Guntakal, Electrical Maintenance, Guntakal Division - Proposed Electrification of Staff Qrs. Type.III - 33 Units

Company

South Central Railway

Tender Date

12/07/2007

Published Date

Submission Date

8/27/2007 12:00:00 PM

Open Date

8/27/2007 12:30:00 PM

Work Name

Guntakal, Electrical Maintenance, Guntakal Division - Proposed Electrification of Staff Qrs. Type.III - 33 Units

Work Location

Guntakal Division

Address

Sr DEE Maintenance DRM Compound Guntakal division South Central Railway, Guntakal - 515801

Description

1

Note: The tenderer shall fill up proforma and sign and submit along with the offer

or else the offer will not be considered.

TENDERER’S INFORMATION

The tenderer shall furnish the following information:

1. Name of the Contractor & :

Full Address

(with proof of address)

(copy of the Voter’s card or House

Hold Card should be enclosed)

2. i. Electrical Contractors License No.

ii. Grade :

iii. Issued by :

iv. Valid up to :

3. For contact purpose

i. Mobile No. ii. Land Phone

a. Office :

b. Residence :

iii. E-Mail Address iv. Fax No. :

4. i. Bank Account Nos. :

ii. Name of the Bank with :

Address

iii. Code of the Bank :

(to arrange contractual payments

through Electronic Fund Transfer

System)

5. i. PAN No. :

ii. VAT No. :

6. Partnership deed should be enclosed, :

if it is not a proprietary firm.

7. License No., under contract labour :

(Regulation and Abolition Act 1970 or

Building and Other Construction Works

Act (BOCW) from Ministry of Labour,

if applicable. Specify the reasons if not

applicable. (copy should be enclosed).

8. EPF Code No. :

(Copy of Registration to be enclosed)

Station:

Date:

2

Tender Conditions:

1. Tender forms are not transferable and the cost of the tender form is not refundable.

No cash transactions will be entertained.

2. Original Computer Print of the Tender Documents down loaded from the website are

only accepted. Photocopies of down loaded Tenders Papers are liable for rejection.

Any changes / additions / deletions in the tender documents down loaded from

Website, will make the offer invalid and the railway will forfeit the earnest money

deposited by the tenderer.

3. The Earnest Money Deposit should be deposited in the shape of Demand Draft

drawn in favour of Senior Divisional Finance Manager/ South Central Railway/

Guntakal (OR) money receipt obtained from the Divisional Cashier/ Pay/ South

Central Railway/ Guntakal, the specified amount should be submitted along with

tender. This deposit is not acceptable in the form of Bank Guarantee. Tenders

without requisite EMD shall be summarily rejected.

4. If the stipulated day for opening of the tender happens to be a holiday, the tenders

will be opened on the next working day at the same time and venue.

5. The Railway reserves the right to discharge the tender without assigning the reasons.

6. Railway is not responsible for any printing mistakes in the tender notice. The

Tenderes should visit the Web site / Contact the undersigned office for clarification if

any.

7. Tenderers shall enclose all the requisite credentials such as Technical and Financial

documents to evaluate their offer.

i. Should submit Electrical Contractors Licence issued by State Electrical Licensing

Authority attested by a Gazetted Officer / State / Central Government to be

submitted along with the tender.

8. Electrical Contractors license either in the Name or the Firm / Managing Partner who

is authorised to sign the tender papers and delegation of powers should be

registered in favour of such Partner.

9. If the rate quoted by tenderer exceeds Rs.10 Lakhs for the tender has to fulfil all other

conditions and submit the conditions.

3

Issued to:

________________________________ MCR No. ________________________________

________________________________ Date ________________________________

________________________________ Amount Rs. _______________________________

________________________________ Issued by DCP/SS/BO ______________________

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

SOUTH CENTRAL RAILWAY

ELECTRICAL WORKS CONTRACT

REGULATIONS FOR TENDERS & CONTRACTS

CONDITIONS OF TENDER

TENDER AGREEMENT FORM

SCHEDULE OF RATES & QUANTITIES

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Tender Notice No. G/E. 14/2007-2008 Dated: 12-07-2007

Name of the work:

Guntakal Division - Proposed Electrification of Staff Qrs. Type.III - 33 Units at 08

Stations. Viz; GTL - 16 units, GY - 06 units, TU - 02 units, KDP - 02 units, HX - 04

units, MOO - 01 unit, YA - 01 unit, KSN - 01 unit.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Case File No : G/E.29/I/608

Approximate Cost of Work : Rs. 5,34,666/-

Earnest Money Deposit : Rs.10,700/-

E.M.D. to be drawn in favour of : Sr. Divisional Finance Manager,

South Central Railway, Guntakal

Submission of Tenders : From 21-08-2007 to 27-08-2007

Due Date for submission of Tenders : Up to 12-00 Hrs on 27-08-2007

Time & Date of Opening of Tenders : At 12:30 Hrs on 27-08-2007 @ Tender

opening Hall / Divisional Railway Manager’s

Office Compound, Guntakal.

Completion Period : 120 days for above work from the date of

issue Acceptance letter .

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Guntakal Division

Divisional Railway Manager's Office, Office Supdt. [Electrical]

Electrical Branch, S.C.Rly., Guntakal.

Guntakal.

4

I n d e x

Sl.No. Description

1. Tender Form

2. Agreement for works

3. General Instructions to the Tenderer

4. General condition of Contract – I

5. General condition of Contract – II

6. Special condition of contract

7. Eligibility Criteria for Tenders

8. Details of the Work

9. Schedule-B

10. Schedule-C

11. Drawing

5

TENDER FORM

The President of India,

acting through the Divisional Railway Manager/Electrical,

South Central Railway, Guntakal.

1) I/We __________________________ _____________________________________

have read the various conditions to tender attached hereto and hereby agree to

abide by the said conditions. I/We also agree to keep this Tender open for

acceptance for a period of 90 (NINETY) DAYS from the date fixed for opening the

same and in default thereof, I/We will be liable for forfeiture of my/our Earnest Money

Deposit/ Security DEPOSIT. I/We offer to do the work ________________________

_______________________________ ____________________________________

_______________________________ ____________________________________

_______________________________ ____________________________________

at the rates quoted by me/us in respect of the Schedule attached and hereby bind

myself / ourselves to complete the work in _____ days period from the date of issue

of letter of Acceptance of the Tender. I/We also hereby agree to abide by the General

and Special conditions for the present Contract and to carry out the works according

to the specifications for materials and works laid down by the South Central Railway

2) A sum of Rs._____________ is herewith forwarded as Earnest money in addition to

the sum of Rs.______________ as a Security Deposit mentioned above. The full

value of the Earnest Money shall stand forfeited without prejudice to any other rights

or remedies if:

a. I/We do not execute the contract documents within fourteen days after receipt of

Notice issued by the Railway that such documents are ready, (OR)

b. I/We do not commence the work within 7 days after receipt of orders to that effect.

3) Until a formal agreement is prepared and executed, acceptance of this Tender shall

constitute a binding contract between us subject to modifications, as may be mutually

agreed to between us and indicate in the letter of acceptance of my/our for this work.

Date Signature of Contractor

Address

ACCEPTANCE OF TENDER

I accept the Tender and agree to pay the rates as shown in the Schedule:

Divisional Railway Manager / Electrical

South Central Railway, Guntakal

for & on behalf of the President of India.

6

AGREEMENT FOR WORKS

Contract Agreement No. G/E. ____/Elec/____ /200 - 200__ of ____/____/____.

1. Articles of Agreement made this __________________ Day of _______________

Two thousand and __________________________________, between the

President of India acting through the Divisional Railway Manager / Electrical, South

Central Railway, Guntakal (herein after called the ‘Railway’ which expression shall,

unless the context does not so admit include his successors and assignees in Office)

of the one part and M/s / Sri _____________________________________________

(hereinafter called the ‘Contractor' which expression shall unless excluded by the

context include his heirs, executors, administrators, successors and assignees) of

the other part.

2. WHEREAS THE Contractor has agreed with the Railway for the performance of the

work ______________________________ ________________________________

__________________________________ _________________________________

set forth in the Schedule hereto annexed up on the General conditions of Contract

and the specifications of the South Central Railway and the Special conditions and

special specifications, if any, and, in conformity with the drawings hereto annexed, if

any. AND WHEREAS the performance of the said works is in an act in which the

public are interested.

3. WHEREAS the balance Rs._______ in the Security Deposit of Rs.___________ after

adjustment of Earnest money deposit of Rs._________ originally by the Contractor

paid vide _________ bearing No. ______________ issued by ________________

as Security Deposit, now the Contractor has paid @ 10% of Contractors CC bill

amount till the SD is fully recovered..

4. The Contractor has furnished performance guarantee amount of Rs. _________ vide

_______________ bearing No. _____________ issued by ____________. Thus the

PG is fully recovered.

5. NOW THIS INDENTURE WITNESSETH that in consideration of the payments to be

made by the Railway, the contractor will duly perform the said works in the said

schedule set forth and shall execute the same with great promptness, care and

accuracy with good workmanship to the satisfaction of the Railway and will complete

the same in accordance with the said specifications said Drawings and said

conditions of contract within ______ days from the date of issue of letter of

acceptance No. G/E.29/I/______ dated _____________ on or before ___________,

and will guarantee / maintain the said works for a period of twelve calendar months

from the certified date of the completion and will observe, fulfill and keep all the

conditions therein mentioned, (which shall be deemed and taken to be part of this

contract as if the same has been fully set forth herein), and the Railway doth hereby

agree that if the contractor shall duly perform the said works in the manner aforesaid

and observe and keep the said terms and conditions, the Railway will pay or cause to

be paid to the Contractor for the said works on the final completion thereof the

amount due in respect thereof at the rates specified in the schedule hereto annexed

for a total amount of Rs.__________________.

7

6. The Railways reserves the right to appropriate the Security Deposit required in the

terms and conditions of the tender against non-fulfilment of the contract without

prejudice to any other rights or remedies. The Security Deposit will be with held by

the Railway until the expiry of the aforesaid guarantee / maintenance period.

7. It is hereby agreed and declared that all the provisions of the said specifications,

conditions of contract which have been carefully read and understood by the

contractor and the schedule of Rates, including the General Instructions contained in

this Tender document thereof shall be as binding upon the contractor and upon the

Railway as if the same had been repeated herein and shall be read as part of these

presents

8. In witness thereof the parties hereunto have set their hands the say and the year first

above written.

Divisional Railway Manager / Electrical Signed by the Contractor

South Central Railway / Guntakal Address:

For and on behalf of the President of India.

8

GENERAL INSTRUCTIONS TO TENDERERS

1. The president of India invites open Tenders, through Divisional Railway Manager

(Electrical), South Central Railway, Guntakal for the above work detailed in the

tender document.

2. Sealed tenders will be received by Divisional Railway Manager (Electrical)

S.C.Railway, Guntakal up to 12-00 hours on ________________ and will be opened

at 12-30 hours on the same day.

3. The Tenders must be accompanied with the standard Tender schedules duly filled in

and signed complete with Technical details, Drawings, description, literature etc.,

without which no tender will be considered. Complete tender documents shall be

submitted duly singed in each page.

4. The rate quoted must be firm and subject to fluctuations No taxes will be paid by the

Railways due to fluctuation etc., at later date.

5. The Tenderer shall keep the offer open for a period of 90 days from the date of

opening of the tender within which period the Tenderer cannot withdraw his offer. If

required the period may be extended further, by mutual Agreement from time to time.

Any contravention of the above condition will make the Tenderer liable for forfeiture

of his Earnest Money Deposit.

6. The President of India is not bound to accept the Lowest offer not assign the reason

for doing so and the President of India reserves the right to accept any Tender in

respect of the whole or any portion of the item specified.

7. A sum of Rs.____________/- as earnest money must be deposited with the

Divisional Cashier (Pay), South Central Railway, GUNTAKAL without which the

Tender will not be considered. This Deposit shall be made either in cash receipt or in

the shape of demand draft drawn in favour of Sr. Divisional Finance Manager /

S.C.Rly. / Guntakal, No interest will be allowed on this Deposit and the President of

India reserves the right to confiscate this Deposit should be successful tenderer fail

to put in the Security Deposit required by the terms and conditions of the Tender.

Tenders, unaccompanied by Earnest Money will be summarily rejected.

8. No alternation in the rates specified in the Tender shall be allowed unless it has been

initialled by the Tenderer before the submission of the Tender. The rates shall be in

figures and words.

9. Any deviation if necessary from the attached schedule of requirements will be

adjusted by mutual agreement.

10. The work shall be completed within _________ days from the date of issue of

acceptance letter.

11. The tenderer shall be required to visit the site, by prior appointment with the

authorised Representative of Divisional Railway Manager (Electrical), South Central

Railway, Guntakal and as certain himself regarding the local conditions storage

facilities, extent of work and other limitations. The tenderer should also aware of the

Rules mentioned in the Railways general condition of contract.

9

12. In all matters of dispute, the decision of the General Manager (Electrical) South

Central Railway / Secunderabad, shall be final and binding.

13. Tender should be submitted for the entire work.

14. No free passes will be issued by the Administration to the Contractor.

15. The submission of the Tender will be deemed to imply that this memorandum and all

documents enclosed have been studied and understood and that the Tenderer is

aware of the full scope of the work to be done.

16. The Tenderer shall have to execute all agreement with the Railways for executing the

work as tendered and accepted by Railways.

17. If the Tenderer deliberately gives wrong information in this Tender for the acceptance

of the Tender, the Railways reserves the right to reject such Tender at any stage.

