the interpretation effect or application or the

above condition or of the amount recoverable there under by the Purchaser from the Contractor,

shall be decided by the Purchaser, whose decision there on shall be final and binding on the

Contractor.

Read and Accepted

Signature of Tenderer

31

2600. Insolvency and Breach of Contract.

2601. The Purchaser may at any time, by notice in writing summarily determine the contract

without compensation to the Contractor in any of the following events, that is to say

(a) if the Contractor being an individual or if a firm, any partner thereof, shall at any time, be

adjudged insolvent or shall have a receiving order or order for administration of his estate

made against him or shall take any proceeding for composition under any Insolvency Act

for the time being in force or make any conveyance or assignment of his effects or enter

into any assignment or composition with his creditors or suspend payment or if the firm be

dissolved under the Partnership Act, or

(b) if the Contractor being a company is wound up voluntarily or by the order of a Court or a

Receiver, Liquidator or Manager on behalf of the Debenture-holders is appointed or

circumstances shall have arisen which entitle the Court or Debenture holders to appoint a

Receiver, Liquidator or Manager, or

(c) if the Contractor commits any breach of the contract not herein specifically provided for.

Provided always that such determination shall not prejudice any right of action or

remedy which shall have accrued or shall accrue there after to the Purchaser and provided also

the Contractor shall be liable to pay to the Purchaser for any extra expenditure he is thereby put to

and Contractor shall, under no circumstances, be entitled to any given on re-purchase.

2700. Laws governing the Contract.

2701. This contract shall be governed by the Laws of India for the time being in force.

2702. Irrespective of the place of delivery, the place of performance or place of payment under the

contract, the contract shall he deemed to have been made at the place from which the acceptance

of tender has been issued.

2703. Jurisdiction of courts- This Courts of the place from where the acceptance of tender has

been issued shall alone have jurisdiction to decide any dispute arising out of or in respect of the

contract.

2704. Marking of stores- The marking of the stores must comply with the requirements of the

laws relating to merchandise marks for the time being in force in India.

2705. Compliance with provisions of Contract Labour (Regulation and Abolition)

Act, 1970 :-

(1) The Contractor shall comply with the provisions of the Contract Labour (Regulation

and Abolition) Act, 1970 and the Contractor Labour (Regulation and Abolition)

Central Rules, 1971, as modified from time-to-time, wherever applicable and shall

also indemnify the Purchaser from and against any claims under the aforesaid Act

and the Rules.

(2) The Contractor shall obtain a valid license under the aforesaid Act as modified

from time-to-time before the commencement of the contract and continue to have

a valid license until the completion of the contract. Any failure to fulfill this

requirement shall attract the penal provisions of the contract arising out of the

resultant non-execution of the contract.

(3) The Contractor shall pay to labour employed by him directly or through Sub-

Contractors the wages as per provisions of the aforesaid Act and the Rules

wherever applicable. The Contractor, shall, notwithstanding the provisions of the

contract to the contrary, cause to be paid the wages to labour indirectly engaged

Read and Accepted

Signature of Tenderer

32

on the contract including any engaged by his Sub-Contractors in connection with

the said contract, as if the labour had been immediately employed by him.

(4) In respect of all labour directly or indirectly employed in the contract for

performance of the Contractor's part of the contract, the Contractor shall comply

with or cause to be complied with the provisions of the aforesaid Act and the

Rules wherever applicable.