18. No unsealed tender will be accepted.

19. Tenderer should submit the authorisation letter from the principal in original allowing

him to quote for this particular tender, along with the tender that, they are authorised

stockists/dealer for the approved brands mentioned in the tender, otherwise his

tender will be disqualified.

20. The contractor / Agency shall note that, the Contractors / Agency shall engage an

Engineering Graduate for the works costing Rs.15 lakhs and above and one qualified

Diploma Holder (over/seer) for the works costing more than Rs. 5 Lakhs and less

than Rs.15 Lakhs. If the contractor fails to employ the Technical staff as afore said,

he shall be liable to pay a reasonable amount not exceeding a sum of Rs.5000/-

(Rupees Five thousands only) for each month of default in case of Graduate

Engineer and Rs.3000/- (Rupees Three thousands only) for each month of default in

case of Diploma Holder (Over-seer).

The Contractor / Agency shall also notify to the department regarding the

engagement of a Graduate Engineer or Diploma Holder as the case may be with

their details.

10

SOUTH CENTRAL RAILWAY

GENERAL CONDITIONS OF CONTRACT

[ To be returned along with the Tender ]

The General condition of Contract governing the performance of the work covered by

this contract is the ‘General Conditions of Contract’ for the use in connection with Civil

Engineering works of South Central Railway as amended from time to time up to date.

A copy of the Book-let incorporating the above ‘General Conditions of Contract’ may

be pursued or purchased from the Office of Sr. Divisional Electrical Engineer, South Central

Railway, Guntakal.

As far as General Conditions of Contract of Electrical portion of work is concerned,

this may be pursued in the office of the Sr. Divisional Electrical Engineer, South Central

Railway, Guntakal.

In submitting this tender, it would be deemed that the tenderer has kept himself fully

informed of the provisions of the General Conditions of Contract including all corrections and

amendments issued up to the date of tender notice.

I / We have gone through the General conditions of contract governing the

performance of work covered by this Tender.

I / We have kept myself / our selves fully informed of the provisions of these general

conditions. In token of acceptance I / we ,am/are appending my/our signature below.

Signature of the Tenderer

11

GENERAL CONDITIONS OF CONTRACT

Definition of terms:

1. In constructions these General conditions specification annexure Schedules and

appending the following words shall be the meaning herein assigned them unless in

consistent with the tests.

a. The President shall mean the president of India and shall be deemed to included the

Chief Electrical Engineer/South Central Railway, Secunderabad for the time being

and officer deputed by him.

b. The Railway shall mean the South Central Railway.

c. The Chief Electrical Engineer shall mean the Chief Electrical Engineer, South Central

Railway, Secunderabad, as the officer appointed to supervise the work on behalf of

the president of India.

d. 'Supply' or 'supplies' shall means and includes the whole of the work to be done

executed carried out and the equipment and materials to be provided by

Contractor(s) under the contract in accordances with Schedule 'A'.

e. The sites shall mean the South Central Railway station and the surrounding area at.

Intimation:

2. The Contractor(s) must obtain in for himself/ themselves of his/ their own

responsibility and at his/ their own expenses all the information which may be

necessary for the purpose making a contract and for entering into a contract and

inspect the site of the work and equipment himself/ themselves with all works nature

of work and materials to the meet with and all matters pertaining thereto.

Quotation:

3. The Contractor(s) must quote his/ their rates with reference to each item and must

tender for all the items shown in the schedule. The cost column in all the said

schedule must be filled up in words and figures.

Quotation:

3. a. The tender shall keep the offer/open for minimum period of 90 days from the date of

opening of the Tender within which period the tenderer cannot with draw his offer

subject to the period being extended further if required by mutual agreement from

time to time. Any contravention of this will take the tender liable for forfeiting his

Earnest Money.

4. The duration of the contract is from the contract singed until the work is completed.

5. Up on the completion of the work, the president will pay the Contractor(s)at the

accepted rates in the schedule in the manner provided by clause 18 itself.

6. The drawing supplied will represent the form and dimensions of the work to be

carried out where any discrepancy exists between the dimensions as indicated by the

scale and dimensions marked in figures the figures are to be considered as correct

and are to be taken in all cases in preference to measurements by the scale given

and their should be any discrepancy between the figurers in the dimensions and

materials given in the description of work, scope of work schedule of requirements

and specifications, direction of the Chief Electrical Engineer shall be binding. Further,

anything contained in the drawing and not in the scope of work, schedule of

requirements and specifications, and not shown in the drawings, shall be equally

binding as if it was contained in both.

12

7. For the purpose of the execution of the contract, the contractor(s) shall arrange and

supply all the necessary materials and shall carryout the work with his/ their own

labour and supervision. He/ they shall also provide his their own auxiliary equipments

tools etc., at the site of work, except for Electric current at 230/ 440V single/ three

phases 50 cycles at the site of work, the contractor(s) shall not be given any other

assistance of any form by the Railways.

8. a. If the contractor(s) shall fail to execute the work, with due diligence and expenditure

or shall refuse, neglect or fail to comply with any others given to them by the Chief

Electrical Engineer, in accordance with the provisions of the conditions, the Chief

Electrical Engineer shall be at liberty to given notice in writing to the contractor to

make good the neglect, omission, failure, or breech/ compliance within a period to be

specified in such notice.

b. Any notice, by the Chief Electrical Engineer to the contractor(s) shall be deemed to

be duly served if given in writing addressed to the contractor(s) and delivered or sent

by registered post to the contractor(s) at their registered office address.

c. Should the contractor(s) fail to comply with any such notice within a period specified

as aforesaid the president shall be entitled to take the work of any portion of it out of

the contractor(s) and to re-contract with any other person or any other arrangements

for the completion of the work and may be use all or any of the materials tools, tackle

or other things which may then be the purpose of completing the work or any parts

thereof and promise any additional materials, tools or tackle required for the purpose.

The cost of execution any such work or providing any such materials shall be paid by

the contractor(s) to the president on demand or be deducted from any money due to

them by the president.

d. If the contractor failed to start the work within one month of signing the agreement,

his/their Security Deposit will be forfeited and the contract shall be cancelled.

e. The president may be determine and the contract at any time should stoppage of the

work become necessary, owning to want of funds or from any other cause,

whatsoever, in which the value of approved work done to date at the accepted

schedule-rates, will be paid in full and no claim shall lie against the president for

compensation for loss to the contractor due to orresing of the contract. The decision

of the president in this matter will be final.

EXTENSION OF TIME FOR EXECUTION OF WORK:

9. If such failure as aforesaid shall have arisen from any cause which the Chief

Electrical Engineer may admit as reasonable ground for extension of time the Chief

Electrical Engineer shall allow such additional time as he consider to be justified by

the circumstance of the case and shall from the whole/or such part as he may

consider reasonable of the claim for such loss / damage foresaid.

10. The work of supply, erection and maintenance shall for the purpose of all the

provisions of these conditions deemed to have been duly completed when the Chief

Electrical Engineer or any officer on his behalf shall be certified in writing that have

been completed in accordance with the contract conditions and such certificate shall

not be un-reasonable withheld not shall the Chief Electrical Engineer delay its issue

on account of commission or defects with in his opinion are minor but such issue

shall be with out prejudice to the contractor(s) liability to make good any such

commission and defects with the greatest possible expenditure.

13

Security Deposit.

11. The amount to be recovered from the progressive bills of the contractors at the rate

of 10 % till it reaches the required value.

Earnest money shall be held as Security deposit for the due and complete fulfilment

of the contract.

11 (a) Performance guarantee

Apart from the Security deposit, the contractor should furnish performance guarantee

in the form of an irrevocable Bank Guarantee / FDR amounting to 5% of the

contract value. The performance guarantee should be furnished before signing of

the agreement and should be valid up to the expiry of the maintenance period. The

P.G. shall be released after satisfactory completion of the work and maintenance

period is over. In the event of contractor(s) failing to make the deposit within the time

and in the manner aforesaid the Railway shall be entitled to cancel the contract and

forfeit the Earnest Money Deposited by the contractor(s) on or before the time on

submitting his/ their tender.

Sub-letting of the contract:

12. The contractor(s) shall not without the consent in writing of the Chief Electrical

Engineer, sub-let the contract or any part thereof. In the event of contractor(s)

subletting or assigning the contract, or any part thereof without such permission, the

Chief Electrical Engineer, Secunderabad shall be entitled to cancel the contract and

make arrangements for the execution of the work on the contract shall be liable for

any loss of damage which the Chief Electrical Engineer, Secunderabad may sustain

inconsequence of any arising out of such arrangements.

13. No Railway passes for the conveyance of labour by train and for the use of

contractor(s) or his / their agents be granted.

DAMAGES FOR DELAY IN COMPLIANCE:

14. If the contractor(s) fail to carry out, execute and complete the work-given to him /

them under this contract, the contractor(s) within the time, guaranteed by them / him

in schedule and without preference to the right of president under clause 8 of

contracts agreement to accept a reduction of Rs.50/- per day delay between the

appointed time and actual time for completing the work, under the terms of this

contract and such reduction shall be in the full satisfaction of the contractor or liability

for delay but shall not in any case exceed 25% of the contract value of the work.

15. The Contractor shall not alter any of the work without the sanction in writing from the

Chief Electrical Engineer, Secunderabad, but the president shall have full power to

alter amend, or otherwise vary any of the work without any way violating the contract

and the contractor(s) shall carry out all such alternations amendments or variations

and be found by the same conditions so far as applicable as though the said formed

part of the contract. The difference in cost if any due to such alterations amendments

variations shall be added to or deducted from the contract price as the case may

required. The president shall not become liable for the payment of any cheques in

respect of any such alterations, amendments to variations unless the order for

instructions or the performance of the same have been given in writing by the Chief

Electrical Engineer/ S.C.Rly./ Secunderanad. Sr. Divisional Electrical Engineer/ M/

S.C.Railway / Guntakal and until the same is endorsed in the Agreement and

incorporated in a formal instrument in and signed by the parties thereto.

14

Reasonability for damage to Railway property:

16. The contractor(s) shall be held responsible for all damages, which may be caused

done by him / them to the property of the president or to any person during the

execution, of such work.

17. The Chief Electrical Engineer, Secunderabad or his duly authorised deputes shall

have the power to inspect the work during the progress.

18. a. Terms of payment:- Please see clause No.12 of special conditions of contract unless

otherwise agree upon between the contractor and the purchaser payment will be

made by the Senior Divisional Finance Manager/ Guntakal.

b. The contractor shall make good any defects imperfections or faults or damages

caused due to defective workmen ship or due to a defective equipment, which may

appear or occur the maintenance period of 12 months at his own cost within 14 days

from the date of advise.

c. The maintenance period shall commence from the date of satisfactory, Completion of

the entire works as per contract, fusing of bulbs are however, not covered under this

Guarantee, The Security Deposit will be refunded if the contractor produces for

equipment amount which will be deposited with the Railway Administration for the

Maintenance period or One year.

Workmen Compensation:

19. Workmen compensation Act, Factory Act (including all the provision of same) and

payment of wages Act. The Contractor(s) shall keep the president at all times

indemnified and protected against all claims and liability that may be made under the

workmen's compensation Act, 1928, the factories Act 1948 and the rules made there

under from time to time.

20. Rents Right etc.:- The Contractor(s) shall keep the president fully and effectively

indemnified against all actions suits claims demands cost, charges and expenses

arising from or incurred by reasons of any infringement of any letters, patents

designs, trade mark of copy right of other protected right in respect of any machine

plant work, materials thing of system of method of using fixing working or

arrangements used fixed or supplied by the contractor All realities actual duties,

terminal and other payments which may have to be paid in respect of any such

machine, plant work materials thing, system or method as aforesaid (whether

payable in one sum or by installments or otherwise) are included in the contract price

and shall be payable the contractor.

In the event of any claims or demand being made or action or suit brought against

the President in respect of any such matter or matters as aforesaid the contractor(s)

shall be duly notified there of that settlement of such claims, or demands and for the

defence of any such action or suit subject if any so far as the President shall think

proper and expense of the Contractor(s) to his supervision and control by the

President through the Officer duly authorised in this behalf, or in connection with the

contract, whether during the period, they shall be responsible for all the negotiations.

15

21. The work shall be executed in all respects in the most and workmen are like manner

and to the entire satisfaction of the Chief Electrical Engineer who reject any work

which is his opinion be defective in quality or workmanship and any rejection also

shall be final and conclusive.

Insolvency or death:

22. Contractor(s) die or deemed a bankrupt or have a receiving order made against him /

them or make or enter into any arrangement or commitment with him their credit or

creditor or creditors suspend payment or being accompany a liquidation either

compulsorily or voluntarily the president shall have to the poor determines the

contractor and the Contractor(s)shall be liable for expenses loss or damage which

the president may incur reasons of the Contractor(s) shall be liable for expenses loss

or damage which the president may incur reasons of the contractor(s) default and

president shall retain and supply and sum which may be due to the contractor(s) for

payment of cost for completing the work.

Matter finally determined by the Railway:

23. All disputes and difference of anything whatever arising out of the progress of the

work, or after completion and whether before or after the work determination of the

contract, shall be referred to by the contractor to the Railway and the Railway shall

within a reasonable time after there. presentation make and notify decision a

classifications measurement drawing and certificates with respect to any matter,

special conditions, given specially provided for these or other Engineer on behalf of

the Railways are matters are referred to here in after as expected matters and shall

final and binding upon the contractor shall not be set aside on account of any

informity commission delay or error in receding in or about the same or any other

ground or for any other reasons and shall be without appeal.