(5) In every case in which, by virtue of the provisions of the aforesaid Act or the Rules,

the, Purchaser is obliged to pay any amount of wages to a workman employed by

the Contractor or his Sub-Contractor in execution of the contract or to incur any

expenditure in providing welfare and health amenities required to be provided

under the aforesaid Act and the Rules or to incur any expenditure on account of

the contingent liability of the Purchaser due to the Contractor's failure to fulfill his

statutory obligations under the aforesaid Act or the Rules the Purchaser will

recover from the Contractor, the amount of wages so paid or the amount of

expenditure so incurred, and without prejudice to the rights of the Purchaser under

Section 20, Sub-section (2) and Section 21, Sub-section (4) of the aforesaid Act,

the Purchaser shall be at liberty to recover such amount or part thereof by

deducting it from the security deposit and/or from any sum due by the Purchaser

to the Contractor whether under the contract or otherwise. The Purchaser shall

not be bound to contest any claim made against it under Sub-section(i) of Section

20 and Sub-section (4) of Section 21 of the aforesaid Act except on the written

request of the Contractor and upon his giving to the Purchaser fun security for all

costs for which the Purchaser might become liable in contesting such claim. The

decision of the Purchaser regarding the amount actually recoverable from the

Contractor as stated above, shall be final and binding on the Contractor.

2800. Headings.

The headings of conditions here to shall not affect the construction thereof.

2900. Arbitration.

(a) In the event of any question, dispute or difference arising under these conditions or any

special conditions of contract, or in connection with this contract (except as to any matters

the decision of which is specially provided for by these or the special conditions) the same

shall be referred to the sole arbitration of a Gazetted Railway Officer appointed to be the

arbitrator, by the General Manager in the case of contracts entered into by the Zonal

Railways and Production Units; by any Member of the Railway Board, in the case of

contracts entered into by the Railway Board and by the Head of the Organisation in

respect of contracts entered into by the other Organisations under the Ministry of

Railways. The Gazetted Railway Officer to be appointed as arbitrator however will not be

one of those who had an opportunity to deal with the matters to which the contract relates

or who in the course of their duties as railway servant have expressed views on all or any

of the matters under dispute or difference. The award of the arbitrator shall be final and

binding on the parties to this contract.

(b) In the event of the arbitrator dying, neglecting or refusing to act or resigning or being

unable to act for any reason, or his award being set aside by the court for any reason, it

shall be lawful for the authority appointing the arbitrator to appoint another arbitrator in

place of the outgoing arbitrator in the manner aforesaid.

(c) It is further a term of this contract that no person other than the person appointed by the

authority as aforesaid should act as arbitrator and that if for any reason that is not

possible, the matter is not to be referred to 'arbitration at all.

(d) The arbitrator may from time-to-time with the consent of all the parties to the contract

enlarge the time for making the award.

(e) Upon every and any such reference, the assessment of the cost incidental to the reference

and award respectively shall be in the discretion of the arbitrator.

(f) Subject as aforesaid, the Arbitration Act, 1940 and the rules there under and any statutory

modifications thereof for the time being in force shall be deemed to apply to the arbitration

proceedings under this clause.

Read and Accepted

Signature of Tenderer

33

(g) The venue of arbitration shall be the place from which the acceptance note is issued or

such other place as the arbitrator at his discretion may determine.

(h) In this clause the authority, to appoint the arbitrator includes, if there be no such authority,

the officer who is for the time being discharging the functions of that authority, whether in

addition to other functions or otherwise.

3000. Fall Clause. Deleted

3100. INSPECTION & REJECTION:-

Where under a contract the price payable is fixed on F.O.R. station of despatch basis, the

Contractor shall, if the consignee rejects the stores at destination be liable in addition to his other

liabilities, to reimburse to the Purchaser the freight paid by the Purchaser.

3101. Notification of Result of inspection.- Unless otherwise provided in the specification of

schedule, the examination of the stores will be made as soon as practicable after the same have

been submitted for inspection and the result of the examination will be notified to the Contractor.

3102. Inspection Notes.--On the stores being found acceptable by the inspecting Officer he shall

furnish the Contractor with necessary copies of Inspection Notes duly completed, for being

attached to the Contractor's bill in support thereof.