Demand for arbitration:

23.1 In the event of any dispute of difference between the parties hereto as to the

construction or operation of this construction or their respective rights liability of the

parties on any matter in Question, dispute or difference on any account, or as to the

within holding by the Railway or any certificate to which the contractor may claim to

be entitled to the Railway fails to make a decision within a reasonable time, then and

in any such case, but except in any of the expected matter referred to in rule 23 of

these conditions, the contractor after 90 days of his presenting his final claim on

disputed matter may demand in writing that the dispute or difference by referred to

arbitration such demand for dispute of difference and not other shall be referred to

arbitration.

Obligation during pendency of:

23.2 Work under the contract shall unless otherwise directed by the Engineer continue

during the arbitration proceeding and no payment due for payable by the Railway

shall be withheld on account of such proceeding provided, however, it shall be upon

for the Arbitrator or arbitrator to consider and decide whether or not such work should

continue during arbitration proceedings.

3. a. Matter in Question of dispute of difference to be arbitrated upon shall be referred to

decision to.

Arbitration: A Sole arbitrator who shall be General Manager or a person nominated

by him is that behalf in case where the claim in question is below Rs.50,000/- and in

case where the issue involved are not of completed nature the General Manager

shall be the sole judge to decide whether or not the issue involved are of a

complicated nature.

16

ii. The arbitrators, who shall be Gazetted Railway Officers of equal status to be

appointed in the manner laid down in clause 3 (b) for all claims of Rs.50,000/- and

above for all claims.

Irrespective of the amount of value of such claims if the issue involved are of a

complicated nature. The General Manager shall be the sole judge to decide whether

the issues and of complicated nature or not in the event of the two arbitrators being

decided in their opinions, in the matter under dispute will be referred to an impute to

be appointed in the matter laid down in clause(s) for hid decision.

23.3.b. For the purpose of appointing two arbitrators are referred to sub clause (i) (iix) above

the Railway will send a panel for more than three names of Gazetted Railway officers

of the Railway to the Contractor who will be asked to suggest the General Manager

one name out of the list for appointment as the contractor's nominee will also appoint

a second arbitrator as so entering upon the reference, the two arbitrators shall

nominates an impure who shall be a Gazetted Railway Officer to whom the case will

be referred in the event of any difference between the two arbitrator.

23.3.c. If the sole arbitrators appointed under sub-clause (a) If the sole arbitrators appointed

under sub-clause (b) above resigned his appointment / resign their appointment or

vacates his office/vacate their offices or is/are unable or unwilling to act for any new

arbitrator / arbitrators to act in his/their place in accordance with the provision of subclause

(a)(1) - Sub-clause (b) above as the case may be such arbitrator / arbitrators

as the case may be shall be entitled to proceed with the reference from the stage at

which it was left by the previous arbitrator / arbitrators.

23.3.d. The Arbitrator or arbitrators and the umpire shall have power to call for such

evidence by way of affidavit or otherwise as the arbitrator or arbitrators of umpire

shall think proper and it shall be the duty of the parties thereto do or cause to be

done all such things as may be necessary to stage at which it was left by the

previous arbitrator / arbitrators. enable the arbitrator or arbitrators or umpire to make

the ward without any delay.

23.3.e. It will be no objection that the person approved as Arbitrator, arbitrators umpire the

Government servants. They have expressed the views on all any of the matter this

clause.

23.3.f. Subject, as aforesaid, Arbitration Act, 1940 and the rules there under and any

statutory modification there to shall apply the Arbitration proceedings under this

clause.

24. Any bribe, commission, Gift, or advantage gives / promised or offered by the or on

behalf of the contractor on parent / agent or servant or any on behalf of the contractor

on their behalf in relation to the obtaining or the execution of his or any other

contractor with the President shall in addition to any criminal liability he / they may

incur subject to the contractor(s) to cancellation of this and all other contractors with

the President and also to payment of any loss from such cancellation the President

shall be entitled to deduct to amounts to payable from any money otherwise due to

contractors under this or any other contractor, any Question of dispute as to the

commission of any offence under this clause shall be decided by the president in

such a manner and on which (X) decision shall be final (x) evidence or information as

he think and sufficient and his decision shall be final.

17

25. The Chief Electrical Engineer or his authorised representative shall have the right to

refuse Administration into the sites or any persons / employee by the contractor(s)

whom he may consider undesirable.

Claim against Contractor:

26. The president reserves the right to refuse right and is at liberty to set of against any

payment due to the contractor(s) of his contract amount of any other claim

whatsoever.

Surplus materials:

27. No surplus materials left over on completion of work against items or schedule will be

paid for by the Railway. The contractor shall remove all his / their plant and

equipment from the Railway premises within 15 days of termination of contract from

the site to the satisfaction of the Railway.

28. The Contractor shall exercise the greatest care, skill during the progress of

dismantling the existing equipment, which shall be done in the presence of and to the

entire satisfaction of any Authorised representative of the Chief Electrical Engineer.

He shall not hamper with there leased, materials and shall hand them over to the

authorised representative and shall fix up suitable dates and timing for these purpose

with the permission of the Chief Electrical Engineer.

29. The Contractor(s) shall carryout all necessary cutting away and making good for the

purpose of the contract of all wood works, walls, floors etc., of Railway buildings, the

contractor(s) shall be responsible and shall make good at his / their expenses to the

buildings which may be caused by the acts of commission of the contractor his

servants or against in connection with the contract. Commission of the contractor of

his servants of agents in connection with the contractor.

30. Observation to Rly. Staff:

Observations to Railway staff:- The Contractor(s) shall not obstruct the Railway staff

directly or indirectly and also the staff working on the Rly. system in any form.

31. Convenience to Railway Staff:

Injury to Railway Staff:- The Contractor shall at all times indemnify the president

against all claims made in respect of the injuries to the persons or public within the

Railway premises made by the contractor(s) his agents or servants during the terms

of contract.

32. Convenience to Railway Staff:

The Contractor(s) will note that in the residential of service building under occupation

they shall take all necessary precautions to avoid any inconveniences to occupants

or against damage to furniture and their property. More than one room may not be

available for completion of the work due leged shall be paid by him to this factor.

33. Subject as otherwise provided in this contract, all notices to be given on the behalf of

the president of India and all other action to be taken on his behalf may be given or

taken on his behalf by the Chief Electrical Engineer, S.C.Railway, Secunderabad.

Laws Governing the Contractor:

34. Laws governing the Contractor:- The Contract shall be governed by the laws of India

for the time being in force.

18

35. Should the Contractor has relative employed in the Electrical Department of the

Railways he must inform Chief Electrical Engineer, Secunderabad. Of the fact before

signing the agreement failing which is contract may be cancelled if the same

subsequently come to light and he shall be liable to make good any losses or

damage resulting in the case of cancellation under clause 8 A. and 32 A thereof.

36. The marginal notices are not part of the conditions.

37. The contractor shall submit along with final bills the information relating to the wages

paid his labourers in the execution of the works entrusted him.

38. Any individual or individual signing the tender or other document connected with the

contractor should specify whether he is signing.

1. A "Sole proprietor" of the firm or as his Attorney".

2. As "Partner " of the firm or as his "Attorney".

3. For the firm or pre-curretionesm.

In the case limited companies and firm registered under the India partnership etc.,

the capacity in which he is signing should be specified (b) Director managing

Director, Manager, Secretary, partner attorney as the case may be copy of the

document empowering the individuals to sign should be produced if required in the

case of unregistered firm all the partners or any attorney authorises by all of them of

duly authorised by the firm should sign the Tender and all other connected

documents.

39. a. Use of the raw materials secured with Govt. Assistance whether any way raw

materials for the execution of the contract are procured with the assistance of

Government either by issued from Government stocks or purchase under

arrangements made or permit or licence(s) issued by the Government the Contractor

shall hold the said materials economically and solely for purpose of the contract,

against which they are issued and not disposed of the materials without the purchase

all surplus or un-serviceable materials that may be left with him after the completion

of the contract or it is termination for any reason whatsoever on his being paid such

price as Govt. may fix with duly regard to the condition of the materials.

b. The fright charges for the return of the materials according to the directions of the

purchaser for all surplus or unserviceable materials that may be left within after the

completion of the contract of its termination for any reasons whatsoever on his being

paid such price as Govt. may fixed with due regard to the condition of materials. The

freight charges for the return of the materials according to the directions of the

purchaser shall be borned by the contractor, in the agent of the contract being

cancelled for any default on his part. The decision of the Govt. shall be final and

conclusive.

c. In the event of a breach of the aforesaid conditions the contractor shall in addition to

throwing himself open to action for contravention of terms of the licenses of the

permit(s) and or / for criminal breach for trust be liable to account to Govt. for all

moneys, advantages of profits resulting of which the usual course would resulted to

him by reason of such breach.

40. Contractor’s responsibility for discrepancy:

The ultimate responsibility for correct execution of work shall rest with the contractor

unless the Railway insists an option of his designs in spite of the contractor not being

agreeable to it.

19

41. Work to be done as approved:

i. The planning shall be finalised in consultation with the Railway and approved by

letter in writing before commencement of the work and the contractor shall be held

responsible for the execution of the work in full compliance with approved designs

and drawings. The tenderer’s scheme of work and time schedule shall be furnished

in the Tender.

ii. The contractor shall set out the work and be responsible for the same and amend at

his own cost and to the satisfaction of the Sr. Divisional Electrical Engineer,

Maintenance, Guntakal or his Executives, any errors which may arise.

iii. The contractor shall be responsible for all damages to property and for any injury or

loss caused to the work or workmen, to persons, animals or things in the course of

the work carried out by or under direction of the contractor or his agents.

42. Provisional acceptance:

On completion of the work in all respect the contractor can seek provisional

acceptance certificate for the work completed.

43. Guarantee:

The contractor shall guarantee satisfactory working of the installation, erection by him

for a period of twelve months from the date of commercial operation or from the date

of provisional acceptance by the purchaser whichever is earlier. During the period of

guarantee contractor shall keep available and attend to any defect and replace the

equipment / components resulting from defective erection or defects in the equipment

supplied by the contractor.

44. Indian Labour and Materials:

i. The tenderer shall utilise Indian labour including supervisory staff, for the execution

of this contract to the maximum possible extent.

ii. The tenderer shall be prepared on the basis that all the materials required to

complete the works including those indicated in Schedule-3 are procured from

indigenous sources in full.

45. Works to be done as approved:

The planning shall be finalised in consultation with the purchaser and approved by

the later in writing before commencement of the work and the contractor shall be held

responsible for the execution of the work in full compliance with the approved

designs and drawings. Designs and drawings modified at site by the purchaser’s,

engineers shall be treated as approved. However, such modifications shall be

incorporated in the designs and drawings and re-submitted for formal approval.

46. Monthly Progress Report:

The contractor shall furnish to the Sr. Divisional Electrical Engineer, South Central

Railway, Guntakal or his successor or nominee (whose address will be advised in

due course) during first week of every calendar month, a progress report showing

progress of finalisation of designs, drawings, materials and equipment received at

site and the works carried out during the preceding month and up-to-date progress of

these items along with the total quantum of designs and drawings, materials and

equipments and the works required for the contract.

20

47. INSPECTION:

Materials: All equipments, materials, fittings, and components will be subject to

inspection by the purchaser or his representative at the manufacturer’s factory before

despatch and no materials shall be despatched from the manufacturer’s factory until

these are inspected and /or approved. The materials may also be inspected by the

purchaser or his representative again at the contractor’s depot. The purchaser or his

representative shall have the right to be present during all stages of manufacture,

and shall be afforded, free of charge, all reasonable facilities for inspection and

testing so as to satisfy him self that the materials are in accordance with

specifications, approved drawings and designs. Any unreasonable delay in

inspection will be reasonable ground for extension of time for completion of the work.

Erection: All erection work will be subject to inspection by the Purchaser or his

representative to ensure that the work is done in accordance with the specification

and approved drawings.

Expenses of purchaser’s representative: All the expenses of the purchaser’s

representative shall be borne by the purchaser whether the inspected materials.

Inspection: The decision of the General Manager or his successor shall be final in

respect of acceptability or otherwise of any material fitting, component or equipment

required for the work.

Correctness of work and materials: The contractor shall be solely responsible for the

correctness of the positions, levels and dimensions of the works according to

approved drawings notwithstanding that he may have been assisted by the

purchaser or his men insetting out the same.

If any dimension figured upon a drawing differs from that obtained by scaling the

drawings the figured dimension should be normally taken as correct unless it is

porima facie a mistake. But all such cases shall be brought to the notice of the

Purchaser’s engineers and the discrepancy set right before execution.

48. Contractor’s responsibility for Discrepancies:

All design and drawings submitted by the contractor shall be based on a thorough

study and shall be such that the contractor is satisfied about their suitability. The

Purchaser’s approval will be based on these considerations. Not with standing

approval communicated by the purchaser, during the progress of the Contract. For

designs and drawings, prototype samples of components, materials, and

responsibility for correct design and execution of work shall rest with the Contractor

unless the Purchaser insists on adoption of his own designs in spite of the Contractor

not being agreeable to it.

The contractor shall be responsible for and shall bear and pay the costs for any

alteration of works arising from any discrepancies, errors or omissions in the designs

and drawings supplied by him, whether such designs and drawings have been

approved by the purchaser or not.