3200. Warranty/Guarantee-

3201. The Contractor/Seller hereby covenants that it is a condition of the contract that all

goods/stores/articles furnished to the Purchaser under this contract shall be of the highest grade

free of all defects and faults and of the best materials, quality, manufacture and workmanship

throughout and consistent with the established and generally accepted standards for materials of

the type ordered and in full conformity with the contract specification, drawing or sample, if any and

shall, if operable, operate properly.

3202. The Contractor also guarantees that the said goods/stores/articles would continue to

conform to the description and quality as aforesaid, for a period of 30 months after their delivery or

24 months from the date of placement in service whichever shall be sooner, and this warranty shall

survive notwithstanding the fact that the goods/stores/articles may have been inspected, accepted

and payment thereof made by the Purchaser.

3203. If during the aforesaid period, the said goods/stores/articles be discovered not to conform to

the description and quality aforesaid or have deteriorated, otherwise that by fair wear and tear the

decision of the Purchaser in that behalf being final and conclusive that the Purchaser will be

entitled to reject the said goods/stores/articles or such portions thereof as may be discovered not

to conform to the said description and quality. On such rejection, the goods/stores/articles will be

at the Seller's risk. If the Contractor/Seller so desires, the rejected goods may be taken over by

him or his agents for disposal such manner as he may deem fit within a period of 3 months from

the date of such rejection. At the expiry of the period, no claim whatsoever shall lie against the

Purchaser in respect of the said goods/stores/articles, which may be disposed of by the Purchaser

in such manner as he thinks fit. Without prejudice to the generality of the foregoing, all the

provisions in the Indian Railways Standard Conditions of Contract relating to the ‘rejection of

stores' and ‘failure' and 'termination' add and Clause 3100-02 above shall apply.

3204. The Contractor/Seller shall, if required, replace the goods or such portion there of as have

been rejected by the Purchaser, free of cost, at the ultimate destination, or at the option of the

Purchaser, the Contractor/Seller shall pay to the Purchaser, the value thereof at the contract price

and such other expenditure and damage as may arise by reason of the breach of the conditions

herein before specified. Nothing herein contained shall prejudice any other right of the Purchaser

in that behalf under this contract or -otherwise.

3300. Book Examination Clause-The Government reserves the right for 'Book Examination'

as follows: -

(i) The Contractor shall whenever called upon and requiring to produce or cause to be

produced for examination by any Government Officer duly authorised in that behalf, any

Read and Accepted

Signature of Tenderer

34

cost or other account book of account, voucher, receipt, letter, memorandum, paper or

writing or any copy of or extract from any such document and also furnish information any

way relating to such transaction and procedure before the duly authorised Government

Officer returns verified in such manner as may be required relating in any way to the

execution of this contract or relevant for verifying or ascertaining the cost of execution of

this contract (the decision of such Government Officer on the question of relevancy of any

document, information of return being final and binding on the parties).

The obligation imposed by this clause is without prejudice to the obligation of the

contractor under any statute, rules or orders shall be binding on the Contractor.

(ii) The Contractor shall, if the authorised Government Officer so requires (whether before or

after the prices have been finally fixed), afford facilities to the Government Officer

concerned to visit the Contractors works for the purpose of examining the processes of

manufacture and estimating or ascertaining the cost of production of the articles. If any

portion of the work be entrusted or carried out by a sub-contractor or any of its subsidiary

or allied firm or company, the authorised Government Officer shall have power to examine

all the relevant books of such sub-contractor or any subsidiary or allied firm or company

shall be open to his inspection as mentioned in clause (i).

(iii) If on such examination, it is established that the contracted price is in excess of the actual

cost plus reasonable margin of profit, the Purchaser shall have the right to reduce the

price and determine the amount to a reasonable level.

(iv) Where a contract provides for book examination clause, the Contractor or its agency is

bound to allow examination of its books within a period of 60 days from the date the notice

is received by the Contractor, or its agencies calling for the production of documents as

under clause (i) above. In the event of Contractor's or his agency's failure to do so, the

contract price would be reduced and determined according to the best judgement of the

Purchaser which would be final and binding on the Contractor and his agencies.