49. Insurance:

The Contractor shall take out and keep in force a policy or policies of insurance

against all liabilities of the Contractor orthe purchaser at common law under any

statute in respect of accidents to persons who shall be employed by the Contractor in

or about the site or the Contractor’s office for the purpose of carrying out the work at

site.

21

SPECIAL CONDITIONS OF CONTRACT

The following special conditions supplement the "Regulation for tenders and contract

conditions of tender, tender agreement form and general conditions of contract and

should be considered as part of contract paper, wherever the provisions of these

conditions are at variance with the "Regulations for, tender and contracts, conditions

of tender, tender agreement form and general conditions of Contract." the conditions

stipulated in his document shall only prevail upon.

1) The president of India, reserves the right to forfeit the entire Earnest Money Deposit,

should the successful tender fail to furnish the required security deposit as stipulated

in the conditions of tender civil engineering booklet containing regulations for tenders

and contract, conditions of tender agreement form and general conditions of contract.

2) Every effort has been made by the Railway to cover all the items required for

executing the work in the specifications to provide efficient and reliable power supply

arrangements at Railway area. These items have either been covered explicitly or

implicitly in the specification and the tender shall, however, provide free of cost, all

such items that may be required for proper execution commissioning and

performance of the equipments supplied and installed by them whether they are

mentioned explicitly or implicitly in the specification or not. No extra claim,

whatsoever will be entertained by the Railways for such items, so provided by the

contractor for proper execution of for ensuring satisfactory performance of the

installations provided by them under this contract.

3) The contractor shall set out the work and be responsible for the same and amend at

his own cost and to the satisfaction of the Senior Divisional Electrical Engineer/

Guntakal only errors that may through accurate setting out.

4) The tenderer whose tender is accepted shall be required to appear at the office of the

Sr.DEE/M/GTL in person/or if a firm or corporation, a duty authorised representative

shall so appear and execute the contract within 14 days notice after the contract has

been awarded to him. Failure to do so, shall constitute a breach of agreement

affected by the acceptance of the tender inwhich case the Earnest Money Deposit

accompanying the tender shall be forfeited by the Railway as liquidate for such

default.

5) In the event of any tenderer whose tender is accepted shall realise to execute the

contract documents as here infole provided, the Railway may determine that such

tender has abandoned the contract and there upon his tender and the acceptance

thereof shall be not all and avoid and the Railway shall be entitled to forfeit the

earnest money as liquidated for such defaults.

6) The number of equipment and the quantity of cabling indicated either in the drawings

in the schedule of prices requirements are only tentative and the Engineer at site. On

behalf of the Railway shall be entitled by order in writing to enlarge or extend

diminish or reduced the works or make any alterations in quantities to an extent of

25% of the total cost of the tender. In case the agreemental value goes beyond 25%,

for the first 15% increase in the value beyond 25% of agreemental value, the rates

will have a reduction of 2% in the incremental value of the agreement and for the

next 10% increase in the value, rates will have an additional reduction 2% in the

further incremental value of the agreement. Execution of quantities beyond (+)50% of

the overall agreemental value is not permitted. As such, the contractor shall quote

their rates per unit taking also into consideration and no variation in the rates quoted

shall been entertained at a later date, payments will be made on prorate basis.

22

b. For effecting reduction of rates incremental value shall be considered item wise

subject to over all increase of (+)50% of Agreement value.

7) Time is the essence of contract and the date, agreed upon and specified in the

agreement shall be guaranteed under a penalty clause as specified in clause 4 of the

Civil Engineering booklet containing "Regulations for tender and contracts, conditions

of tender, tender agreement form and general conditions of contract".

8) All the equipments/materials covered by this contract shall comply with the

specifications enclosed and relevant I.S.S. and B.S.S. as required to in the

specifications in all respects and shall be adequate to perform the duties for which

they are designed. The works executed shall conform in all respects, the standard

codes of practices, I.E. Rules and regulations.

9) Maintenance period (a) The maintenance period shall be 12 months from the date of

completion of the work and taking over of the complete installation by Railways after

satisfactory tests and trails. The contractor shall guarantee the equipments supplied

by trails. The contractor shall guarantee the equipments supplied by him against

defective materials/design / manufacturer and faulty workman ship for a period of

12 months. The contractor shall replace at his own cost and any part or parts of the

apparatus of equipment supplied by him, which may within this period, fail to perform

its proper function because of any defects in the design, construction manufacture,

erection of such apparatus/equipment/materials. The contractor shall at all times,

during the progress and continuance of the work and also for the periods of

maintenance and after the date of issue of the completion certificate by the Engineer

or other earlier date subsequent to the completion of the work that may be fixed by

the engineer be responsible for effectively maintain and uphold in good substantial

sound perfect conditions and all and every part of the work as the Engineer shall

require, any damage of defect that may any way connected with the work provided

that such damage or contract document, defect is not directly cause by error in the

act of providence or incurrention or Civil riots and the entire contractor other

personally entitled thereto, whenever required by the Engineer to do so, all losses,

damages, costs and expenses and any of them may incur or be pattor be liable to by

reasons, or Consequence of the operations of his failure in any respect.

b) The Contractor shall also make defect in the equipment/installation this maintenance

period. The work of electrification/ replacement of defective materials shall be

promptly attended to by the contractor within a period of 21 days from the date of

receipt of advices to the effect from the engineer, if any time, the work of

rectification/replacement is delayed by the contractor beyond 21 days the

maintenance period of 12 months shall also stands extended automatically by the

corresponding delayed period taken by the contractor for rectification/replacement if

during the maintenance period the capacity performance of any equipment is found

inadequate/incapable, the contractor shall have the same replaced free of cost

suitable one.

10) In all matters of dispute, the decision of the Chief Electrical Engineer / S.C.Railway /

Secunderabad shall be final and binding.

23

11) Specifications:- Every effort has been made by the Rlys. to cover all the items

required for executing and various items of works in the respective specifications.

These items might have been covered explicitly or implicitly in the specifications and

the contractors shall however provided free of cost of all such items that they may be

required for proper execution, commissioning are preference of the equipments

supplied and installed by them whether they are mentioned explicitly or implicitly in

this specifications or not no extra claim whether will be entertained by the Railway for

such times so provided by the contractor for proper execution or for executing

satisfactory performance of the Installation provided by them under this contract.

12) Terms of Payments:- The Contractor shall submit his / their bills for payment of 100%

of the completed and commissioned portion of work to the Sr. Divisional Finance

Manager/ S.C.Rly./ Guntakal through Sr.DEE/M/S.C.Railway/Guntakal.

13) No payment shall be made by the Railway to the contractor separately as

reimbursement of excise duty, if any on the equipment or on the finished equipments

when forming part of the contract. The Supply prices are delivery site including freight

and transit insurance the and are NET and FIRM including all duties and taxes.

Necessary Form-D will be furnished by the Railway receipt of the advise from the

contractor.

14) The Chief Electrical Engineer or his authorised representative shall have the right to

refuse admission into the site to any person employed by the contractor(s) whom he

may consider undesirable.

15) The Contractor shall express the greatest care and skill during the process of

dismantling the existing equipment which shall be done in the presence of and to the

entire satisfaction of and authorised representative of the Chief Electrical Engineer

he shall not hamper with a released materials and shall hand over them to authorised

representative and shall fix up suitable dates and timings for these purchase with the

permission of the Chief Electrical Engineer.

16) Cutting away and making good:- The contractor(s) shall carryout the necessary

cutting away and making good for the proposal of the contractor or all wood works,

walls floors etc., of the Railway building. The Contractor(s) shall be responsible and

shall make good at his / their expense to the satisfaction of the president any

damage or disfigurement of the building which may be carried by the acts or

commission of the contractor's agent in connection with the contract.

17) Obstruction to Railways staff:- The contractor(s) shall not obstruct directly or

indirectly the Railway staff on duty and the staff working with the Rlys. System in any

form.

18) Convenience to Railway staff:- The contractor(s) will note that in the residential or

service building being under occupation they shall take all necessary precaution to

avoid any inconvenience to occupations or against damage to furniture and their

property more than one room may not be available at a time for the execution of the

work and in stating the time for completion of the work due regard shall be paid by

him to this.

19) Power:- Subject to or otherwise provided in this contract all notices to being on behalf

of the president of India and all other action to be taken on his behalf may be given or

taken on his behalf by the Chief Electrical Engineer, South Central Railway,

Secunderabad.

20) The contract or shall submit, along with the final bills, the information to the wages

paid to the labourers in the execution of the work entrusted to him.

24

21) Financial capability:- The Tenderer shall submit document to assure Railway regard

in their financial capacity along with Income tax certificate and any other certificate in

support there of if there forming a vensortium for taking up this work they have also

be submit documents of Agreement reached in this respect, the partnership deed

etc., with the tenderer, since this work is a major work of specimen nature to be

completed within 2 months it is excepted that the tender would have executed works

of similar nature.

22) Stipulation of any special conditions by Tenderer:- The Inspection Officer(s) for this

contract shall be nominated by Railway as indicated in the contract.

22.2 The Contractor shall provided, without any extra cost, to the Railway all materials,

equipments, tools, labour and maintenance of every kind with necessary testing

facilities which the Railway of the inspecting office may consider necessary for any

test and examination to be made at the contractor's or sub-contractor premises and

at site and shall pay all cost attended there on.

23) Certificate of inspection and approval:-

23.1 No equipment/stores will be considered relay for dispatch until the Railway of the

inspecting officer nominated by it shall have certified in writing that they have

inspected and approve by him.

23.2 The inspecting Officer of his authorised representative shall have at all responsible

times, access to the contractor's premises and shall have power to.

23.3 The Contractor shall arrange to conduct all outline test at any time during the

manufacture at manufacturer's premises on in the premises of the sub-contract or at

the site of erection.

23.4 Certify before any equipment is submitted for inspection that it cannot be in

accordance with the contract owing to in satisfactory method employed.

24.1 Completion of work:-

The Contractor shall commence the work from the date of the letter of

acceptance of tenderer is received, and shall complete the work in all respect with

in the stipulated time.

24.2 The Railway attached the utmost importance to the timely completion of the work on

or before the date of contract for in this connection, the attention of the contractor is

specially invited to the clause regarding, liquidated damages and determination of

contract owing to default of contractor provided for and general of contract.

Eligibility Criteria for tenders

[ for open tenders costing above Rs.10 lakh ]

a. Should have completed in the last three financial years (i.e., Current year and three

previous financial years) –

- At least one similar single work, for a minimum value of 35% of

advertised tender value during the period from 01.04.2004 to 31.08.2007.

b. Total contract amount received during the last three financial years and in the current

financial year –

- Should be a minimum of 150% of advertised tender value. Documentary

evidence in terms of same to be furnished by the tenderers along with the

offer i.e., from 01.04.2004 to 31.08.2007.

25

1. For the purpose of (a) above, portion of work completed and recorded in

Measurement Book within the stipulated period will only be considered. Tenderer

shall enclose credential certificates for each work as per the following.

Name of the work:

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Agreement Value: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Agreement No. & Date: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Sl. Bill No. Date of Gross payment Cumulative payment

No. Measurement Received Received

2.0 The following works are considered as similar works for this purpose.

i. Tender No.14 /07-08 : Rewiring / New wiring of staff quarters and service

buildings

3.0 The following documents shall be submitted along with tender to fulfil

minimum eligibility criteria:-

3.1 Tenderer should submit an attested copy of certificate obtained from Jr. Administra -

tive Grade Officer of Electrical department of Railway / Superintendent Engineer of

State Government of equivalent grade officer in Quasi Government department /

Public Sector undertakings in Central to the Eligibility criteria. Description of work,

organization for whom executed, value contract at the time of award, date of Award,

date of scheduled completion of work, date of actual start, actual completion, final

value of contract. If the work is completed but final bill not paid, details as required

to shall be made available. Certificate from Private Individuals from whom such

works are executed shall not be considered

3.2 Attested copy of Revenue Solvency certificate issued by MRO and Bankers Solvency

issued from Nationalized/Schedule Bank shall be considered. The date of issuing

the solvency by Revenue/Bank shall not be older than one year from the date of

opening of tender.

3.3 Attested copy of certificate from Jr.Administrative Grade Officer of Electrical

department of Railways/Superintendent Engineer of State Government or equivalent

grade officer in Quasi Government received during the last 3 financial years and in

the current financial year. Audited balance sheet indicating agreement wise contract

bills received during the last 3 financial years duly signed and certified by the

Chartered Accountant also can be enclosed.

26

3.4 List of works on hand indicating name of work, contract value, Bill amount paid so

far, due date of completion etc, to be furnished by contractor and this certificate to

be signed by contractor.

3.5 The bonus of establishing credentials lies with the tenderer and hence Railway

shall valuate the offer only from the certificates/documents submitted along with the

tender offer.

3.6 Any Certificates, documents submitted after tender opening shall not be given any

credit and shall not be considered.

3.7 The offer of tenderer(s) who do not enclose Solvency Certificate, Experience

Certificate, Turnover Certificate and list of works in hand as 2.1 to 2.4 along with

their tender to establish their credentials shall be summarily rejected though they are

working contractors or contractors of approved list.

4.0 The following further documents may be submitted along with tender:-

4.1 List of Personnel organization available on hand and proposed to be engaged for the

subject work. These two lists should be given separately and signed by tenderer. List

of plant and machinery available on hand (own) and proposed to be inducted

(own and hired to be given separately) for the subject work and this list shall be

signed by tenderer.

4.2 List of works completed in the last three financial years giving description of work,

organization for whom executed, approximate value of contract at the time of award,

date of award and date of scheduled completion of work, date of actual actual start,

actual completion and final value of contract should also be given.