3400. Inspection at the Fag End of the Delivery Period-

In cases where only a portion of the stores ordered is tendered for inspection at the Fag end of the

delivery period and also in cases where inspection is not completed in respect of the portion of the

stores tendered for inspection during the delivery period, the Purchaser reserves the right to

cancel the balance quantity not tendered for inspection within the delivery period fixed in the

contractor the risk and expense of the Contractor without any further reference to him. If the

stores tendered for inspection during or at the fag end of the delivery period are not found

acceptable after carrying out the inspection, the purchaser is entitled to cancel the contract in

respect of the same at the risk and expense of the contractor. If, however, the stores tendered for

inspection are found acceptable, the Purchaser may grant an extension of the delivery period

subject to the following conditions: -

(a) The Purchaser has the right to recover from the contractor under the provision of clause

0702 (a) of I.R.S. Conditions of Contract liquidated damages on the stores which the

Contractor has failed to deliver within the period fixed for delivery.

(b) That no increase in price on account of any statutory increase in or fresh imposition of

Customs Duty, Excise Duty, Sales Tax on account of Foreign Exchange variation or on

account of any other tax or duty leviable in respect of stores specified in the contract which

takes place after the date of the delivery period stipulated in the contract shall be

admissible on such of the said stores as are delivered after the date of the delivery

stipulated in the contract.

(c) That not with standing any stipulation in the contract for increase in price on any other

ground no such increase which takes place after the date of the delivery stipulated in the

contract shall be admissible on such of the said stores as are delivered after the expiry of

the delivery period stipulated in the contract.

(d) But nevertheless, the Purchaser shall be entitled to the benefit fit of any decrease in price

on account of reduction in or remission of Custom Duty, Sales Tax or on account of

Read and Accepted

Signature of Tenderer

35

Foreign Exchange variation or on account of any other Tax or Duty or on other ground as

stipulated in the price variation, clause which takes place after the expiry of the date of

delivery period stipulated in the contract.

3401. The Contractor shall not despatch the Stores till such time as an extension in terms of para

3400 (a) to (d) above is granted by the Purchaser and accepted by the Contractor. If the stores

are despatched by the Contractor before an extension letter as aforesaid is issued by the

Purchaser and the same are accepted by the Consignee, the acceptance of the stores shall be

deemed to be subject to the conditions (a) to (d) mentioned in the paragraph 3400 above.

3402. In case where the entire quantity has not been tendered for inspection with in the delivery

period stipulated in the contract and the Purchaser chooses to grant an extension of the delivery

period the same would be subject to conditions (a) to (d) mentioned in the paragraph 3400 above.

3500. (ADDITIONAL) SPECIAL CONDITIONS:- (Vide Para 417-S)

These (special) conditions wherever they differ from the Invitation to Tender and Instruction to

Tenderers over ride the latter.

In addition to Standard Conditions of Contract, the following special conditions shall apply to

(Running) Contract: -

3600. Purpose of Contract and Parties to the Contract.

3601. The parties to the contract, which shall be deemed to be a "Running Contract" and which is

intended for the supply of the stores of the descriptions and approximately in the quantities set

forth in the contract during the period specified therein, shall be the Contractor of the one part and

the authorities named in the contract hereinafter called the Purchaser (which expression shall,

where the context so admits or implies, be deemed to include his successors and assigns) of the

other part. The quantities shown in the said Contract, are only approximate, and cannot be

guaranteed.

3602. The Purchaser may authorise any officer (who shall hereinafter be called Direct Demanding

Officer) at any time during the period of the contract, to place orders direct on the Contractor.

3603. AnyvariationofthiscontractshallnotbebindingonthePurchascrunlessoruntilsame is endorsed

on the contract or incorporated in a formal instrument in exchange of letters and signed by the

parties.

3700. Delivery.

3701. The Contractor shall as may be required by the Purchaser either deliver free or f.o.r or c.i.f.

at the place or places specified in the contract such quantifies of the stores detailed in the said

contract as may be ordered direct from the Contractor from time-to-time by the Purchaser or by the

Direct Demanding Officer. The Contractor shall deliver or despatch the full quantity of the stores

so ordered with in the period specified in the said contract.

3800. Increase or Decrease of Quantities: Deleted.

3900. Maintenance and Replacement of Stocks.

3901. To meet casual demands, the Contractor shall maintain at all time in stock (until 75per cent

of the requirements have been drawn), at the place (s) specified in the contract, the quantity

/quantities mentioned therein. All demands should be complied with immediately they are received

by the Contractor or within the period, if any, stipulated in individual orders. As soon as the

Contractor is called upon to effect supplies, he shall take action to replenish the guaranteed stocks

until such time as 75 percent of the total approximate requirement has been drawn and such

replenishment shall be completed with the period specified in the contract, after the receipt by the

Contractor of casual demands. Due notice will be given to the Contractor by the Direct Demanding

Read and Accepted

Signature of Tenderer

36

Officers or by the Purchaser, if any additional quantities over and above 75 per cent of the total

approximate requirements are required and Contractor shall then arrange stocks accordingly.

3902. The period for replenishment of stocks will be allowed only if the material is not in stock. If

the material is in stock, this Provision will be in operative even tough the guaranteed stock quantity

may have been supplied against the contract.

4000. Reporting Progress of Contract.

The Contractor shall, three calendar months before the termination of the contract or at

such intervals as may be specified in the contract, submit a report to the Purchaser stating the total

quantity of stores delivered or despatched under the contract.

4100. Special conditions where they differ from Standard Conditions override the latter.

*********

Read and Accepted

Signature of Tenderer

37

PROFORMA FOR BANK GUARANTEE TOWARDS EARNEST MONEY

To:

The President of India

Acting through

The Controller of Stores,

South Central Railway,

6th Floor, Rail Nilayam

Secunderabad – 500 071.

------------------------

In consideration of the President of India (hereinafter called " the Government ") having

agreed to accept from .......………………..………… (hereinafter called "the said

Tenderer(s)") earnest money in the form of Guarantee Bond, under the terms and conditions of

tender ……………………………….. dated …………………. in connection with

…………………………… (hereinafter called “the said Tender”) for the due observance by the said

Tenderer of the stipulation to keep the offer open for acceptance for a period of 120 days from

the date of opening of tenders, to execute an agreement within the time specified, to start work

within the period specified after notification of the acceptance of his/their tender and the deposit of

Earnest Money in cash or furnish fresh Bank Guarantee for the said amount as part of security for

the due and faithful fulfilment of the contract on acceptance of the tender on production of a Bank

Guarantee for Rs………………. (Rupees………………… …………………only), we,

……………………… ………………… Bank Ltd., do hereby undertake to pay on demand to the

Government, the sum of Rs ………… in the event of the said tender having incurred forfeiture of

Earnest Money/Security Deposit as aforesaid for the breach of any of the terms or conditions of

the stipulations aforesaid and contained in the said tender under an order of the authority

competent to invite tender.

We …… ……………. Bank Ltd. further agree that the guarantee herein contained shall remain in

full force and effect till the authority competent to invite the tender discharges the guarantee,

subject however that the Government shall have no right under this Bond after the expiry of one

year from the date of its execution and our liability under the bond shall be discharged if the

demand for payment is not made within this period, we,……………..…… Bank Ltd, lastly

undertake not to revoke this guarantee during its currency except with the previous consent of the

Government in writing.

Dated…………day of ……………………

For ……………………….Bank Ltd.

Read and Accepted

Signature of Tenderer

38

MODEL FORM OF BANK GUARANTEE BOND FOR SUBMISSION OF SECURITY DEPOSIT

To:

The President of India

Acting through

The Controller of Stores,

South Central Railway,

6th Floor, Rail Nilayam

Secunderabad – 500 071.