5. If any Certificates or details enclosed by tenderers are found to be

fake/bogus/tampered, such of those agencies shall not be awarded any work in

S.C.Railway for a period of 5 years from the date of opening of tender. Joint

ventures or partnership firms or any other nature of firms in which such agencies are a

party shall also not be awarded any work for this period of 5 years.

6. Performance Guarantee:

a The successful bidder should give a performance Guarantee in the form of an

irrevocable bank guarantee issued by any Nationalized or Scheduled Bank

amounting to 5% of the contr5act value as contained in Sl.No.3 if amendment of

GCC advised vide Railway Board letter No.2003/CE-I/CT-4/Pt.I dated 12/16-5-

2006

b. Time period for submission of performance guarantee: The performance

Guarantee should be furnished by the successful contractor within 15 days from

the date of issued of the letter of acceptance, but before signing of the agreement

and should be valid upto expiry of the maintenance period.

c. Performance Guarantee should be released after satisfactory completion of the

work and after completion of the maintenance period.

7. Conservancy Charges: As applicable from time to time to be levied (C1.6 of GCC

& C.S.No.5.0 FCC)

27

8. Joint Ventures/Consortium Agreements/MOUs shall not be considered:

Partnership deed is eligible if entered into and registered prior to Tender Notice.

Tenderer should enclose/submit experience certificate in the same name and style as

the tenderer & other credentials shall be considered fully to the extent of work

executed by the partnership firm (Experience of individual partners will not be

considered)

9. The tender form in the prescribed proforma may be obtained from the office of the

Divisional Railway Manager/Electrical, South Central Railway, Guntakal on production

of Cash receipt of each tender from at the rates mentioned above. Rs.50/- should

be paid extra for each tender, if the tender form is required to be sent by post. The

amount towards the cost of Tender form may be remitted to the Divisional

Cashier/Pay/South Central Railway.Guntakal (or) to any Station Master on South

Central Railway. The receipt obtained thereof, should be submitted to the office of

the undersigned with the requisition for issue of tender form. The cost of the

tender form is not refundable. FDRs towards EMD are to be drawn in favour of

Senior Divisional Finance Manager/South Central Railway.Guntakal on the account

of Tenderer

10. Tenderers can also down load the tender form from the web site Indian Government

Tender Portal for the purpose of perusal and to use the same as tender document if so

desired.

11. Those who are participating in the tender with down loaded copy from the web site

shall enclose a separate DD/PO/BC drawn in favour of Senior Divisional Finance

Manager, South Central Railway,Guntakal or Money receipt obtained from Divisional

Cashier Pay/Guntakal towards the cost of the tender form without which the tender

shall be treated as invalid. Separate Bank instruments/Money receipts should be

enclosed for EMD and cost of tender form in case of downloaded tender documents.

FDRs will not considered towards cost of tender form.

12. Contract agreement will be prepared based on the master copy of the tender document

available in DRM(Electrical) Office/Guntakal and will be binding on the contractor.

The Railway does not own any responsibility for any alteration/omission in the

contents of the Tender document either while uploading on to web site or otherwise.

No claim on this account will be entertained. The administration will not own any

responsibility, if the web site is not opened for down loading the tender documents

due to any technical snag.

13. The prospective tenderers are advised to visit the web site one week before the

date of tender opening to note any changes/corrigenda of any tender

WARNING: It is hereby brought to the notice of all prospective tenderers that if any

change/additions/deletions/.alterations are found to be made by them in the tender

form and the same is subsequently detected/noticed at any stage even after award of

the contract, suitable action including banning of business with them would be taken.

In addition, the tenderers are liable to prosecuted under law.

14. Tenders without requisite EMDs (and DD/PO/BC or Money receipt towards cost of

tender document in case of down loaded tender forms) shall be summarily rejected.

28

15. In case tenderer remits less amount towards cost of tender form down loaded

from website, the same shall be summarily rejected. No correspondence will be

entertained in this regard.

16. The Railway reserves the right to cancel the tender without assigning any reason

thereto.

17. Tender documents duly completed in all respects shall be dropped in the tender box

kept for the purpose in the Tender’s opening Hall, Divisional Railway Manger’s

Office compound, South Central Railway,Guntakal, Anantapur District.

(OR)

May be sent by post to Divisional Railway Manager (Electrical) South Central

Railway,Guntakal-515801, Anantapur District (Andhra Pradesh) Railway is not

responsible for any delay in transit (or) loss of tender form sent/received by post

18. If the opening date happens to be a holiday the tenders will be received and opened on

the next working day/at the same time.

* * *

29

South Central Railway Electrical Branch Guntakal Division

Tender No. G/E. 14/2007-2008

Tender Case File No.G/E.29/I/608

Details of the Work

Name of the work:

Guntakal Division - Proposed Electrification of Staff Qrs. Type.III - 33 Units at 08

Stations. Viz; GTL - 16 units, GY - 06 units, TU - 02 units, KDP - 02 units, HX - 04

units, MOO – 01 unit, YA - 01 unit, KSN - 01 unit.

Sl.

No. Description

Qty. Unit

I Extension of power supply to the proposed staff quarters.

1 Provision of service connection by means of 2 Nos. of 10 sqmm multi stranded

PVC insulated and sheathed copper conductor complete.

315 Mtr.

2 Supply of one No. of GI catenary earth wire of 8 SWG. 315 Mtr.

3 Supply and fixing of GI pipe 50 sqmm dia x 2.44 m length as per the enclosed

drawing with suitable size clamps, rag bolts etc., complete

21 Set

4 Inside mains from up-right to the main board of first unit and also to the main

board of the adjacent quarters complete

31 E/Block

5 Earthing arrangements as per standard specifications and drawing

no.A3/E/M/10/R.

21 E/Pit

6 Supply and Erection of rail posts complete. [Rails will be supplied by Railways]. 4 Each

7 Painting Rail posts with One coat of Red-oxide and Two coats of Aluminium

paint complete.

4 Each

8 Supply, fabrication and fixing of GI 4 way cross-arm of size 100 mm x 50 mm x

1200 mm long channel, including insulators complete including all connected

materials and works.

4 Each

9 Supply, fabrication and fixing of GI guarding Cross-arm of size 50mm x 50mm x

6 mm thick x 1400mm long complete.

4 E/Set

10 Supply and stringing of 05 nos. of ACSR conductors (3ph+N+1 for street lights)

of size 1/6/2.59 mm and 01 no. of GI earth wire of size 8 SWG complete.

4 Span

11 Supply and stringing of guarding arrangeents by means of 02 nos. of 6 SWG

longitudinal wires complete.

4 Span

12 Fixing of weather proof integrated fitting on to the Rail post with including power

supply connections etc; with all other connected materials and works.

7 Set

13 Supply, fabrication and fixing of GI 2 way Cross-arm of size 100mm x 50mm x

600mm long channel, including insulators complete.

4 Set

14 Stay/strut arrangements complete including making of pit, casting of foundation

in RCC, couping etc., with all connected materials and works.(Releases cut rail

posts will be supplied by Railways).

4 Set

II Provision of internal electrical installations in staff quarters.

15 Supply and fixing of white 3mm thick hylum wooden main control board of size

18" x 12" (450mm x 300mm) complete.

33 Set

16 Supply and fixing of 3mm thick hylum sheet topped wooden board of size

250mmx 200mm complete.

99 Set

17 Supply and surface Wiring to power plug point of 15A cap. from main board by

means 2 Nos. of multi-stranded insulated Copper Conductor of 4 Sq.mm

complete.

99 Set

18 Supply and fixing of 3mm thick hylum sheet topped wooden board of size

250mmx 200mm complete (to be fixed in the bed room).

66 Set

19 Supply and fixing of 3mm thick hyleum sheet topped wooden board of size

175mmx 100mm complete.

33 Set

20 Supply and Wiring from main board to sub-distribution board by means of 2 nos

of 2.5 sq.mm multi-stranded insulated copper conductor complete.

1485 Mtr

30

21 Wiring to light and fan points by means of 2 Nos. 1.5 Sqmm PVC insulated and

sheathed multi-stranded copper cable conductor complete.

495 Point

22 Fixing of 4ft long x 40W box type integrated fitting complete from the ceiling rose

mounted on junction box.

99 Set

23 Fixing of AC ceiling fan of size 1400 mm sweep complete with down rod

complete.

99 Set

24 Supply and fixing of calling bell musical type similar to Anchor make complete. 33 Set

25 Supply and fixing of Incandescent light fitting and 01 no. of 60Watts

Incandescent lamp including connections complete.

165 Set

26 Supply and fixing of bulk head light fitting with GI wire guard and 01 no. of 40

Watts IC lamp including connections from the ceiling rose complete.

66 Set

[RC Items]

1 Supply of Weather proof integrated FL fitting suitable for 1x40W x 1200 mm

Fluorescent lamp including supply of lamp.

7 Set

2 Supply of FL fittings 1200 mm (4ft) long x 40W box type integrated fitting with

copper wound choke, 1 x 40W FL lamp etc., complete.

99 Point

3 Supply of AC ceiling fan of size 1400 mm sweep complete with down rod

complete with all other connected materials and works.

99 Set

Contractor / Tenderer

Sr.DEE/GTL.

31

South Central Railway Electrical Branch Guntakal Division

Schedule-B

Tender No. G/E.14/2007-2008

Tender Case File No.G/E.29/I/608

Name of the work:

Guntakal Division – Proposed Electrification of Staff Qrs. Type.III – 33 Units at 08

Stations. Viz; GTL – 16 units, GY – 06 units, TU – 02 units, KDP – 02 units, HX – 04

units, MOO – 01 unit, YA – 01 unit, KSN – 01 unit.

S. Rate (Rs.)

No.

Description

Qty.

Unit

in fig. In words

Total

Schedule – B1

I Extension of power supply to the

proposed staff quarters.

1 Provision of service connection by means

of 2 Nos. of 10 sqmm multi stranded PVC

insulated and sheathed copper conductor

complete with all other connected

materials and works.

315 Mtr. 77.60 [Rupees Seventy

seven and paise sixty

only]

24444

2 Supply of one No. of GI catenary earth

wire of 8 SWG.

315 Mtr. 3 [Rupees Three only] 945

3 Supply and fixing of GI pipe 50 sqmm dia

x 2.44m length as per the enclosed

drawing with suitable size clamps, rag

bolts etc., complete including connected

materials and works.

21 Set 651 [Rupees Six hundred

and fifty one only]

13671

4 Inside mains from up-right to the main

board of first unit and also to the main

board of the adjacent quarters complete

with 02 nos. of 4 sqmm PVC insulated

multi stranded copper conductor drawn

through 1.5mm thick x 19mm dia rigid

PVC pipe and 01 no. of 14 SWG tinned

copper earth wire run in side the pipe.

The pipe shall be firmly held to the walling

by means of GI saddle clamps with

screws spaced at distance of not

exceeding 500mm spacing.[Type.III]

31 E/Block 330 [Rupees Three

hundred and thirty

only]

10230

5 Earthing arrangements as per standard

specifications and drawing

no.A3/E/M/10/R including digging earth

pit, provision of 50mm GI pipe electrode

complete with all other connected

materials and works including connecting

the earth electrode and aerial earth wire

by means of 8 SWG GI earth wire. Earth

and salt inside the pit and this mixture and

charcoal of good quality to be provided

inside the pit layer by layer.One each for

Qrs. and one for Power supply

arrangements. The couping of the earth

pit including the cover shall be at ground

level only with titling type handle.

21 E/Pit 950 [Rupees Nine

hundred and fifty

only]

19950

32

6 Supply and Erection of rail posts complete

including digging pit, provision of concrete

foundation and couping of size 610 mm x

610 mm above the ground level complete

with all other connected materials and

works. [Rails will be supplied by

Railways].

4 Each 936 [Rupees Nine

hundred and thirty six

only]

3744

7 Painting Rail posts with One coat of Redoxide

and Two coats of Aluminium paint

with painting of Red band 300mm size

below the guarding level.

4 Each 315 [Rupees Three

hundred and fifteen

only]

1260

8 Supply, fabrication and fixing of GI 4 way

cross-arm of size 100 mm x 50 mm x

1200 mm long channel, including

insulators, GI fixing clamps “F” clamp for

earth wire, Gi bolts and nuts complete

including all connected materials and

works.

4 Each 443 [Rupees Four

hundred and forty

three only]

1772

9 Supply, fabrication and fixing of GI

guarding Cross-arm of size 50mm x

50mm x 6 mm thick x 1400mm long GI

fixing clamps, GI bolts and nuts and GI

eye bolts etc., complete all other

connected materials and works.

4 E/Set 350 [Rupees Three

hundred and fifty

only]

1400

10 Supply and stringing of 05 nos. of ACSR

conductors (3ph+N+1 for street lights) of

size 1/6/2.59 mm and 01 no. of GI earth

wire of size 8 SWG complete including all

connected materials and works.

4 Span 3654 [Rupees Three

thousand six hundred

and fifty four only]

14616

11 Supply and stringing of guarding

rrangements by means of 02 nos. of 6

SWG longitudinal wires and cross lacings

with 8 SWG GI wire, 15 nos. of horizantal

lacings shall be provided at equal

distance of not more than 3 mtrs spacing

complete including all connected

materials and works.

4 Span 660 [Ruppes Six hundred

and sixty only]

2640

12 Fixing of weather proof integrated fitting

on to the Rail post with 40mm dia GI pipe

fixing bracket of adequate length made to

shape, GI holding clamps, GI bolts and

nuts complete including fixing, with

including power supply connections etc;

with all other connected materials and

works.