GUARANTEE BOND

In consideration of the President of India (hereinafter called “the Government”) having

agreed to exempt ------------------ (hereinafter called “the said Contractor(s)”) from the demand

under the terms and conditions of an Agreement dated --------------- made between ---------------and

----------------------for ------------------------------- (hereinafter called "the said Agreement"), of security

deposit for due fulfilment by the said Contractor (s) of the terms and conditions contained in the

said Agreement on production of a bank Guarantee for Rs ------------------- (Rupees --------------------

--------------------------------- only) we -------------------------------------

(Indicate the name of the bank) (Hereinafter referred to as "the Bank") at the request of --------------

---------------------------contractor(s) do hereby undertake to pay to the Government an amount not

exceeding Rs. ----------- against any loss or damage caused to or suffered or would be caused to or

suffered by the Government by reason of any breach by the said contractor(s) of any of the terms

or conditions contained in the said agreement.

2. We ------------------------------------------ do here by undertake to pay the amounts due and

(Indicate the name of the bank)

payable under this Guarantee without any demur, merely on a demand from the Government

stating that the amount claimed is due by way of loss or damages caused to or would be caused to

or suffered by the Government by reason of any breach by the said Contractor(s) of any of the

terms or conditions contained in the said Agreement or by reason of the Contractor(s) failure to

perform the said Agreement. Any such demand made on the Bank shall be conclusive as regards

the amount due and payable by the Bank under this Guarantee. However, our liability under this

Guarantee shall be restricted to an amount not exceeding Rs ----------------------------------.

3. We under take to pay to the Government any money so demanded notwithstanding any dispute

or disputes raised by the Contractor(s)/Supplier(s) in any suit or proceeding pending before any

Court or tribunal relating thereto our liability under this present being absolute and unequivocal.

The payment so made by us under this Bond shall be a valid discharge of our liability for

payment thereunder and the Contractor(s)/ Supplier(s) shall have no claim against us for making

such payment.

4. We ------------------------------------------ ------- further agree that the Guarantee herein

(Indicate the name of the bank)

contained shall remain in full force and effect during the period that would be taken for the

performance of the said Agreement and that it shall continue to be enforceable till all the dues of

the Government under or by virtue of the said Agreement have been fully paid and its claims

satisfied or discharged or till ------------------------------------------ (Office/Department) Ministry of --------

----------------------------- certifies that the terms and conditions of the said Agreement has been fully

and properly carried out by the said Contractor(s) and accordingly discharges this Guarantee.

Unless a demand or claim under this guarantee is made on us in writing on or before the -------------

-------------- we shall be discharged from all liability under this Guarantee thereafter.

5. We --------------------------------------------------- further agree with the Government

(Indicate the name of the bank)

that the Government shall have the fullest liberty without our consent and without affecting in any

manner our obligations hereunder to vary any of the terms and conditions of the said Agreement or

to extend time of performance by the said Contractor(s) from time to time or to postpone for any

Read and Accepted

Signature of Tenderer

39

time or from time to time any of the powers exercisable by the Government against the said

Contractor(s) and to forbear or enforce any of the terms and conditions relating to the said

Agreement and we shall not be relieved from our liability by reason of any such variation, or

extension being granted to the said Contractor(s) or for any forbearance, act or omission on the

part of the Government or any indulgence by the Government to the said Contractor(s) or by any

such matter or thing whatsoever which under the law relating to sureties would, but for this

provision, have effect of so relieving us.

6. This Guarantee will not be discharged due to the change in the constitution of the Bank or the

Contractor(s)/ Supplier(s).

7. We ---------------------------------------------lastly undertake not to revoke this Guarantee

(indicate the name of bank)

during its currency except with the previous consent of the Government in writing.