7 Set 200 [Rupees Two

hundred only]

1400

13 Supply, fabrication and fixing of GI 2 way

Cross-arm of size 100mm x 50mm x

600mm long channel, including insulators,

GI fixing clamps, Gi bolts and nuts

complete including all connected

materials and works.

4 Set 320 [Rupees Three

hundred and twenty

only]

1280

14 Stay/strut arrangements complete

including making of pit, casting of

foundation in RCC, couping etc., with all

connected materials and works.(Releases

cut rail posts will be supplied by

Railways). The rail post shall be painted

with two coats of Red-oxide and one coat

of Anti-corrosion paint.

4 Set 638 [Rupees Six hundred

and thirty eight only]

2552

33

II Provision of internal electrical installations

in staff quarter.

15 Supply and fixing of white 3mm thick

hylum wooden main control board of size

18" x 12" (450mm x 300mm) with 1 No. of

2 pole 32 A cap DP MCB(AC) 01 no. of

Earth leackage Circuit Breaker of 25

Amps Cap. and 01 no. of Single phase

KHWr meter of 20 Amps Cap. and 01 no.

of 3 pin plug socket of 25 Amps Cap. and

space to accommodate fan regulator and

switches etc., complete with all other

connected materials and works.

33 Set 2535 [Rupees Two

thousand five

hundred and thirty

five only]

83655

16 Supply and fixing of 3mm thick hylum

sheet topped wooden board of size

250mmx 200mm with 1 No. of 3 pin plug

socket of 15Amps capacity combined with

switch complete with all connected

materials and works.

99 Set 190 [Rupees One

hundred and ninety

only]

18810

17 Supply and surface Wiring to power plug

point of 15A cap. from main board by

means 2 Nos. of multi-stranded insulated

Copper Conductor of 4 Sq.mm run on

the suface of the wall duly consealed in

1.5mm thick x 19mm dia rigid PVC pipe,

and 1 no. of 14 swg copper earth wire run

along side the PVC pipe. The PVC pipe

shall be fixed by means of GI saddle

clamps and screws spaced at a distance

of not more than 500mm. complete with

all connected materials and works.

99 Set 300 [Rupees Three

hundred only]

29700

18 Supply and fixing of 3mm thick hylum

sheet topped wooden board of size

250mmx 200mm with 1 No. of 3 pin plug

socket of 5Amps capacity, and to fix fan

regulator and and 2 Nos. of piano type

switches complete with all connected

materials and works. (to be fixed in the

bed room).

66 Set 165 [Rupees One

hundred and sixty

five only]

10890

19 Supply and fixing of 3mm thick hyleum

sheet topped wooden board of size

175mmx 100mm with 01 no of 3 pin 5

Amps Cap. Plug socket combined with

switch complete with all connected

materials and works.

33 Set 85 [Rupees Eight five

only]

2805

20 Supply and Wiring from main board to

sub-distribution board in the bed room,

verandah etc., by means of 2 nos of 2.5

sq.mm multi-stranded insulated copper

conductor duly encased in casing and

caping / PVC pipe and 1 no. of 14 swg.

tinned copper earth wire run along side

the PVC pipe. The PVC pipe shall be held

by means of G.I. saddle clamps and

screws spaced at equal distance not

more than 500mm, complete with

connected materials and works.

1485 Mtr 30 [Rupees Thirty only] 44550

21 Wiring to light and fan points by means of

2 Nos. 1.5 Sqmm PVC insulated and

sheathed multi-stranded copper cable

conductor duly encased in rigid PVC pipe

495 Point 199 [Rupees One

hundred and ninety

nine only]

98505

34

of 1.5mm thick x 20mm dia pipe and 1

No. of 14 SWG copper earth wire run

along side the PVC pipe. The PVC pipe

shall be held firmly be means of GI saddle

clamps and screws spaced at equal

distance of not exceeding 500mm.

22 Fixing of 4ft long x 40W box type

integrated fitting complete including

connections with flexible twin tiwsted PVC

insulated copper conductor from the

ceiling rose mounted on junction box.

99 Set 50 [Rupees Fifty only] 4950

23 Fixing of AC ceiling fan of size 1400 mm

sweep complete with down rod complete

with all other connected materials and

works.

99 Set 50 [Rupees Fifty only] 4950

24 Supply and fixing of calling bell musical

type similar to Anchor make Model

No.29716 with all other connected

materials and works.

33 Set 220 [Rupees Two

hundred and twenty

only]

7260

25 Supply and fixing of Incandescent light

fitting of sorts, with plastic conical shade

of octogonal / round shape 175mm (7")

and 01 no. of 60Watts Incandescent lamp

including connections with all other

connected materials and works.

165 Set 45 [Rupees Forty five

only]

7425

26 Supply and fixing of bulk head light fitting

with GI wire guard and 01 no. of 40 Watts

IC lamp on 19 mm thick wooden plank of

adequate size including connections with

twin tiwsted multi-stranded PVC cable

from the ceiling rose complete including

connections with all other connected

materials and works.

66 Set 65 [Rupees Sixty five

only]

4290

Sch-B1 Total : 417694

[ Total Rupees Four lakh seventeen thousand six hundred and ninety four only ]

Contractor's Percentage: Below ____% At Par Above _______%

Schedule-B2 [ RC Items ]

1 Supply of Weather proof integrated FL

fitting suitable for 1x40W x 1200 mm

Fluorescent lamp including supply of

lamp.

7 Set 446 [Rupees Four

hundred and forty six

only]

3122

2 Supply of FL fittings 1200 mm (4ft) long x

40W box type integrated fitting with

copper wound choke, 1 x 40W FL lamp

etc., complete with all other connected

materials and works.

99 Point 249 [Rupees Two

hundred and forty

nine only]

24651

3 Supply of AC ceiling fan of size 1400 mm

sweep complete with down rod complete

with all other connected materials and

works.

99 Set 901 [Rupees Nine

hundred and one

only]

89199

Sch-B2 Total : 116972

[ Total Rupees One lakh sixteen thousand nine hundred and seventy two only]

Contractor's Percentage: Below ___________% At Par

Grand Total : Sch-B1 & B2 534666

[Rupees Five lakh thirty four thousand six hundred and sixty six only]

35

Note:

1 Prior written approval should be obtained for the materials that are being used for the work before

erection from nominated Railways representative.

2 The tenderers are advised to inspect the site(s) before quoting.

3 The contractors are advised to visit the site(s) and submit cable route diagram and get it approved

before placing order for cables.

4 Tenderers shall specifically mention the brands offered and relevant technical details, specifications,

catalogues and leaflets etc., wherever applicable, should invariably be enclosed, so as to evaluate their

offers.

5 The exact location of the work will be shown by the Engineer at site. After marking is given, schematic

diagram shall be prepared and submitted to Senior Divisional Electrical Engineer's office for approval.

Work shall be taken up based on the approved drawings only.

6 All damages during the work to men and materials (Railways or otherwise) shall be made good by the

contractor at his own cost. Otherwise recovery will be made from the bills.

7 All the fittings / equipments should be CEE approved makes only and to be purchased from the

Original Equipment Manufactureror authorised dealers only. Authorised dealer ship certificate shall be

submitted. The makes proposed to be procured for all the items shall be submitted and got approved

before placing orders.

8 All the released materials have to be handed over to Section incharge in the condition in which they

are. Before releasing, list to be prepared, jointly signed by Contractor Representative and Rlys

Representative and submitted to Sr.DEE's Office for approval

9 The contractor shall invariably quote the rate separately for Schedule-B1 and Schedule-B2 [RC items].

However, in case of Schedule-B2 [RC items], if the rate quoted is on higher side then only rate as

indicated in the Schedule-B2 will be considered.

10 The rate is inclusive of all taxes, Excise duty, Octrai etc.,

11 For supply items if original bills / invoice are submitted duplication of Tax will be avoided.

12 The tenderers can verify the Specification and explanatory note and Drawing etc., from Technical

Section of Sr.DEE/Office/Guntakal

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

We abide by the extant rules of the railway stipulated under General Condition of Contract and

rules laid down in Special Conditions of Contract.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Contractor / Tenderer

Sr.DEE/GTL.

36

CEE/SCR’s LIST OF APPROVED SOURCES (POWER SIDE)

[As on January 07 and Validity upto 31.03.2008]

Schedule-‘C’

1. XLPE power cable PVC sheathed for voltages up to 33 KV to IS:7098 (Part-II)

1985:

a) CCI b) Incab Industries Ltd., c) Fort Gloster d) Universal cables

e) Finolex cables f) Nicco Corp. Ltd. g) Premier cable Co., Ltd. h) Sterlite Industries

Ltd.

i) Indian Cables Ltd. j) Industrial cables (I)

Ltd

k) Asian cable Corp. Ltd. l) Torrent cables Ltd

m) Central cables n) Orient power cable

o) Havells p) Poly cab

1.1 XLPE power cable PVC sheathed for voltages up to 1.1 KV to IS:7098 (Part-I)

1988 :

a) CCI b) Incab Industries Ltd., c) Fort Gloster d) Universal cables

e) Finolex cables f) Nicco Corp. Ltd. g) Premier cable Co., Ltd. h) Sterlite Industries

Ltd.

i) Indian Cables Ltd. j) Industrial cables (I)

Ltd

k) Asian cable Corp. Ltd. l) Torrent cables Ltd

m) Central cables n) Orient power cable

o) Havells p) Poly cab

2. HT Insulators 11 KV and 33 KV to IS:731 (1971) with fittings to IS: 2486

Part-II (1974) :

a) WS Industries (I) Ltd. b) Seshasayee

Industries Ltd.

c) BHEL (Electric

Porcelains divn)

d) Venkateshwara

e) Ceramics, Warangal f) Jayashree Insulators

3 PVC Insulated and PVC sheathed, Al. Conductor, all sizes, 1100 V heavy duty

armoured cable confirming to IS : 1554 :

a) CCI b) Incab Industries Ltd., c) Fort Gloster d) Universal cables

(Unit star)

e) Finolex cables f) Nicco Corp. Ltd. g) Premier cable Co., Ltd. h) Sterlite Industries

Ltd.

i) The Indian Aluminium

Cables Ltd.

j) Industrial cables (I)

Ltd

k) Fine cab wires and

cables Pvt Ltd.

l) Paragon cables

India

m) Poly cab n) Asian cable Corp.

Ltd

o) Orient power cable p) Torrent cables Ltd.

4 33 KV Lighting Arrestor Gapless metal oxide type heavy duty confirming to IS

: 3070 (1985) and to with stand surge current upto 10 ka. :

a) Oblum b) Crompton Greaves c) WS d) Lamco

e) ELPRO international Ltd

5 11 KV Lighting Arrestor Gapless metal oxide confirming to IS: 3070 (1985) and

to with stand surge current upto 150 ka :

a) Oblum b) Crompton Greaves c) WS d) Lamco

e) ELPRO international Ltd

6 33 KV AB Gang operated switch with drop out fuse capacity 200 A to 1750 A

and confirming to IS : 9921 (1982) :

a) ECE Industries b) Asea Brown Boveri

Ltd.,

c) IE Power Gears Pvt

Ltd. Hyd

d) Alliance Engg Pvt

Ltd.,

e) S&S power switch gear

Ltd.

f) HLM

7 11 KV AB Gang operated switch with drop out fuse capacity 200 A to 400 A

and confirming to IS : 9921 (1982) :

a) ECE Industries b) Asea Brown Boveri

Ltd.,

c) IE Power Gears Pvt

Ltd. Hyb

d) Alliance Engg Pvt

Ltd.,

e) S&S power switch gear

Ltd.

f) ALINO g) Crompton Greaves h) Jyothi

i) Mysore Electric j) NGES k) Siemens l) Trans Electricals

37

8 11 KV VCB with control Box out door type 3 pole, 50 Hz confirming to IS :

2516 / 3427 latest :

a) GEC Alsthom b) Crompton Greaves c) BHEL d) Siemens

e) Andrew Yule f) Kilbum g) Voltas h) Biecco Lawrie

i) Asea Brown Boveri Ltd.

j) Jyothi k) ECE Industries l) ALIND

9 Transformer 11/0.433 KV, 50 Hz, 3 phase outdoor type, copper would

confirming to IS:2026 capacity upto 500 KVA (Inclusive) :

a) Bharat Bijlee b) Ramakrishna

Transformer / Hyd

c) NGEF d) Kirloskar Electric

Co Ltd.,

e) Kerala Electric & Allied

Engg Co. Ltd.,

f) ECE Industries g) Asea Brown Boveri

Ltd.,

h) Alstom

i) Crompton Greaves j) Radhika Electricals k) EMCO l) Siemens

m) Tesla n) Volt Amp o) Andrew Yule p) Hint Transformers

q) Voltas r) Mahendra

Transformers

(Ghaziabad)

s) Vijaya Electricals

10 Transformer 11/0.433 KV, 50 Hz, 3 phase out door type, copper wound,

confirming to IS:2026 capacity above 500 KVA upto 1000 KVA :

a) Bharat Bijlee b) NGEF c) Crompton Greaves d) Kirloskar Electric

Co Ltd.,

e) ECE Industries f) Asea Brown Boveri

Ltd.,

g) Alstom

j) BHEL k) EMCO l) Siemens m) Tesla

n) Volt Amp o) Andrew Yule p) Hint Transformers q) Voltas

r) Mahendra Transformers

(Ghaziabad)

s) Vijaya Electricals

11 33 / 11 KV Power Transformer 3 phase, Outdoor type, Copper wound,

confirming to IS:2026 2.5 MVA to 5 MVA :

a) Bharat Bijlee Ltd. b) GEC c) Crompton Greaves d) EMCO

Transformer Ltd.

e) BHEL f) Kirloskar Electric

Co.