Date the --------------- day of -------- 20--

For ---------------------------------------

(indicate the name of Bank)

Read and Accepted

Signature of Tenderer

40

PROFORMA FOR WARRANTY GUARANTEE BOND

To

THE PRESIDENT OF INDIA

Acting through the Controller of Stores,

South Central Railway,

6th Floor, Rail Nilayam,

Secunderabad-500071

Sub: Guarantee No--------------for------------------- (Amount) Covering Machine(s) Serial No----------

------supplied to (Consignee/s) --------------------------------------

Ref: Contract No---------------dated----------------Placed on M/ s -----------------------

1. WHEREAS M/s ------------------------- one of our constituents, hereinafter called the

“Sellers” have agreed to sell to you (hereinafter referred to as the “ Government”) -------------- Nos.

of --------------------- (give description) as per contract No ------------- dated -------------- (hereinafter

called “the said contract”).

2. AND WHEREAS according to the terms of said contract, it has been stipulated that

payment of 10 per cent of the value of the stores would be made, provided that the Sellers

furnish to the Purchaser a Bank Guarantee from a recognised Bank, acceptable to the

Purchaser for 10 per cent of the value of the said contract, valid for a period covering in full

the Guarantee Period as per the Warranty clause of the said conditions of the contract,

being the conditions attached to and forming part of the said contract.

3. AND WHEREAS the Sellers have approached us to give the said Bank Guarantee on their

behalf in your favour for an amount representing 10 per cent of the value of the contract which you

have agreed to accept.

4. That in consideration of the promises and at the request, of the said Sellers, we hereby

irrevocably undertake and guarantee to pay to the Government of India or at such other place as

may be determined by you forthwith on demand and without any demur, any sum upto a maximum

amount of -------------- (Rs. ----------) representing 10 per cent of the value of the Stores despatched

under the said contract in case the Sellers make default in paying the said sum or make any

default in the performance observance or discharge of the guarantee contained in the said

contract.

5. We agree that the decision of the Government whether any default has occurred or has been

committed by the Sellers in the performance, observance or discharge of the guarantee aforesaid

shall be, conclusive and binding on us.

6. Government shall be at liberty, from time-to-time, to grant or allow extension of time or give

other indulgence to the said Sellers or to modify the terms and conditions of the contract with the

said Sellers without affecting or imparing this guarantee or our liability hereunder.

7. We undertake to pay to the Government any money so demanded notwithstanding any dispute

or disputes raised by the Sellers in any suit or proceeding pending before any Court or Tribunal

relating there to our liability under this present being absolute and unequivocal.

The payment so made by us under this bond shall be a valid discharge to our liability for

payment thereunder and the Sellers shall have no claim against us for making such payment.

8. This Bank guarantee comes in to force when the balance ten percent of the value of the stores

shipped per Vessel ------------- vide Bill of Lading No. --------------dated -------------- or R/ R No. --------

----------dated ------------------ (in the case of indigenous contracts) under the said contract, has been

paid and will remain in full force and effect up to -------------i.e. for ------ months counted from the

Read and Accepted

Signature of Tenderer

41

date of placing the stores in services, and shall continue to be enforceable for further six months i

e. upto ---------- (date), hereinafter called the said date.

9. This guarantee will not be discharged due to the change in the constitution of the Bank

or the Sellers

10. That no claim under this guarantee shall be entertained by us unless the same has been

preferred by the Government within the said date.

Date --------------- Signature --------------------------------

Place ------------- Printed Name ----------------------------

Witness ------------------------ ---------------------------------------------

(Designation)

(Banks common Seal)

Bid Document : Document Not available

Tech. Document : Document Not available

Sector : Railways

State : Andhra Pradesh

For further Information Contact:

Name : R.Govind Raju

E-Mail : cos@scr.railnet.gov.in

Phone Office : 040-27822619,040-27786326

Fax : 040-27825316

 

 

 
Copyright ©2007 HamaraShehar.com All Rights Reserved.
Domain Registration, Website Design, Website Hosting by HamaraShehar.com