12 Relays for protection :

a) Asea Brown Boveri Ltd., b) VXL c) BCH d) GEC Alsthom

e) Alind f) BHEL g) Easun Rey Rolle h) Jyothi

i) L&T (Rishab) j) Siemens

13 MCCB 3 pole, 50 Hz, 415V Confirming to IS:13947 (Part-2) 1993:

a) GEC Alsthom b) L&T c) Crompton Greaves d) Andrew Yule

e) Standard Electricals f) C&S Co Ltd., g) BCH h) Legrand MDS

i) BHEL j) Jyothi k) Mysore Electric l) Siemens

m) Indo kopp n) Indo-Asian

14 Electrical Energy Meter Electro-mechanical Confirming to IS : 13010 / 1990

with amendment No.1 to 3 and Electronic Energy Meter Confirming to IS :

13779 / 1999. Class 1.0 with latest amendments :

a) Baroda Electric meters

Ltd.

b) VXL India Ltd. c) Jaipur Metal Works

Ltd.,

d) Capital power

systems Pvt Ltd.,

e) Havells (I) pvt.Ltd f) ECE g) Meters & Instru ments

Pvt Ltd.,

h) Industrial Meters

Ltd.,

i) Anchor j) HPL k) Indo Asian l) L&T

m) Max well

15 HPSV Lamp “ISI marked” confirming to IS: 9974 (Part-1) / 1981 with

Amendment to 1 to 3 and IS: 9974 (Part-II) / 1981 70W to 400W :

a) Philips Electronics India

Ltd.,

b) Surya Roshini Ltdl, c) The Mysore Lamp

works Ltd.,

d) GE Apar lighting

e) Crompton Greaves f) Bajaj Electricals g) WIPRO Lighting h) Osram

38

16 Weather Proof unarmoured PVC insulated and PVC sheathed cable for

Electric Power and Lighting with stranded Aluminium conductor and

Voltage ratings upto and including 1100 V, confirming to IS: 694/1990 and

conductors conforming to IS: 8130 / 1984 :

a) Vijaya Cable Industries b) Frexton Cable(I) c) Ajantha Cable Pvt Ltd., d) Indrani Cable Co.,

e) Fixolite Wires & Cables f) Cabcom (I) Ltd., g) Sun home Cable

industries.

h) Somex

i) Poly Cab Wires Pvt

Ltd.,

j) CCI k) Fort Gloster l) Incab

m) NICCO n) Asian (RFG) o) Torrent p) Universal

17 Electric Ceiling Fans 1500 mm sweep for offices, waiting halls etc., and 1800

mm sweep for platforms, capacitor type with double ball bearing complete

with 300 mm down rod, canopies, shackles, blades with speed regulator

resistance type suitable for operation on 230V, 50 Hz, Single phase AC

supply conforming to IS: 374/1979 with Amendment No.1 :

a) Crompton Greaves b) Orient Fan c) Bajaj Electricals Ltd., d) Usha International

Ltd.,

e) Polar Industries f) Havells g) Khaitan h) GEC

i) Jay Engg.

17.1 Electric Ceiling Fans 1200 mm sweep / 1400 mm sweep capacitor type with

double ball bearing complete with 300 mm down rod, canopies, shackles,

blades with speed regulator resistance type suitable for operation on 230V, 50

Hz, Single phase AC supply conforming to IS: 374/1979 with Amendment

No.1 :

a) Crompton Greaves b) Orient Fan c) Bajaj Electricals Ltd., d) Usha International

Ltd.,

e) Polar Industries f) Havells g) Khaitan h) GEC

18 AC MCB having fixed un adjustable time current characteristic for use in

protection of industrial, commercial, and domestic electric installation. These

should be suitable for use on 240/415 V, 50 Hz, AC having facility for

termination of Al. cable and fixing conforming to IS: 8828 / 1966 :

a) Havells b) MDS Switch gear

Ltd.,

c) Indo Asian Fuse Gear

Ltd

d) Controls & Switch

gear Co Ltd.,

e) Punjab Switchgear Pvt

Ltd.,

f) Merlin Gear g) Standard Electric Ltd., h) HPL India Ltd.,

i) GEC j) Jyothi k) L&T l) Siemens

m) Indo kopp

19 Self contained drinking water cooler confirming to IS:1475 / 1978 with

Amendment No.1 to 7 suitable for operation on 230 V +/ 10%, 50 Hz single

phase AC supply of Capacities 40 / 40 Litres, 60/120 Litres and 150 / 150

Leters :

a) Usha international Ltd., b) Sidwal Refregi –

ration Indus-tries

c) Blue Star Ltd., d) Voltas Ltd.,

e) Fedders f) Kelvinator

19.1 Self contained drinking water cooler rust proof with synthetic / plastic body

conforming to IS: 1475 / 1978 with Amendment No.1 to 7 suitable for

operation on 230V +/ 10%, 50 Hz, Single phase AC supply of capacities 40 / 40

Liters, 40/80 Liters, 60/120 Liters and 150/150 Liters:

a) Usha international Ltd., b) Sidwal Refregi –

ration Indus-tries

c) Blue Star Ltd., d) Voltas Ltd.,

e) Fedders f) Kelvinator

20 Street Light luminaries suitable for elliptical tubular HPSV lamps to IS: 9974

(Part-I with amendment No. 1,2 & 3 Part-II with amendment No. 1 & 2) /

1981 complete with control gear. Suitable for operation on 200-220-240 Volts,

AC single phase, 50 Hz supply Luminaries should be with IP-65 protection :

a) Philips India Ltd., b) Bajaj Electricals

Ltd.,

c) Crompton Greaves d) GE Apart Lighting

e) WIPRO Lighting

39

21 Window type room air conditioner conforming to IS:1391 (Part-1) / 199; with

Amendment No.1 & 2 and additional parameters suitable for operation on

230V +/ 10%, 50 Hz single phase AC supply capable of performing the

following functions: Cooling, dehumidifying, Air circulating, Filtering and

ventilation, Capacities. 18000 Blu/hrs 60000 Blu/hrs:

a) Carriers Air Conditioner

Ltd.,

b) Blue Star Ltd., c) Voltas Ltd., d) Fedders Lloyd

Corporation Ltd.,

e) Sidwal Refrigeration f) Godrej Co. g) Amtrex Hitachi

Appliance Ltd (T)

h) Samsung

i) Hitachi j) LG k) LG l) Onida

m) Videocon

22 Tungsten filament general lighting service electric lamp “ISI marked” clear

type conforming to IS:418/2004 Rating 40W, 230V, Coiled typp, Gas – filled

B-22/25X26 :

a) Sylvania & Laxman

Ltd.,

b) Philips India Ltd c) The Mysore Lamps

works Ltd.,

d) Bajaj Electricals

Ltd.,

e) Surya Roshini Ltd., f) ECE g) CGL h) GE Apar lighting

I) Edison Lamps Pvt Ltd.,

j) WIPRO lighting.

23 ISI Marked Tubular Fluorescent Lamp for general lighting service operated

with ballast and starter ( to be supplied without ballast and starter)

conforming to IS: 2418 (Part-1) / 1977 with Amdt. Nos. 1 to 4, IS: 2418 (Part-

2) / 1977 with Amdt Nos. 1 and 2 :

a) Philips India Ltd., b) Crompton Greaves c) Osram (Germany) d) GE Apar lighting

Ltd., (GEGermany)

e) ECE f) Bajaj Electric Ltd., g) HMT Ltd., h) Surya Roshini

Ltd.,

24 Fluorescent Tube fittings Ceiling suspension type, complete with copper

would ballast to IS No.1534 (Pt –1/1977) with amdt. No. 1 to 4, lamp holder,

starter holder and condenser duly wired up for use on 240 V single phase 50

Hz AC supply but without tube and suspension rods. The fittings shall be

made from CRCA Ms sheets of 0.5mm nominal thickness and shall conform

to IS : 10322 (Part 1 &2/1982), (Part 3 & 4) / 1984) and IS : 10322 (Part 5/ Sec

1) / 1985 with Amdt No.1, class1, protection IP 30 :

a) Philips b) CG c) Bajaj d) Mysore lamps

e) WIPRO Lighting

24.1 Fluorescent Tube Fittings Ceiling suspension type, complete with electronic

ballast to IS No.13022 (Pt, 1: 1991) with amdt. No.1 and IS : 13022: Pt.2 :

1991 with amdt. No. 1 & 2), lamp holder, starter, holder and condenser duly

wired up for use on 240V single phase 50 Hz AC supply but without tube and

suspension rods. The fittings shall be made from CRCA MS sheets of 0.5mm

nominal thickness and shall conform to IS: 10322 (Part1 & 2 / 1982), (Part. 3

& 4 / 1984) and IS : 10322 (Part 5/Sec.1) / 1985 with Amdt . No.1 class 1,

protection IP 30 :

a) Philips b) Crompton Greaves c) Bajaj d) Mysore Lamps

e) WIPRO Lighting f) Prestige lights Ltd.

24.2 Energy Efficient Tube Light Retrofit Assembly (EETL-RA) for general

lighting service complete with electronic ballast, G-5 cap & including T5 lamp

of Osram / GE (Germany) make conforming to IS : 2418/Part-III/1977 as

Amdt., latest (suitable to replace existing assembly of FTL 36/40W) :

a) Philips b) Asian c) Bajaj d) Crompton Greaves

24.3 Energy Efficient Tube Light Fitting (EEFTL) complete. Box type to SCR

specn. No. SCR/E/EEFTL/01/2007 including T5 lamps of 28 W of

Osram/GE(Germany)make conforming to IS: 2418 / Part-III / 1977 with latest

amendments :

a) Philips b) Asian c) Bajaj d) Crompton Greaves

e) Areva

40

25 Vertical / Horizantal type Geyser complete with all fittings conforming to IS:

2082 / 1993 with Amdt. No.1 and 2 suitable for 240V Single phase AC 50 Hz

supply. Capacity 25 Ltr of 1000W / 1500W and 35 Ltrs of 1500W :

a) Racold b) Crompton Greaves

Ltd.,

c) Bajaj d) Venus

e) Johnson

25.1 Vertical / Horizantal type Geyser rust proof employing Synthetic / plastic

bodies complete with all fittings conforming to IS: 2082 / 1993 with Amdt.

No.1 and 2 suitable for 240V Single phase AC 50 Hz supply. Capacity 25 Ltr

of 1000W / 1500W and 35 Ltrs of 1500W :

a) Racold b) Crompton Greaves

Ltd.,

c) Bajaj d) Venus

e) Johnson

26 Fire Retardant low tension cotton adhesive tape conforming to ICF’s

specification No.ICF/Elec./921 above 5 A (Rly Board Lr

No.2003/Elec/(G)/138/1 dt. 05.01.2006) :

a) Johnson and Johnson

Ltd.,

b) Pressure Sensitive

System India Ltd.,

c) PRS Permacel (P) Ltd

(for type P-101)

27 PVC insulation tape conforming to IS: 7809 Part-III/Sec-1/1986 upto 5A :

a) Miracle b) Steel Grip c) Anchor d) M/s PRS Permacel

(P) Ltd..

28 33 KV XLPE / PILC/PVC cable Accessories outdoor type heat shrinkable

termination kit :

a) REPL b) DENSONS c) XICON d) M-Seal brand of

Mahindra Engg &

Chemicals

e) Safe system f) Super seal g) Ray chem.

29 Bulk oil circuit breaker upto 11 KV :

a) Biecco Lawrie Ltd., b) Andrew Yule c) ECE Industries Ltd., d) Rey Rolle burn

Ltd.,

e) Southern Switch Gear

Ltd.,

f) GEC Alsthom India

Ltd.,

g) CGL h) Jyothi

i) Mysore Electrical

Industries.

30 Minimum Oil circuit breaker above 11 KV and upto 33 KV :

a) Asea Brown Boveri

Ltd.,

b) CG Ltd., c) Jyothi Ltd., d) Mysore Electrical

Industries Ltd.,

e) The Aluminum

Industries Ltd.,

31 Electrically driven submersible pump set with built in non-return valve as per

IS: 8034 (latest) along with wet type 3 ph. Motor as per IS: 9283 (latest)

suitable for 440/380V 50 Hz 3 phase supply and suitable for operation in 150

mm dia bore wells :

a) CALAMA b) Chetsan c) Waterman d) Flotech

e) CGL f) CGL g) Jyothi h) KK pumps

i) KSB j) Suguna

32 Low Tension Air Circuit Breakers conforming to IS: 2516 (latest) :

a) Siemens Ltd., b) L & T Ltd., c) GEC Alsthom India

Ltd.,

d) Compton Greaves

Ltd.,

e) Controls & Switchgear

Co Ltd.,

f) Jyothi g) Mysore Electrical

industries Ltd.,

h) BCH

41

33 Heavy duty propeller type AC Ventilating fans (Exhaust Fans) conforming to

IS: 2312 / 1967 with Amdt. No.1 to 8 complete with mounting rings frame with

four fixing holes but without regulator and louver shutters :

a) GEC Alsthom India

Ltd.,

b) Almonard Pvt Ltd., c) Usha Intenational Ltd., d) Bajaj Electricals

Ltd.,

e) Crompton Greaves Ltd.,

f) Khaitan

33.1 Heavy Duty Properller type AC Ventilating fans (Exhaust Fans) with

synthetic / plastic / fibre body with fibre vanes confirming to IS : 2312 – 1967

with Amdt No. 1 to 8 complete with mounting rings frame with four fixing

holes but without regulator and louver shutters :

a) GEC Alsthom India

Ltd.,

b) Almonard Pvt Ltd., c) Usha Intenational Ltd., d) Bajaj Electricals

Ltd.,

e) Crompton Greaves

Ltd.,

f) Khaitan

34 Heavy duty Air Circulator fan, bracket wall mounting type with oscillating

facility, ¾ blades, impeller dia.600/610, suitable to work on 220/240V, 50Hz

AC single phase supply and confirming to IS:2997/1964 or latest :

a) Almonard Pvt Ltd., b) GEC Alsthom India

Ltd.,

c) Khaitan

35 Wall mounting bracket fan, oscillating type, suitable for operation on

220/240V, single phase 50Hz AC supply with built in regulator and

confirming to IS: 556/1979 or latest :

a) GEC Alsthom India

Ltd.,

b) Almonard Pvt Ltd., c) Usha International Ltd. d) Bajaj Electricals

Ltd.,

e) Crompton Greaves Ltd.,

f) Khaitan

36 7.5 / 10 Ton package type AC plant confirming to IS: 8148/1976 or latest :

a) Blue Star Ltd., b) Voltas Ltd., c) Lloyd Corporation

Ltd.,

d) Carrier Air Con

Ltd.,

e) Sidwal Refrigeration

Industries Pvt Ltd.,

f) Amtrex g) Shriram h) Videocon

37 Split type room air conditioners up to 5 Ton confirming to IS : 1391 (Part-II /

1992 or latest) :

a) Voltas Ltd., b) Carrier Air Con.

Ltd.,

c) Blue Star Ltd., d) Fedders Lloyd

e) Usha f) Sidwal Refrigeration

Industries Pvt

Ltd.

g) LG Electronics India

Ltd,.

h) Samsung

i) Dalkan j) Amtrex k) Onida l) Hitachi

m) Videocon

38 Starting / running capacitor for hermetically sealed compressor suitable for

operation on 230V 50Hz AC supply confirming to IS: 2993 / 1975 :

a) Dhandapani & Co. Ltd., b) Kerala State Elec -

tronic Develop -

ment Corporation.

c) Concap Capacitors d) Trishala Electro –

lytics Pvt Ltd.,

e) Stumpp Schedule and

Somappa Ltd.,

39 UPS System 7.5 KVA and above with SMF VRLA batteries for 1,2,4 hrs

backup (Battery make : Exide, Panasonic, Hitachi, Amarraja, CSB HBLNife,

Global, Yuasa only) :

a) Tata Libert Ltd.,

(Emerson)

b) Kirloskar Electric c) Siemens d) Aplab Ltd.,

e) APC f) Electronics &

Control Power

System Pvt. Ltd.,

g) Numeric Power h) A.Z. Electronics

42

40 UPS System Upto 5 KVA with SMF VRLA batteries for 1,2,4 hrs backup

(Batery make : Exide, Panasonic, Hitachi, Amarraja, CSB HBLNife, Global,

Yuasa only) :

a) Kirloskar Electric b) Siemens c) Aplab Ltd., d) Vintec Electro-nic

Pvt Ltd.,

e) Numeric Power f) A.Z. Electronics g) Electronics & Control

Power System Pvt.

Ltd.,

41 High mast lighting system with nominal mounting height in the range from

15m to 40 m. Mast shaft shall be made of best steel grade in compliance with

BSEN 10025 FE 510C incl. fabricated lantern carriage for fixing and holding

the flood light fitting :

a) Philips India Ltd., b) Bajaj Electricals

Ltd.,

c) Crompton Greaves

Ltd.,

42 LT Power capacitors of rating 1.0 to 25.0 KVAR Confirming to IS: 2843 /

1986 or latest and ISI marked :

a) Unistar Capacitors b) Shakti Capacitors

Pvt Ltd.,

c) CGL d) Hind Rectofiers

Ltd.,

e) Madhav Capacitors Pvt

Ltd.,

f) Yesha Electricals Pvt

Ltd.,

g) Asian Power Capaci –

tors (EPCOS)

h) BCH

i) Asea Brown Boveri Ltd., j) BHEL k) Indian Capacitors l) Shreem

m) WS Insulators

43 Switch fuse units 32A – 1200A Upto 85 KA Confirming to IS: 10027 / 2000 :

a) Control & Switch gear

Co Ltd.,

b) BCH c) Asea Brown Boveri

Ltd.,

d) CGL

e) GE f) Jyothi g) L & T h) Mysore Electronic

i) NGEF j) Siemens k) Indo kopp l) HPL India Ltd.,

m) Standard n) Indo-Asian o) Kenbar p) Havells

44 Change over switches Upto 800A conforming to IS: 13947 (Part I & III) / 1983

:

a) C & G Co Ltd., b) Standard Electricals

Ltd.,

c) GE d) Siemens

e) L&T f) Indo Kopp g) HPL India Ltd., h) Havells

i) Andrew Yule j) Jyothi k) BCH l) Indo-Asian

m) CGL

45 HRC fuses 6A – 630A conforming to IS: 13703 :

a) C&S Co Ltd., b) Standard Electricals

Ltd.,

c) GE d) Siemens

e) L & T f) Indo Kopp g) HPS India Ltd., h) Havells

i) BCH j) CGL

46 On load change over switch 63A – 3150A Conforming to IS : 13947 (Part I &

III) / 1993 :

a) HPL India Ltd., b) C&S Co. Ltd., c) Standard Electricals

Ltd.,

d) GE

f) Siemens g) L & T h) Indo Kopp i) Havells

j) Andrew Yule k) Jyothi l) Indo-Asian m) BCH

n) CGL

47 RCCB’s 25A , 40A, 63A Conforming to IS: 21640 (Part-1) / 2000 :

a) Standard Electricals

Ltd.,

b) HPL India Ltd., c) C & S Co. Ltd., d) GE

f) Siemens g) L & T h) Indo Kopp i) Havells

j) BCH k) CGL

43

48 Distribution boards conforming to IS: 8623 :

a) Standard Electricals

Ltd.,

b) HPL India Ltd., c) C&S Co. Ltd., d) GE

e) Siemens f) L & T g) Indo Kopp h) Havells

i) BCH j) CGL

49 AC drives / soft starters :

a) BCH b) AAB c) Siemens d) L & T

50 DOL & Stradelta Starters conforming to IS: 8544 (Part-I) :

a) BCH b) Standard Electricals

Ltd.,

c) HPL India Ltd., d) C&S Co. Ltd.,

e) GE f) Siemens g) L & T h) Indo Kopp

i) Havells j) Jyothi k) CGL

51 Plug & Socket :

a) BCH b) Standard Electri –

cals Ltd.,

c) HPL India Ltd., d) C&S Co. Ltd.,

e) GE f) Siemens g) L & T h) Indo Kopp

i) Havells j) CGL

52 IP55 / IP66 Boxes & enclosures :

a) BCH b) Standard Electri-cals

Ltd.,

c) HPL India Ltd., d) C&S Co. Ltd.,

e) GE f) siemens g) L & T h) Indo Kopp

i) Havells j) CGL

53 L.T.MCCS / PCCS :

a) BCH b) Standard Electri –

cals Ltd.,

c) HPL India Ltd., d) C&S Co. Ltd.,

e) GE f) Siemens g) L & T h) Indo Kopp

i) Havells j) CGL

54 Special Cables – Halogen free cable :

a) BCH b) Polycab c) Havells

55 ISI Marked Welding cables Conforming to IS: 9857 / 1990 :

a) Kukreja Engineer b) S.S. Cables &

Equipment (P) Ltd.,

c) HPL India Ltd., d) C&S Co. Ltd.,

e) GE f) Siemens g) L & T h) Indo Kopp

i) Havells j) CGL

56 Electronic over current relay :

a) BCH b) Standard Electricals

Ltd.,

c) HPL India Ltd., d) C&S Co. Ltd.,

e) GE f) Siemens g) L & T h) Indo Kopp

i) Havells j) CGL

57 Portable Gen sets upto 3 KVA (Petrol start-kerosene run) Conforming to IS:

12824 / 1989 :

a) Honda self b) Greaves Cotton c) Birla Yamaha

58 DG Sets Above 250 KVA as per SCRlys Specn. No.E/WC/DG/1/2002 (R1) :

a) Engineer – Cummins

India Ltd.,

Greaves Ltd., Diesel

Engine

Kirloskar Oil Engines

Ltd.,

b) Alternator KEC Ltd., Jyothi Kerla Electricals Allied

Engineering Co Ltd.,

Stamford

58.1 DG Sets 75 KVA to 250 KVA as per SCRlys Specn. No.E/WC/DG/2/ 2002

(R1) :

a) Engineer – Cummins

India Ltd.,

Greaves Ltd., Diesel

Engine

Kirloskar Oil Engines

Ltd.,

b) Alternator – KEC Ltd., Jyothi Kerla Electricals Allied

Engineering Co Ltd.,

Crompton Greaves

44

58.2 DG Sets above 3 KVA and below 75 KVA as per SCRlys Specn. No.

E/WC/DG/3/2002 (R1) :

a) Engineer – Cummins

India Ltd.,

Greaves Ltd., Diesel

Engine

Kirloskar Oil Engines

Ltd.,

b) Alternator – KEC Ltd., Jyothi Kerla Electricals Allied

Engineering Co Ltd.,

Crompton Greaves

59 Centrifugal pump set conforming to IS: 1520 / 1980 or latest edition :

a) Kirloskar Brothers b) Jyothi c) KSB d) Mather & Plant

e) Suguna

60 Integrated compact Fluorescent Lamp Direct Fit 11W, 18W, 25W & 36W :

a) Indo Asian b)Philips c) Wipro d) Osram

e) CGL f) Surya g) GEC h) Bajaj

60.1 Non-integrated Compact Fluorescent Lamp – Pin type 11W, 18W, 25W &

36W :

a) Indo Asian b)Philips c) Wipro d) Osram

e) CGL f) Surya g) GEC h) Bajaj

61 PVC Insulated Multi-strand Copper Conductor Cable for House wiring 1.5,

2.5 & 4 Sq mm :

a) Indo Asian b)Finolex c) Finecab d) Anchor

e) RPG f) Havells g) Torrent

62 Metal Halide Lamps, Ballast, Ignitor and Luminaires (With IP65 Protection) :

a) Venture b) Osram c) Philips d) Wipro

e) Bajaj f) Crompton

63 Pumps for Desert Coolers :

a) CGL b) Khaitan c) Tullu d) Cool Home

e) Kelley f) HMI g) Begal h) MBH Pump

i)GEC

64 3 Phase Induction Motor IS No.325 / 1996 :

a) Kirloskar b) Bharat Bijlee c) CGL d) ALSTOM

e) Hindustan Brown Boveri

Ltd.,

65 Shunt Capacitor (Upto 30 KVAR 415V) Conforming to IS: 834 / 1986 :

a) Indian Condensers b) Hind Rectifier c) Voltas d) BHEL

e) ABB f) Asian Power Cor –

porators (EPCOS)

66 Capacitors (For FL Tubes & Sodium Vapour Lamps Conforming to IS:

No.1569 / 1976 (With amendment No.1) For Fans Conforming to IS: No.1709 /

1984 Capacity 2.0 Mfd to 8 Mfd For Motors Conforming to IS: No.2993/1975

paper capacitor 3 to 36 Mfd Electrolytic Capacitor 40 to 200 Mfd :s

a) Voltas b) BHEL c) KELTRON d) Asian Power

Corporators

(EPCOS)

67 Hermetically sealed compressor 1.5 TR/1TR Capacity suitable to work on

240V, 50Hz Single phase AC supply. The compressor shall be completed and

conforming to IS: 10617 / 1983 :

a) Tecumsah b) Kirloskar c) Voltas d) Carrier

68 Measuring instruments (Electrical) Analog / digital Viz., Insulator, Megger,

Conductivity meter, Clamp-on meter, Trivector meter etc. :

a) Automatic Electric Ltd.., b) Havells c) MECO Insturments

Ltd.,

d) Motwani

e) L & T (Rishab) f) JMD Power Ltd., g) Shanthi h) CIE

i) Electrical and Electro-nic

Devices

j) National

Insturuments Ltd.,

h) Sivananda Electro-nics

Devtall.

45

69 Time Switch (Timer) :

a) MDS Legrand b) Havells c) L & T

70 HT Protective Relays :

a) Alsthom b) L & T c) Siemens d) Asean Brown

Boveri

e) Essun Rey Roller Ltd.,

71 Modular Switches :

a) Anchor b) Roma c) Woods d) Havells

e) Crab-tree f) Indo Asia

72 Exhaust Fans with fibre body with louvers :

a) Khaitan b) Usha c) Bajaj d) Polar

NB-1: For Item 24, no RC source is available as on date since RC validity expired on 31.12.2006.

Such sources are therefore indicated in column “Sources under consideration”.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

Any of the approved brand materials only should be supplied / provided.

03 sets of samples of materials have to be submitted and got approved before they are used.

For further Information Contact:

Name : Raj Kumar T

E-Mail : srdeemgtl@scr.railnet.gov.in

Phone Office : 08552-226750

 

 

 